X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405033406020

Well Details

Well ID: 0405033406020
Loading map...
Location: 02/06-34-040-03W5/0
Location Alias: 02/06-34-40-03 W5M
Location Alias 2: 02/06-34-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 34
County/Municipality: Lacombe County
Well Name: Canlin GILBY 6-34-40-3
Operator Name: Canlin Energy Corporation
License Number: 0124846
License Date: 1986-12-05
License Status: Abandoned
Spud Date: 1986-12-23
Final Drill Date: 1987-01-17
Well Total Depth: 2209.00 m
Surface Hole Latitude: 52.486173
Surface Hole Longitude: -114.352978

For data sources see[1][2]

Well History

Date Event
1986-12-05 Obtained License
1986-12-23 Lost Circulation Occurred
1986-12-24 Surface Casing Operation Performed
1987-01-06 Kick Occurred
1987-01-07 Lost Circulation Occurred
1987-01-11 Lost Circulation Occurred
1987-01-15 Well Log Performed
1987-01-17 Finished Drilling
1987-01-17 Well Mode changed to Drilled and Cased
1987-01-18 Lost Circulation Occurred
1987-01-20 Well Log Performed
1987-01-22 Production Casing Operation Performed
1987-01-22 Rig Released
1987-03-18 Well Log Performed
1987-03-21 Perforation Treatment Performed - Jet Perforation
1987-03-21 Well Log Performed
1987-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-09 Perforation Treatment Performed - Fractured
1987-06-09 Well Log Performed
1987-06-14 Well Began Production
1987-06-14 Well Fluid changed to Crude Oil
1987-06-14 Well Mode changed to Flowing
1988-09-15 Well Fluid changed to Crude Oil
1988-09-15 Well Mode changed to Pumping
2009-08-01 Well Fluid changed to Crude Oil
2009-08-01 Well Mode changed to Suspended
2011-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-29 Plug Back Performed
2011-01-29 Well Fluid changed to Crude Oil
2011-01-29 Well Log Performed
2011-01-29 Well Mode changed to Abandoned Zone
2011-01-30 Perforation Treatment Performed - Jet Perforation
2011-01-30 Well Log Performed
2011-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-01 Perforation Treatment Performed - Cement Squeeze
2011-02-02 Perforation Treatment Performed - Jet Perforation
2011-02-02 Well Log Performed
2011-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-03 Perforation Treatment Performed - Cement Squeeze
2011-03-10 Well Abandoned
2011-03-10 Well Fluid changed to Crude Oil
2011-03-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-03-21 Perforation 2160.00 2170.00 13
2011-02-03 Packing Device Capped w/Cement 470.50 484.00 0
1987-03-25 Acid Treatment 2160.00 2170.00 0
1987-06-09 Fracture 2160.00 2170.00 0
2011-01-29 Packing Device Capped w/Cement 2141.00 2149.00 0
2011-01-30 Perforation 523.00 524.00 13
2011-02-01 Cement Squeeze 523.00 524.00 0
2011-02-01 Packing Device Capped w/Cement 502.10 520.00 0
2011-02-02 Perforation 496.00 497.00 13
2011-02-03 Cement Squeeze 496.00 497.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2625 0.0 0.0 0.0
1988 4914 0.0 0.0 0.0
1989 5996 0.0 0.0 0.0
1990 5568 0.0 0.0 0.0
1991 4049 0.0 0.0 0.0
1994 3552 0.0 0.0 0.0
1995 8599 0.0 0.0 0.0
1996 2016 0.0 0.0 0.0
1997 8602 0.0 0.0 0.0
1998 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-12-23 Lost Circulation 40.00 134.20
1987-01-06 Kick 2127.00 2127.00
1987-01-07 Lost Circulation 2127.00 2127.00
1987-01-11 Lost Circulation 2154.00 2175.00
1987-01-18 Lost Circulation 2209.00 2209.00

For data sources see[6]

References