If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0405041012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.430125,"lon":-114.502775,"icon":""}]} |
Location: 00/12-10-040-04W5/0 | |
Location Alias: 00/12-10-40-04 W5M | |
Location Alias 2: 00/12-10-040-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 5 | |
Range: 04 | |
Section: 10 | |
County/Municipality: Clearwater County | |
Well Name: OEI GILBY 12-10-40-4 | |
Operator Name: Gain Energy Ltd. | |
License Number: 0027441 | |
License Date: 1964-12-29 | |
License Status: Abandoned | |
Spud Date: 1965-01-02 | |
Final Drill Date: 1965-02-13 | |
Well Total Depth: 2349.40 m | |
Surface Hole Latitude: 52.430125 | |
Surface Hole Longitude: -114.502775 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-12-29 | Obtained License |
1965-01-02 | Lost Circulation Occurred |
1965-01-06 | Blowout Occurred |
1965-01-14 | Blowout Occurred |
1965-01-24 | Drill Stem Test Performed |
1965-01-25 | Drill Stem Test Performed |
1965-01-29 | Drill Stem Test Performed |
1965-02-07 | Drill Stem Test Performed |
1965-02-09 | Drill Stem Test Performed |
1965-02-13 | Finished Drilling |
1965-02-13 | Well Mode changed to Drilled and Cased |
1965-02-14 | Drill Stem Test Performed |
1965-02-15 | Production Casing Operation Performed |
1965-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-03 | Perforation Treatment Performed - Acid Wash - No Pressure |
1965-03-03 | Perforation Treatment Performed - Bullet Perforation |
1965-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-04 | Perforation Treatment Performed - Bullet Perforation |
1965-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-03-19 | Perforation Treatment Performed - Jet Perforation |
1965-03-20 | Well Began Production |
1965-03-20 | Well Fluid changed to Crude Oil |
1965-03-20 | Well Mode changed to Flowing |
1965-07-29 | Perforation Treatment Performed - Jet Perforation |
1965-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-07-31 | Perforation Treatment Performed - Fractured |
1988-10-20 | Well Fluid changed to Crude Oil |
1988-10-20 | Well Mode changed to Suspended |
1992-06-19 | Perforation Treatment Performed - Cement Squeeze |
1992-06-19 | Plug Back Performed |
1992-06-19 | Well Fluid changed to Crude Oil |
1992-06-19 | Well Mode changed to Abandoned Zone |
1992-09-16 | Perforation Treatment Performed - Jet Perforation |
1992-09-16 | Well Fluid changed to Crude Oil |
1992-09-16 | Well Mode changed to Suspended |
1999-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-08-30 | Plug Back Performed |
1999-08-30 | Well Log Performed |
1999-09-01 | Well Log Performed |
1999-09-02 | Well Log Performed |
1999-09-09 | Perforation Treatment Performed - Cement Plug |
2000-06-02 | Perforation Treatment Performed - Jet Perforation |
2000-06-04 | Perforation Treatment Performed - Remedial Casing |
2000-07-19 | Well Abandoned |
2000-07-19 | Well Fluid changed to Crude Oil |
2000-07-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-03-03 | Bullet Perforation | 2233.90 | 2234.80 | 7 |
1965-07-29 | Perforation | 2051.60 | 2052.20 | 7 |
1965-07-30 | Acid Treatment | 2048.30 | 2052.20 | 0 |
1965-07-31 | Fracture | 2048.30 | 2052.20 | 0 |
1992-06-19 | Cement Squeeze | 2048.30 | 2052.20 | 0 |
1992-09-16 | Perforation | 2239.70 | 2242.70 | 7 |
1999-08-30 | Packing Device Capped w/Cement | 2212.00 | 2220.00 | 0 |
1999-09-09 | Cement Plug | 551.00 | 952.40 | 0 |
2000-06-02 | Perforation | 440.00 | 445.00 | 17 |
2000-06-04 | Remedial Casing Cementing | 440.00 | 445.00 | 0 |
1965-03-03 | Acid Wash | 2233.90 | 2234.80 | 0 |
1965-03-03 | Acid Treatment | 2233.90 | 2234.80 | 0 |
1965-03-04 | Bullet Perforation | 2239.70 | 2242.70 | 7 |
1965-03-04 | Acid Treatment | 2239.70 | 2242.70 | 0 |
1965-03-18 | Packing Device Capped w/Cement | 2095.50 | 2095.50 | 0 |
1965-03-19 | Perforation | 2048.30 | 2049.50 | 7 |
1965-03-19 | Perforation | 2051.30 | 2051.90 | 7 |
1965-07-29 | Perforation | 2049.50 | 2050.40 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1464 | 0.0 | 0.0 | 0.0 |
1969 | 6047 | 0.0 | 0.0 | 0.0 |
1970 | 2714 | 0.0 | 0.0 | 0.0 |
1971 | 2628 | 0.0 | 0.0 | 0.0 |
1972 | 5222 | 0.0 | 0.0 | 0.0 |
1973 | 8709 | 0.0 | 0.0 | 0.0 |
1974 | 8735 | 0.0 | 0.0 | 0.0 |
1975 | 7787 | 0.0 | 0.0 | 0.0 |
1976 | 7988 | 0.0 | 0.0 | 0.0 |
1977 | 7165 | 0.0 | 0.0 | 0.0 |
1978 | 8759 | 0.0 | 0.0 | 0.0 |
1979 | 7135 | 0.0 | 0.0 | 0.0 |
1980 | 5536 | 0.0 | 0.0 | 0.0 |
1981 | 5249 | 0.0 | 0.0 | 0.0 |
1982 | 3130 | 0.0 | 0.0 | 0.0 |
1983 | 3706 | 0.0 | 0.0 | 0.0 |
1985 | 72 | 0.0 | 0.0 | 0.0 |
1988 | 5530 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1965-01-14 | Blowout | 1790.60 | 1790.60 |
1965-01-02 | Lost Circulation | 91.40 | 234.70 |
1965-01-06 | Blowout | 1761.70 | 1761.70 |
For data sources see[6]