X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405043301000

Well Details

Well ID: 0405043301000
Loading map...
Location: 00/01-33-040-04W5/0
Location Alias: 00/01-33-40-04 W5M
Location Alias 2: 00/01-33-040-04 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 33
County/Municipality: Lacombe County
Well Name: CVE GILBY 1-33-40-4
Operator Name: Cenovus Energy Inc.
License Number: 0151898
License Date: 1992-03-02
License Status: Suspension
Spud Date: 1992-03-12
Final Drill Date: 1992-04-16
Well Total Depth: 3942.00 m
Surface Hole Latitude: 52.489286
Surface Hole Longitude: -114.526642

For data sources see[1][2]

Well History

Date Event
1992-03-02 Obtained License
1992-03-12 Lost Circulation Occurred
1992-03-13 Surface Casing Operation Performed
1992-03-21 Direction Drilling Operation Performed - Horizontal
1992-03-28 Well Log Performed
1992-03-29 Production Casing Operation Performed
1992-04-16 Finished Drilling
1992-04-16 Perforation Treatment Performed - Open-Hole Completion
1992-04-16 Well Mode changed to Drilled and Cased
1992-04-17 Well Log Performed
1992-04-19 Rig Released
1992-04-23 Well Log Performed
1992-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-14 Perforation Treatment Performed - Jet Perforation
1992-10-14 Well Log Performed
1992-10-15 Perforation Treatment Performed - Cement Squeeze
1992-10-16 Perforation Treatment Performed - Fractured
1992-10-16 Perforation Treatment Performed - Jet Perforation
1992-10-16 Well Log Performed
1992-10-21 Well Log Performed
1992-10-24 Perforation Treatment Performed - Fractured
1992-10-29 Well Log Performed
1992-10-31 Perforation Treatment Performed - Cement Squeeze
1992-11-03 Well Log Performed
1992-11-04 Perforation Treatment Performed - Jet Perforation
1992-11-10 Perforation Treatment Performed - Fractured
1994-11-01 Well Began Production
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Flowing
2000-02-07 Well Fluid changed to Crude Oil
2000-02-07 Well Mode changed to Flowing
2006-02-18 Well Fluid changed to Crude Oil
2006-02-18 Well Mode changed to Pumping
2015-03-01 Well Fluid changed to Crude Oil
2015-03-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-03-21 2149.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-04-16 Open Hole/Barefoot Completion 2368.00 3942.00 0
1992-11-04 Perforation 2239.80 2240.30 78
1992-11-10 Fracture 2239.80 2240.30 0
1992-10-14 Packing Device Capped w/Cement 2283.00 2295.00 0
1992-10-14 Perforation 2253.00 2254.00 17
1992-10-14 Perforation 2257.00 2258.00 17
1992-10-15 Cement Squeeze 2253.00 2258.00 0
1992-10-16 Perforation 2238.50 2241.50 17
1992-10-16 Fracture 2238.50 2241.50 0
1992-10-24 Fracture 2238.50 2241.50 0
1992-10-31 Cement Squeeze 2238.50 2241.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 24 0.0 0.0 0.0
1994 1464 0.0 0.0 0.0
1995 957 0.0 0.0 0.0
1997 550 0.0 0.0 0.0
2000 7435 0.0 0.0 0.0
2001 7735 0.0 0.0 0.0
2002 7505 0.0 0.0 0.0
2003 7574 0.0 0.0 0.0
2004 8023 0.0 0.0 0.0
2005 5318 0.0 0.0 0.0
2006 2990 0.0 0.0 0.0
2007 8225 0.0 0.0 0.0
2008 8385 0.0 0.0 0.0
2009 8519 0.0 0.0 0.0
2010 8476 0.0 0.0 0.0
2011 8487 0.0 0.0 0.0
2012 7128 0.0 0.0 0.0
2013 3141 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-03-12 Lost Circulation 85.00 85.00

For data sources see[7]

References