If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0405021904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.453688,"lon":-114.284156,"icon":""}]} |
| Location: 00/04-19-040-02W5/0 | |
| Location Alias: 00/04-19-40-02 W5M | |
| Location Alias 2: 00/04-19-040-02 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 5 | |
| Range: 02 | |
| Section: 19 | |
| County/Municipality: Lacombe County | |
| Well Name: CVE GILBY 4-19-40-2 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0163732 | |
| License Date: 1994-01-06 | |
| License Status: RecCertified | |
| Spud Date: 1994-01-13 | |
| Final Drill Date: 1994-01-23 | |
| Well Total Depth: 2181.00 m | |
| Surface Hole Latitude: 52.453688 | |
| Surface Hole Longitude: -114.284156 |
| Date | Event |
|---|---|
| 1994-01-06 | Obtained License |
| 1994-01-13 | Lost Circulation Occurred |
| 1994-01-15 | Direction Drilling Operation Performed - Deviate |
| 1994-01-15 | Surface Casing Operation Performed |
| 1994-01-23 | Finished Drilling |
| 1994-01-24 | Well Log Performed |
| 1994-01-25 | Drill Stem Test Performed |
| 1994-01-26 | Drill Stem Test Performed |
| 1994-01-28 | Production Casing Operation Performed |
| 1994-01-28 | Rig Released |
| 1994-02-04 | Well Log Performed |
| 1994-02-12 | Well Log Performed |
| 1994-02-14 | Perforation Treatment Performed - Jet Perforation |
| 1994-02-14 | Well Log Performed |
| 1994-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-02-24 | Perforation Treatment Performed - Alcohol Squeeze |
| 1994-06-21 | Well Mode changed to Drilled and Cased |
| 1996-09-06 | Well Fluid changed to Gas |
| 1996-09-06 | Well Mode changed to Testing |
| 1996-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-09-07 | Plug Back Performed |
| 1996-09-07 | Well Fluid changed to Gas |
| 1996-09-07 | Well Mode changed to Abandoned Zone |
| 1996-09-09 | Perforation Treatment Performed - Jet Perforation |
| 1996-09-10 | Perforation Treatment Performed - Fractured |
| 2000-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-03-14 | Perforation Treatment Performed - Jet Perforation |
| 2000-03-14 | Perforation Treatment Performed - Remedial Casing |
| 2000-03-14 | Plug Back Performed |
| 2000-03-14 | Well Log Performed |
| 2000-03-15 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-01-15 | 591.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-02-14 | Perforation | 2135.00 | 2142.00 | 13 |
| 2000-03-14 | Packing Device Capped w/Cement | 2082.00 | 2090.00 | 0 |
| 2000-03-14 | Perforation | 444.00 | 444.50 | 13 |
| 2000-03-14 | Remedial Casing Cementing | 444.00 | 444.50 | 0 |
| 1994-02-14 | Perforation | 2143.00 | 2153.00 | 13 |
| 1994-02-14 | Perforation | 2154.00 | 2165.00 | 13 |
| 1994-02-17 | Acid Treatment | 2135.00 | 2165.00 | 0 |
| 1994-02-24 | Alchohol Squeeze | 2135.00 | 2165.00 | 0 |
| 1996-09-07 | Packing Device Capped w/Cement | 2121.80 | 2129.80 | 0 |
| 1996-09-09 | Perforation | 2100.00 | 2101.50 | 13 |
| 1996-09-09 | Perforation | 2102.50 | 2104.00 | 13 |
| 1996-09-10 | Fracture | 2100.00 | 2104.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 1342 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1994-01-13 | Lost Circulation | 40.00 | 383.50 |
For data sources see[7]