X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405052211020

Well Details

Well ID: 0405052211020
Loading map...
Location: 02/11-22-040-05W5/0
Location Alias: 02/11-22-40-05 W5M
Location Alias 2: 02/11-22-040-05 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 05
Section: 22
County/Municipality: Clearwater County
Well Name: BACCALIEU HZ 102 WILLGR 11-22-40-5
Operator Name: Baccalieu Energy Inc.
License Number: 0494970
License Date: 2019-06-25
License Status: Issued
Spud Date: 2019-07-05
Final Drill Date: 2019-07-13
Well Total Depth: 4617.00 m
Surface Hole Latitude: 52.451734
Surface Hole Longitude: -114.672583

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-07-04 Horizon Drilling Inc. 2 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-07-07 1587.90 Deviate (5 - 79 degrees)
2019-07-08 1979.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-07 Multi-Stage Fracture 4556.40 4557.10 0
2019-08-08 Multi-Stage Fracture 4092.70 4093.40 0
2019-08-08 Multi-Stage Fracture 4038.50 4039.20 0
2019-08-08 Multi-Stage Fracture 3984.20 3984.90 0
2019-08-08 Multi-Stage Fracture 3930.10 3930.70 0
2019-08-08 Multi-Stage Fracture 3877.10 3877.80 0
2019-08-08 Multi-Stage Fracture 3822.60 3823.30 0
2019-08-08 Multi-Stage Fracture 3768.90 3769.60 0
2019-08-08 Multi-Stage Fracture 3714.90 3715.60 0
2019-08-08 Multi-Stage Fracture 3659.80 3660.50 0
2019-08-08 Multi-Stage Fracture 3600.00 3600.70 0
2019-08-07 Multi-Stage Fracture 4515.80 4516.50 0
2019-08-08 Multi-Stage Fracture 3546.30 3547.00 0
2019-08-08 Multi-Stage Fracture 3492.50 3493.20 0
2019-08-08 Multi-Stage Fracture 3438.60 3439.30 0
2019-08-08 Multi-Stage Fracture 3384.70 3385.40 0
2019-08-08 Multi-Stage Fracture 3330.90 3331.60 0
2019-08-08 Multi-Stage Fracture 3277.00 3277.70 0
2019-08-08 Multi-Stage Fracture 3223.20 3223.90 0
2019-08-08 Multi-Stage Fracture 3169.30 3170.00 0
2019-08-08 Multi-Stage Fracture 3115.40 3116.10 0
2019-08-08 Multi-Stage Fracture 3061.30 3062.30 0
2019-08-07 Multi-Stage Fracture 4461.90 4462.60 0
2019-08-08 Multi-Stage Fracture 3007.70 3008.40 0
2019-08-08 Multi-Stage Fracture 2953.90 2954.60 0
2019-08-08 Multi-Stage Fracture 2900.00 2900.70 0
2019-08-08 Multi-Stage Fracture 2846.80 2847.50 0
2019-08-08 Multi-Stage Fracture 2792.30 2793.00 0
2019-08-08 Multi-Stage Fracture 2738.40 2739.10 0
2019-08-08 Multi-Stage Fracture 2684.60 2685.30 0
2019-08-08 Multi-Stage Fracture 2630.70 2631.40 0
2019-08-08 Multi-Stage Fracture 2576.80 2577.50 0
2019-08-08 Multi-Stage Fracture 2523.00 2523.70 0
2019-08-07 Multi-Stage Fracture 4408.10 4408.80 0
2019-08-08 Multi-Stage Fracture 2469.10 2469.80 0
2019-08-08 Multi-Stage Fracture 2415.30 2416.00 0
2019-08-08 Multi-Stage Fracture 2361.40 2362.10 0
2019-08-08 Multi-Stage Fracture 2307.50 2308.20 0
2019-08-08 Multi-Stage Fracture 2253.70 2254.40 0
2019-08-09 Multi-Stage Fracture 2199.80 2200.50 0
2019-08-09 Multi-Stage Fracture 2146.00 2146.70 0
2019-08-09 Multi-Stage Fracture 2092.10 2092.80 0
2019-08-09 Multi-Stage Fracture 2038.20 2038.90 0
2019-08-07 Multi-Stage Fracture 4362.70 4363.40 0
2019-08-07 Multi-Stage Fracture 4309.00 4309.70 0
2019-08-07 Multi-Stage Fracture 4255.30 4256.00 0
2019-08-08 Multi-Stage Fracture 4201.10 4201.70 0
2019-08-08 Multi-Stage Fracture 4146.80 4147.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-07 2019-08-09 1,848 5,285 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.892 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.8863 N/A
Water 7732-18-5 100 93.2881 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 6.7118 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0273 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0273 N/A
ELEBR-4 Element Breaker Ammonium persulfate 7727-54-0 100 0.0044 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0944 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0944 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0869 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0869 N/A
ELEScale-2 Element Scale Inhibitor Ethylene Glycol 107-21-1 100 0.0474 N/A
Methanol 67-56-1 100 0.0474 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0474 N/A
Organophosphonate 15827-60-8 100 0.0474 N/A
ELEFE-4 IFTR Element Surfactant Alkylbenzenesulfonic acid Trade Secret 100 0.0474 N/A
Ethylene Glycol 107-21-1 100 0.0474 N/A
Isopropanol 67-63-0 100 0.0474 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0474 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-03 2019-08-08 Surface Water - Lake 6136
2019-08-03 2019-08-03 Central Water Distribution Facility 55
2019-08-02 2019-08-02 Municipal Water 32
2019-08-01 2019-08-02 Municipal Water 50
2019-08-07 2019-08-08 Recycled Fracturing Water (treated at well site) 624

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3005 0.0 0.0 0.0
2020 2125 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-15 No Incident Encountered 0.00 0.00
2019-08-15 No Incident Encountered 0.00 0.00

For data sources see[9]

References