If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0405031306002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.441441,"lon":-114.304663,"icon":""}]} |
| Location: 00/06-13-040-03W5/2 | |
| Location Alias: 00/06-13-40-03 W5M | |
| Location Alias 2: 00/06-13-040-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 13 | |
| County/Municipality: Lacombe County | |
| Well Name: CVE GILBY 6-13-40-3 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0017713 | |
| License Date: 1959-09-09 | |
| License Status: Abandoned | |
| Spud Date: 1959-09-21 | |
| Final Drill Date: 1959-11-23 | |
| Well Total Depth: 2648.10 m | |
| Surface Hole Latitude: 52.441441 | |
| Surface Hole Longitude: -114.304663 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1959-09-09 | Obtained License |
| 1959-09-22 | Lost Circulation Occurred |
| 1959-10-07 | Drill Stem Test Performed |
| 1959-10-18 | Drill Stem Test Performed |
| 1959-10-20 | Drill Stem Test Performed |
| 1959-11-22 | Drill Stem Test Performed |
| 1959-11-23 | Finished Drilling |
| 1959-11-23 | Well Mode changed to Drilled and Cased |
| 1959-11-24 | Drill Stem Test Performed |
| 1959-11-28 | Production Casing Operation Performed |
| 1959-12-01 | Perforation Treatment Performed - Jet Perforation |
| 1959-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-06-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-02-08 | Well Log Performed |
| 1989-02-09 | Perforation Treatment Performed - Jet Perforation |
| 1989-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-11-25 | Well Log Performed |
| 2011-11-30 | Well Log Performed |
| 2011-12-02 | Well Log Performed |
| 2011-12-08 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-08 | Well Log Performed |
| 2011-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-12-12 | Perforation Treatment Performed - Cement Squeeze |
| 2011-12-12 | Plug Back Performed |
| 2011-12-12 | Well Mode changed to Abandoned Zone |
| 2011-12-17 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-17 | Perforation Treatment Performed - Remedial Casing |
| 2012-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-06-22 | Perforation Treatment Performed - Jet Perforation |
| 2012-06-22 | Plug Back Performed |
| 2012-06-22 | Well Log Performed |
| 2012-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-06-23 | Well Log Performed |
| 2012-06-24 | Perforation Treatment Performed - Cement Plug |
| 2012-06-25 | Perforation Treatment Performed - Cement Plug |
| 2012-06-25 | Well Log Performed |
| 2012-06-26 | Perforation Treatment Performed - Jet Perforation |
| 2012-06-26 | Well Log Performed |
| 2012-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-06-27 | Perforation Treatment Performed - Jet Perforation |
| 2012-06-27 | Perforation Treatment Performed - Remedial Casing |
| 2012-06-27 | Well Log Performed |
| 2012-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2012-07-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-07-03 | Perforation Treatment Performed - Jet Perforation |
| 2012-07-03 | Perforation Treatment Performed - Remedial Casing |
| 2012-07-03 | Well Log Performed |
| 2012-07-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2012-07-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-07-04 | Perforation Treatment Performed - Remedial Casing |
| 2012-10-31 | Well Abandoned |
| 2012-10-31 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1959-12-01 | Perforation | 2107.70 | 2110.70 | 7 |
| 1989-02-09 | Perforation | 2110.50 | 2117.50 | 13 |
| 1989-02-09 | Perforation | 2114.70 | 2122.00 | 13 |
| 1989-02-24 | Acid Treatment | 2107.70 | 2142.00 | 0 |
| 2011-12-08 | Perforation | 1013.30 | 1014.30 | 17 |
| 2011-12-12 | Acid Treatment | 1013.30 | 1014.30 | 0 |
| 2011-12-12 | Cement Squeeze | 1013.30 | 1014.30 | 0 |
| 2011-12-17 | Perforation | 750.20 | 750.70 | 20 |
| 2011-12-17 | Remedial Casing Cementing | 750.20 | 750.70 | 0 |
| 2012-06-22 | Packing Device Capped w/Cement | 2085.70 | 2093.70 | 0 |
| 2012-06-22 | Perforation | 1289.00 | 1290.00 | 17 |
| 1959-12-01 | Perforation | 2114.10 | 2117.10 | 7 |
| 2012-06-22 | Perforation | 1274.00 | 1275.00 | 17 |
| 2012-06-23 | Packing Device Capped w/Cement | 1395.00 | 1582.00 | 0 |
| 2012-06-24 | Cement Plug | 1213.00 | 1384.00 | 0 |
| 2012-06-24 | Cement Plug | 969.00 | 1200.00 | 0 |
| 2012-06-25 | Cement Plug | 746.00 | 758.00 | 0 |
| 2012-06-26 | Perforation | 472.00 | 473.00 | 17 |
| 2012-06-27 | Remedial Casing Cementing | 472.00 | 473.00 | 0 |
| 2012-06-27 | Packing Device Capped w/Cement | 457.00 | 465.00 | 0 |
| 2012-06-27 | Perforation | 429.00 | 430.00 | 17 |
| 2012-06-27 | Packing Device Capped w/Cement | 410.00 | 418.00 | 0 |
| 1959-12-01 | Perforation | 2119.00 | 2122.00 | 7 |
| 2012-06-27 | Perforation | 389.00 | 390.00 | 17 |
| 2012-06-28 | Acid Treatment | 389.00 | 390.00 | 0 |
| 2012-07-03 | Remedial Casing Cementing | 389.00 | 390.00 | 0 |
| 2012-07-03 | Packing Device Capped w/Cement | 374.00 | 382.00 | 0 |
| 2012-07-03 | Perforation | 350.00 | 351.00 | 17 |
| 2012-07-04 | Acid Treatment | 350.00 | 351.00 | 0 |
| 2012-07-04 | Remedial Casing Cementing | 350.00 | 351.00 | 0 |
| 2012-07-04 | Packing Device Capped w/Cement | 312.00 | 339.00 | 0 |
| 1959-12-01 | Perforation | 2125.10 | 2126.30 | 7 |
| 1959-12-01 | Perforation | 2129.00 | 2132.10 | 7 |
| 1959-12-01 | Perforation | 2140.60 | 2142.40 | 7 |
| 1959-12-12 | Acid Treatment | 2107.70 | 2142.40 | 0 |
| 1974-08-24 | Acid Treatment | 2107.70 | 2142.40 | 0 |
| 1977-06-07 | Acid Treatment | 2107.70 | 2142.40 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1959-09-22 | Lost Circulation | 167.60 | 167.60 |
| 2012-07-05 | No Incident Encountered | 0.00 | 0.00 |
| 2012-07-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]