If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0405033205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.48438,"lon":-114.406517,"icon":""}]} |
| Location: 00/05-32-040-03W5/0 | |
| Location Alias: 00/05-32-40-03 W5M | |
| Location Alias 2: 00/05-32-040-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 32 | |
| County/Municipality: Lacombe County | |
| Well Name: JOURNEY GILBY 5-32-40-3 | |
| Operator Name: Journey Energy Inc. | |
| License Number: 0015808 | |
| License Date: 1958-08-27 | |
| License Status: Suspension | |
| Spud Date: 1958-08-31 | |
| Final Drill Date: 1958-09-20 | |
| Well Total Depth: 2184.80 m | |
| Surface Hole Latitude: 52.484380 | |
| Surface Hole Longitude: -114.406517 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1958-08-27 | Obtained License |
| 1958-08-31 | Lost Circulation Occurred |
| 1958-09-14 | Drill Stem Test Performed |
| 1958-09-16 | Drill Stem Test Performed |
| 1958-09-18 | Drill Stem Test Performed |
| 1958-09-20 | Finished Drilling |
| 1958-09-20 | Well Mode changed to Drilled and Cased |
| 1958-09-21 | Production Casing Operation Performed |
| 1958-09-23 | Perforation Treatment Performed - Bullet Perforation |
| 1958-09-24 | Perforation Treatment Performed - Cement Squeeze |
| 1958-09-25 | Perforation Treatment Performed - Selective Bullet Perforations |
| 1958-09-26 | Perforation Treatment Performed - Bullet Perforation |
| 1958-09-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-04-22 | Well Began Production |
| 1959-04-22 | Well Fluid changed to Crude Oil |
| 1959-04-22 | Well Mode changed to Pumping |
| 1961-05-31 | Well Fluid changed to Crude Oil |
| 1961-05-31 | Well Mode changed to Suspended |
| 1974-02-21 | Well Log Performed |
| 1974-02-25 | Perforation Treatment Performed - Cement Squeeze |
| 1974-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-03-02 | Perforation Treatment Performed - Cement Squeeze |
| 1974-03-02 | Perforation Treatment Performed - Jet Perforation |
| 1974-03-05 | Well Log Performed |
| 1974-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-03-09 | Perforation Treatment Performed - Jet Perforation |
| 1974-03-11 | Perforation Treatment Performed - Fractured |
| 1974-04-03 | Well Fluid changed to Crude Oil |
| 1974-04-03 | Well Mode changed to Suspended |
| 1987-07-30 | Well Log Performed |
| 1987-08-05 | Perforation Treatment Performed - Jet Perforation |
| 1987-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-10-23 | Perforation Treatment Performed - Cement Plug |
| 2001-10-23 | Perforation Treatment Performed - Cement Squeeze |
| 2001-10-23 | Plug Back Performed |
| 2001-10-23 | Well Fluid changed to Crude Oil |
| 2001-10-23 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1958-09-23 | Bullet Perforation | 2114.40 | 2114.70 | 13 |
| 1958-09-28 | Acid Treatment | 2141.20 | 2173.80 | 0 |
| 1974-02-25 | Cement Squeeze | 2141.20 | 2173.80 | 0 |
| 1974-03-02 | Perforation | 2072.60 | 2072.60 | 13 |
| 1974-03-02 | Acid Treatment | 2072.60 | 2072.60 | 0 |
| 1974-03-02 | Cement Squeeze | 2072.60 | 2072.60 | 0 |
| 1974-03-09 | Perforation | 2127.20 | 2128.70 | 7 |
| 1974-03-09 | Perforation | 2129.90 | 2130.90 | 7 |
| 1974-03-09 | Perforation | 2133.00 | 2133.30 | 7 |
| 1974-03-09 | Perforation | 2135.10 | 2136.30 | 7 |
| 1974-03-09 | Acid Treatment | 2127.20 | 2136.30 | 0 |
| 1958-09-24 | Cement Squeeze | 2114.40 | 2114.70 | 0 |
| 1974-03-11 | Fracture | 2127.20 | 2136.30 | 0 |
| 1987-08-05 | Perforation | 2128.50 | 2134.70 | 13 |
| 1987-08-07 | Acid Treatment | 2127.20 | 2136.30 | 0 |
| 2001-10-23 | Cement Squeeze | 2127.20 | 2136.30 | 0 |
| 2001-10-23 | Cement Plug | 2068.20 | 2137.40 | 0 |
| 1958-09-25 | Selective Bullet Perforations | 2141.20 | 2141.20 | 0 |
| 1958-09-26 | Bullet Perforation | 2144.30 | 2145.50 | 13 |
| 1958-09-26 | Bullet Perforation | 2146.10 | 2150.70 | 13 |
| 1958-09-26 | Bullet Perforation | 2153.70 | 2155.90 | 13 |
| 1958-09-26 | Bullet Perforation | 2167.40 | 2168.00 | 13 |
| 1958-09-26 | Bullet Perforation | 2171.10 | 2173.80 | 13 |
| 1958-09-27 | Acid Treatment | 2141.20 | 2173.80 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1958-08-31 | Lost Circulation | 134.10 | 184.40 |
For data sources see[6]