If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0405033316023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.491154,"lon":-114.365947,"icon":""}]} |
| Location: 02/16-33-040-03W5/3 | |
| Location Alias: 02/16-33-40-03 W5M | |
| Location Alias 2: 02/16-33-040-03 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 33 | |
| County/Municipality: Lacombe County | |
| Well Name: CVE GILBY 16-33-40-3 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0107636 | |
| License Date: 1984-06-14 | |
| License Status: Abandoned | |
| Spud Date: 1984-06-17 | |
| Final Drill Date: 1984-06-29 | |
| Well Total Depth: 2197.00 m | |
| Surface Hole Latitude: 52.491154 | |
| Surface Hole Longitude: -114.365947 |
| Date | Event |
|---|---|
| 1984-06-14 | Obtained License |
| 1984-06-19 | Surface Casing Operation Performed |
| 1984-06-29 | Finished Drilling |
| 1984-06-29 | Well Mode changed to Drilled and Cased |
| 1984-07-01 | Well Log Performed |
| 1984-07-02 | Well Log Performed |
| 1984-07-03 | Production Casing Operation Performed |
| 1984-07-03 | Rig Released |
| 1984-08-09 | Well Log Performed |
| 1984-08-11 | Perforation Treatment Performed - Jet Perforation |
| 1990-04-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1990-04-04 | Perforation Treatment Performed - Fractured |
| 1990-04-04 | Perforation Treatment Performed - Jet Perforation |
| 1990-04-04 | Well Log Performed |
| 1990-04-05 | Perforation Treatment Performed - Fractured |
| 1990-04-17 | Well Log Performed |
| 1992-07-30 | Perforation Treatment Performed - Cement Squeeze |
| 1992-07-31 | Perforation Treatment Performed - Fractured |
| 1992-07-31 | Perforation Treatment Performed - Jet Perforation |
| 1994-09-22 | Well Log Performed |
| 1994-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-09-24 | Plug Back Performed |
| 1994-09-26 | Well Log Performed |
| 1994-09-27 | Perforation Treatment Performed - Fractured |
| 1994-09-27 | Perforation Treatment Performed - Jet Perforation |
| 1994-10-07 | Perforation Treatment Performed - Jet Perforation |
| 1994-10-13 | Well Log Performed |
| 1994-10-14 | Perforation Treatment Performed - Fractured |
| 1994-10-17 | Well Log Performed |
| 1994-10-18 | Perforation Treatment Performed - Fractured |
| 1994-10-18 | Perforation Treatment Performed - Jet Perforation |
| 1995-02-23 | Perforation Treatment Performed - Fractured |
| 1998-03-05 | Well Log Performed |
| 2001-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-11-04 | Plug Back Performed |
| 2001-11-04 | Well Log Performed |
| 2001-11-06 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-07 | Perforation Treatment Performed - Fractured |
| 2001-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-11-09 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-10 | Perforation Treatment Performed - Fractured |
| 2001-11-14 | Perforation Treatment Performed - Jet Perforation |
| 2012-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-05-30 | Perforation Treatment Performed - Jet Perforation |
| 2012-05-30 | Plug Back Performed |
| 2012-05-30 | Well Mode changed to Abandoned Zone |
| 2012-05-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-05-31 | Perforation Treatment Performed - Jet Perforation |
| 2012-05-31 | Perforation Treatment Performed - Remedial Casing |
| 2012-06-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-06-01 | Perforation Treatment Performed - Remedial Casing |
| 2012-06-02 | Well Abandoned |
| 2012-06-02 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-08-11 | Perforation | 2127.00 | 2135.00 | 13 |
| 1994-09-24 | Packing Device Capped w/Cement | 2136.50 | 2144.50 | 0 |
| 1994-09-27 | Perforation | 2132.00 | 2136.00 | 17 |
| 1994-09-27 | Fracture | 2132.00 | 2136.00 | 0 |
| 1994-10-07 | Perforation | 2127.00 | 2132.00 | 17 |
| 1994-10-14 | Fracture | 2127.00 | 2132.00 | 0 |
| 1994-10-18 | Perforation | 2122.00 | 2126.00 | 17 |
| 1994-10-18 | Fracture | 2122.00 | 2126.00 | 0 |
| 1995-02-23 | Fracture | 2122.00 | 2136.00 | 0 |
| 2001-11-04 | Packing Device Capped w/Cement | 2104.00 | 2112.00 | 0 |
| 2001-11-06 | Perforation | 1279.00 | 1284.00 | 20 |
| 1990-04-04 | Acid Wash | 2127.00 | 2135.00 | 0 |
| 2001-11-07 | Fracture | 1279.00 | 1284.00 | 0 |
| 2001-11-09 | Perforation | 1219.50 | 1224.50 | 20 |
| 2001-11-09 | Packing Device Capped w/Cement | 1252.00 | 1260.00 | 0 |
| 2001-11-10 | Fracture | 1219.50 | 1224.50 | 0 |
| 2001-11-14 | Perforation | 1279.00 | 1284.00 | 20 |
| 2012-05-30 | Packing Device Capped w/Cement | 1266.00 | 1274.00 | 0 |
| 2012-05-30 | Packing Device Capped w/Cement | 1202.00 | 1210.00 | 0 |
| 2012-05-30 | Perforation | 499.00 | 500.00 | 17 |
| 2012-05-31 | Remedial Casing Cementing | 499.00 | 500.00 | 0 |
| 2012-05-31 | Packing Device Capped w/Cement | 487.00 | 495.00 | 0 |
| 1990-04-04 | Perforation | 2122.00 | 2126.00 | 13 |
| 2012-05-31 | Perforation | 455.00 | 456.00 | 17 |
| 2012-06-01 | Remedial Casing Cementing | 455.00 | 456.00 | 0 |
| 2012-06-01 | Packing Device Capped w/Cement | 442.00 | 450.00 | 0 |
| 1990-04-04 | Perforation | 2127.00 | 2130.00 | 13 |
| 1990-04-04 | Fracture | 2127.00 | 2130.00 | 0 |
| 1990-04-05 | Fracture | 2122.00 | 2135.00 | 0 |
| 1992-07-30 | Cement Squeeze | 2122.00 | 2135.00 | 0 |
| 1992-07-31 | Fracture | 2147.50 | 2150.50 | 0 |
| 1992-07-31 | Perforation | 2147.50 | 2150.50 | 20 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-06-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]