X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405033304000

Well Details

Well ID: 0405033304000
Loading map...
Location: 00/04-33-040-03W5/0
Location Alias: 00/04-33-40-03 W5M
Location Alias 2: 00/04-33-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 33
County/Municipality: Lacombe County
Well Name: JOURNEY GILBY 4-33-40-3
Operator Name: Journey Energy Inc.
License Number: 0017488
License Date: 1959-07-28
License Status: Suspension
Spud Date: 1959-08-04
Final Drill Date: 1959-09-01
Well Total Depth: 2178.40 m
Surface Hole Latitude: 52.481171
Surface Hole Longitude: -114.382589

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-07-28 Obtained License
1959-08-14 Lost Circulation Occurred
1959-08-21 Drill Stem Test Performed
1959-08-23 Drill Stem Test Performed
1959-08-27 Drill Stem Test Performed
1959-08-29 Drill Stem Test Performed
1959-09-01 Finished Drilling
1959-09-01 Well Mode changed to Drilled and Cased
1959-09-03 Production Casing Operation Performed
1959-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-05 Perforation Treatment Performed - Acid Wash - No Pressure
1959-09-05 Perforation Treatment Performed - Jet Perforation
1959-09-16 Perforation Treatment Performed - Cement Squeeze
1959-09-20 Perforation Treatment Performed - Jet Perforation
1959-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-21 Perforation Treatment Performed - Acid Wash - No Pressure
1959-09-27 Well Began Production
1959-09-27 Well Fluid changed to Crude Oil
1959-09-27 Well Mode changed to Flowing
1959-10-08 Perforation Treatment Performed - Cement Squeeze
1959-10-11 Perforation Treatment Performed - Jet Perforation
1959-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-02 Perforation Treatment Performed - Fractured
1965-06-21 Well Fluid changed to Crude Oil
1965-06-21 Well Mode changed to Suspended
1967-05-06 Well Fluid changed to Crude Oil
1967-05-06 Well Mode changed to Pumping
1972-01-13 Perforation Treatment Performed - Fractured
1972-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-01 Perforation Treatment Performed - Jet Perforation
1972-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-14 Perforation Treatment Performed - Condensate Squeeze
2004-03-01 Well Fluid changed to Crude Oil
2004-03-01 Well Mode changed to Suspended
2005-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-24 Plug Back Performed
2005-03-24 Well Fluid changed to Crude Oil
2005-03-24 Well Mode changed to Abandoned Zone
2005-03-25 Perforation Treatment Performed - Jet Perforation
2005-03-26 Perforation Treatment Performed - Remedial Casing
2005-03-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-05 Perforation 2152.50 2153.70 13
1959-10-11 Perforation 2141.50 2143.00 13
1959-10-15 Acid Treatment 2141.50 2143.00 0
1959-10-18 Acid Treatment 2141.50 2143.00 0
1959-10-24 Acid Treatment 2141.50 2143.00 0
1959-12-02 Fracture 2141.50 2143.00 0
1972-01-13 Fracture 2141.50 2143.00 0
1972-10-31 Acid Treatment 2141.50 2143.00 0
1972-11-01 Perforation 2137.60 2138.50 13
1972-11-01 Perforation 2139.10 2139.70 13
1972-11-01 Perforation 2140.30 2142.70 13
1959-09-05 Acid Wash 2152.50 2153.70 0
1972-11-02 Acid Treatment 2137.60 2142.70 0
1977-07-14 Condensate Squeeze 2137.60 2143.00 0
2005-03-24 Packing Device Capped w/Cement 2118.00 2126.00 0
2005-03-25 Perforation 1304.50 1305.50 14
2005-03-25 Perforation 1233.50 1234.50 14
2005-03-26 Remedial Casing Cementing 1304.50 1305.50 0
2005-03-26 Remedial Casing Cementing 1233.50 1234.50 0
2005-03-28 Remedial Casing Cementing 415.00 416.00 0
1959-09-05 Acid Treatment 2152.50 2153.70 0
1959-09-16 Cement Squeeze 2152.50 2153.70 0
1959-09-20 Perforation 2144.90 2146.40 13
1959-09-20 Perforation 2147.30 2148.50 13
1959-09-21 Acid Wash 2144.90 2148.50 0
1959-09-21 Acid Treatment 2144.90 2148.50 0
1959-10-08 Cement Squeeze 2144.90 2148.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1973 2737 0.0 0.0 0.0
1974 5588 0.0 0.0 0.0
1975 7782 0.0 0.0 0.0
1976 8225 0.0 0.0 0.0
1977 3763 0.0 0.0 0.0
1978 7815 0.0 0.0 0.0
1979 6575 0.0 0.0 0.0
1980 6958 0.0 0.0 0.0
1981 7229 0.0 0.0 0.0
1982 6178 0.0 0.0 0.0
1983 7459 0.0 0.0 0.0
1984 8585 0.0 0.0 0.0
1985 8463 0.0 0.0 0.0
1986 8034 0.0 0.0 0.0
1987 8658 0.0 0.0 0.0
1988 8569 0.0 0.0 0.0
1989 8612 0.0 0.0 0.0
1990 8531 0.0 0.0 0.0
1991 8239 0.0 0.0 0.0
1992 8024 0.0 0.0 0.0
1993 8332 0.0 0.0 0.0
1994 7204 0.0 0.0 0.0
1995 6122 0.0 0.0 0.0
1996 8088 0.0 0.0 0.0
1997 8474 0.0 0.0 0.0
1998 7384 0.0 0.0 0.0
1999 7488 0.0 0.0 0.0
2003 1024 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1959-08-14 Lost Circulation 1969.30 1969.30

For data sources see[6]

References