X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405033516000

Well Details

Well ID: 0405033516000
Loading map...
Location: 00/16-35-040-03W5/0
Location Alias: 00/16-35-40-03 W5M
Location Alias 2: 00/16-35-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 35
County/Municipality: Lacombe County
Well Name: CVE GILBY 16-35-40-3
Operator Name: Cenovus Energy Inc.
License Number: 0135635
License Date: 1988-08-18
License Status: Amended
Spud Date: 1988-10-12
Final Drill Date: 1988-11-26
Well Total Depth: 2982.00 m
Surface Hole Latitude: 52.493498
Surface Hole Longitude: -114.318817

For data sources see[1][2]

Well History

Date Event
1988-08-18 Obtained License
1988-10-12 Lost Circulation Occurred
1988-10-14 Surface Casing Operation Performed
1988-11-02 Drill Stem Test Performed
1988-11-02 Well Log Performed
1988-11-03 Drill Stem Test Performed
1988-11-05 Drill Stem Test Performed
1988-11-08 Intermediate Casing Operation Performed
1988-11-26 Finished Drilling
1988-11-26 Well Log Performed
1988-11-26 Well Mode changed to Drilled and Cased
1988-11-27 Well Log Performed
1988-11-28 Liner Casing Operation Performed
1988-12-01 Rig Released
1988-12-16 Well Log Performed
1988-12-20 Perforation Treatment Performed - Jet Perforation
1988-12-20 Well Log Performed
1988-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-02 Well Began Production
1989-01-02 Well Fluid changed to Crude Oil
1989-01-02 Well Mode changed to Pumping
1989-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-16 Well Fluid changed to Crude Oil
1989-05-16 Well Mode changed to Suspended
1992-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-12 Plug Back Performed
1992-02-12 Well Fluid changed to Crude Oil
1992-02-12 Well Mode changed to Abandoned Zone
1992-02-14 Perforation Treatment Performed - Fractured
1992-02-14 Perforation Treatment Performed - Jet Perforation
1992-02-14 Well Log Performed
1996-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-12-20 Perforation 2860.00 2864.00 13
1988-12-27 Acid Treatment 2860.00 2864.00 0
1989-02-13 Acid Treatment 2860.00 2864.00 0
1992-02-12 Packing Device Capped w/Cement 2842.00 2850.00 0
1992-02-12 Packing Device Capped w/Cement 1980.00 1985.00 0
1992-02-14 Perforation 1948.50 1951.00 14
1992-02-14 Fracture 1948.50 1951.00 0
1996-06-02 Acid Treatment 1948.50 1951.00 0
1999-10-13 Acid Treatment 1948.50 1951.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 822 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-10-12 Lost Circulation 77.00 415.00

For data sources see[6]

References