X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404280404000

Well Details

Well ID: 0404280404000
Loading map...
Location: 00/04-04-040-28W4/0
Location Alias: 00/04-04-40-28 W4M
Location Alias 2: 00/04-04-040-28 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 28
Section: 04
County/Municipality: Lacombe County
Well Name: CALSTAN BENTLEY 4-4V-40-28
Operator Name: Chevron Canada Limited
License Number: 0016265
License Date: 1958-11-19
License Status: RecCertified
Spud Date: 1958-11-23
Final Drill Date: 1958-12-03
Well Total Depth: 1673.40 m
Surface Hole Latitude: 52.407973
Surface Hole Longitude: -113.984096

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-11 Perforation Treatment Performed - Jet Perforation
1958-11-19 Obtained License
1958-12-03 Finished Drilling
1958-12-03 Well Mode changed to Drilled and Cased
1958-12-04 Drill Stem Test Performed
1958-12-05 Production Casing Operation Performed
1958-12-26 Well Began Production
1958-12-26 Well Fluid changed to Crude Oil
1958-12-26 Well Mode changed to Pumping
1973-11-30 Well Fluid changed to Crude Oil
1973-11-30 Well Mode changed to Suspended
1989-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-23 Plug Back Performed
1989-11-07 Perforation Treatment Performed - Jet Perforation
1989-11-12 Perforation Treatment Performed - Remedial Casing
1989-11-23 Well Fluid changed to Crude Oil
1989-11-23 Well Mode changed to Abandoned
1989-11-24 Perforation Treatment Performed - Jet Perforation
1989-11-24 Perforation Treatment Performed - Remedial Casing
1989-11-24 Well Log Performed
1989-11-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-12-11 Perforation 1658.70 1661.80 13
1989-10-23 Packing Device Capped w/Cement 1643.00 1654.00 0
1989-11-07 Perforation 316.50 317.00 48
1989-11-12 Remedial Casing Cementing 316.50 317.00 0
1989-11-24 Perforation 241.90 242.40 56
1989-11-24 Remedial Casing Cementing 241.90 242.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4285 0.0 0.0 0.0
1968 2778 0.0 0.0 0.0
1969 3855 0.0 0.0 0.0
1970 8043 0.0 0.0 0.0
1971 7770 0.0 0.0 0.0
1972 7117 0.0 0.0 0.0
1973 6664 0.0 0.0 0.0

For data sources see[5]

References