X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405030508000

Well Details

Well ID: 0405030508000
Loading map...
Location: 00/08-05-040-03W5/0
Location Alias: 00/08-05-40-03 W5M
Location Alias 2: 00/08-05-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 05
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 8-5-40-3
Operator Name: Cenovus Energy Inc.
License Number: 0019478
License Date: 1960-08-04
License Status: Issued
Spud Date: 1960-08-11
Final Drill Date: 1960-08-31
Well Total Depth: 2179.90 m
Surface Hole Latitude: 52.412170
Surface Hole Longitude: -114.388553

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-08-04 Obtained License
1960-08-26 Drill Stem Test Performed
1960-08-27 Drill Stem Test Performed
1960-08-29 Drill Stem Test Performed
1960-08-30 Drill Stem Test Performed
1960-08-31 Drill Stem Test Performed
1960-08-31 Finished Drilling
1960-08-31 Well Mode changed to Drilled and Cased
1960-09-02 Production Casing Operation Performed
1960-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-06 Perforation Treatment Performed - Jet Perforation
1960-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-18 Perforation Treatment Performed - Cement Squeeze
1960-09-22 Perforation Treatment Performed - Jet Perforation
1960-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-04 Well Began Production
1960-10-04 Well Fluid changed to Crude Oil
1960-10-04 Well Mode changed to Flowing
1975-05-30 Well Fluid changed to Crude Oil
1975-05-30 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-09-06 Perforation 2161.00 2161.90 13
1960-09-06 Acid Treatment 2161.00 2161.90 0
1960-09-18 Acid Treatment 2161.00 2161.90 0
1960-09-18 Acid Treatment 2161.00 2161.90 0
1960-09-18 Cement Squeeze 2161.00 2161.90 0
1960-09-22 Perforation 2161.30 2162.60 0
1960-09-23 Acid Treatment 2161.30 2162.60 0
1960-10-01 Acid Treatment 2161.30 2162.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8550 0.0 0.0 0.0
1968 3242 0.0 0.0 0.0
1969 2828 0.0 0.0 0.0
1970 4496 0.0 0.0 0.0
1971 8155 0.0 0.0 0.0
1972 8286 0.0 0.0 0.0
1973 8214 0.0 0.0 0.0
1974 6039 0.0 0.0 0.0
1975 7703 0.0 0.0 0.0
1976 8771 0.0 0.0 0.0
1977 8261 0.0 0.0 0.0
1978 7847 0.0 0.0 0.0
1979 8344 0.0 0.0 0.0
1980 8681 0.0 0.0 0.0
1981 8388 0.0 0.0 0.0
1982 7748 0.0 0.0 0.0
1983 8173 0.0 0.0 0.0
1984 8020 0.0 0.0 0.0
1985 5759 0.0 0.0 0.0
1986 6860 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 7655 0.0 0.0 0.0
1989 5734 0.0 0.0 0.0
1990 6983 0.0 0.0 0.0
1991 8668 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8756 0.0 0.0 0.0
1994 8620 0.0 0.0 0.0
1995 7583 0.0 0.0 0.0
1996 8684 0.0 0.0 0.0
1997 8687 0.0 0.0 0.0
1998 7429 0.0 0.0 0.0
1999 4547 0.0 0.0 0.0
2000 8705 0.0 0.0 0.0
2001 7833 0.0 0.0 0.0
2002 6044 0.0 0.0 0.0
2003 3891 0.0 0.0 0.0
2004 3554 0.0 0.0 0.0
2005 5436 0.0 0.0 0.0
2006 5659 0.0 0.0 0.0
2007 6850 0.0 0.0 0.0
2008 5830 0.0 0.0 0.0
2009 8747 0.0 0.0 0.0
2010 8587 0.0 0.0 0.0
2011 8748 0.0 0.0 0.0
2012 8622 0.0 0.0 0.0
2013 8697 0.0 0.0 0.0
2014 8537 0.0 0.0 0.0
2015 8657 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8526 0.0 0.0 0.0
2018 7172 0.0 0.0 0.0
2019 6766 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References