X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405031802000

Well Details

Well ID: 0405031802000
Loading map...
Location: 00/02-18-040-03W5/0
Location Alias: 00/02-18-40-03 W5M
Location Alias 2: 00/02-18-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 18
County/Municipality: Lacombe County
Well Name: JOURNEY GILBY 2-18-40-3
Operator Name: Journey Energy Inc.
License Number: 0028155
License Date: 1965-04-30
License Status: Issued
Spud Date: 1965-05-12
Final Drill Date: 1965-05-24
Well Total Depth: 2179.30 m
Surface Hole Latitude: 52.437561
Surface Hole Longitude: -114.418646

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-04-30 Obtained License
1965-05-24 Finished Drilling
1965-05-24 Well Mode changed to Drilled and Cased
1965-05-28 Production Casing Operation Performed
1965-06-05 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-06-07 Well Began Production
1965-06-07 Well Fluid changed to Crude Oil
1965-06-07 Well Mode changed to Flowing
1965-06-12 Well Fluid changed to Crude Oil
1965-06-12 Well Mode changed to Pumping
1983-05-01 Well Fluid changed to Crude Oil
1983-05-01 Well Mode changed to Suspended
1994-05-28 Well Log Performed
1994-05-29 Perforation Treatment Performed - Cement Squeeze
1994-06-01 Perforation Treatment Performed - Jet Perforation
1994-06-01 Well Log Performed
1994-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-16 Well Fluid changed to Crude Oil
1994-06-16 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-06-05 Hydra Jet Perforation 2152.80 2152.80 0
1965-06-05 Hydra Jet Perforation 2153.10 2153.10 0
1965-06-05 Hydra Jet Perforation 2153.70 2153.70 0
1965-06-05 Acid Treatment 2152.80 2153.70 0
1994-05-29 Cement Squeeze 2152.80 2153.70 0
1994-06-01 Perforation 2148.80 2151.00 13
1994-06-02 Acid Treatment 2148.80 2151.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 946 0.0 0.0 0.0
1968 7775 0.0 0.0 0.0
1969 7803 0.0 0.0 0.0
1970 8352 0.0 0.0 0.0
1971 1991 0.0 0.0 0.0
1983 719 0.0 0.0 0.0
1994 4187 0.0 0.0 0.0
1995 8165 0.0 0.0 0.0
1996 7874 0.0 0.0 0.0
1997 8315 0.0 0.0 0.0
1998 8086 0.0 0.0 0.0
1999 8341 0.0 0.0 0.0
2000 8583 0.0 0.0 0.0
2001 8196 0.0 0.0 0.0
2002 8565 0.0 0.0 0.0
2003 8445 0.0 0.0 0.0
2004 8412 0.0 0.0 0.0
2005 8540 0.0 0.0 0.0
2006 8355 0.0 0.0 0.0
2007 8259 0.0 0.0 0.0
2008 2689 0.0 0.0 0.0
2009 5066 0.0 0.0 0.0
2010 7659 0.0 0.0 0.0
2011 8618 0.0 0.0 0.0
2012 7798 0.0 0.0 0.0
2013 8010 0.0 0.0 0.0
2014 1266 0.0 0.0 0.0
2015 8523 0.0 0.0 0.0
2016 8487 0.0 0.0 0.0
2017 8154 0.0 0.0 0.0
2018 8534 0.0 0.0 0.0
2019 6949 0.0 0.0 0.0
2020 2130 0.0 0.0 0.0

For data sources see[5]

References