X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404272207000

Well Details

Well ID: 0404272207000
Loading map...
Location: 00/07-22-040-27W4/0
Location Alias: 00/07-22-40-27 W4M
Location Alias 2: 00/07-22-040-27 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 27
Section: 22
County/Municipality: Lacombe County
Well Name: VESTA JOFFRE 7-22-40-27
Operator Name: Vesta Energy Ltd.
License Number: 0479840
License Date: 2016-07-06
License Status: Amended
Spud Date: 2016-07-16
Final Drill Date: 2016-07-29
Well Total Depth: 4787.00 m
Surface Hole Latitude: 52.478336
Surface Hole Longitude: -113.809236

For data sources see[1][2]

Well History

Date Event
2016-06-18 Conductor Casing Operation Performed
2016-07-06 Obtained License
2016-07-18 Surface Casing Operation Performed
2016-07-20 Direction Drilling Operation Performed - Deviate
2016-07-23 Direction Drilling Operation Performed - Horizontal
2016-07-29 Finished Drilling
2016-07-29 Well Log Performed
2016-07-29 Well Mode changed to Drilled and Cased
2016-07-31 Production Casing Operation Performed
2016-07-31 Rig Released
2016-08-11 Perforation Treatment Performed - Jet Perforation
2016-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-12 Perforation Treatment Performed - Jet Perforation
2016-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-13 Perforation Treatment Performed - Jet Perforation
2016-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-14 Perforation Treatment Performed - Jet Perforation
2016-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-15 Perforation Treatment Performed - Jet Perforation
2016-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-16 Perforation Treatment Performed - Jet Perforation
2016-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-17 Perforation Treatment Performed - Jet Perforation
2016-08-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-18 Perforation Treatment Performed - Jet Perforation
2016-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-19 Perforation Treatment Performed - Jet Perforation
2016-08-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-20 Perforation Treatment Performed - Jet Perforation
2016-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-01 Well Fluid changed to Crude Oil
2016-09-01 Well Mode changed to Drilling and Completing
2016-10-01 Well Began Production
2016-10-01 Well Fluid changed to Crude Oil
2016-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-07-20 2038.90 Deviate (5 - 79 degrees)
2016-07-23 2538.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-08-11 Perforation 4712.00 4760.00 16
2016-08-12 Multi-Stage Fracture 4495.00 4541.00 0
2016-08-12 Perforation 4440.00 4488.00 16
2016-08-12 Multi-Stage Fracture 4440.00 4488.00 0
2016-08-12 Perforation 4386.00 4434.00 16
2016-08-12 Multi-Stage Fracture 4386.00 4434.00 0
2016-08-12 Perforation 4333.00 4379.00 16
2016-08-12 Multi-Stage Fracture 4333.00 4379.00 0
2016-08-13 Perforation 4277.00 4325.00 16
2016-08-13 Multi-Stage Fracture 4277.00 4325.00 0
2016-08-13 Perforation 4223.00 4270.00 16
2016-08-11 Multi-Stage Fracture 4712.00 4760.00 0
2016-08-13 Multi-Stage Fracture 4223.00 4270.00 0
2016-08-13 Perforation 4168.00 4216.00 16
2016-08-13 Multi-Stage Fracture 4168.00 4216.00 0
2016-08-13 Perforation 4114.00 4162.00 16
2016-08-13 Multi-Stage Fracture 4114.00 4162.00 0
2016-08-14 Perforation 4060.00 4107.00 16
2016-08-14 Multi-Stage Fracture 4060.00 4107.00 0
2016-08-14 Perforation 4005.00 4053.00 16
2016-08-14 Multi-Stage Fracture 4005.00 4053.00 0
2016-08-14 Perforation 3951.00 3997.50 16
2016-08-11 Perforation 4658.00 4706.00 16
2016-08-14 Multi-Stage Fracture 3951.00 3997.50 0
2016-08-15 Perforation 3896.00 3944.00 16
2016-08-15 Multi-Stage Fracture 3896.00 3944.00 0
2016-08-15 Perforation 3842.00 3890.00 16
2016-08-15 Multi-Stage Fracture 3842.00 3890.00 0
2016-08-15 Perforation 3788.00 3835.00 16
2016-08-15 Multi-Stage Fracture 3788.00 3835.00 0
2016-08-16 Perforation 3733.00 3781.00 16
2016-08-16 Multi-Stage Fracture 3733.00 3781.00 0
2016-08-16 Perforation 3679.00 3726.00 16
2016-08-11 Multi-Stage Fracture 4658.00 4706.00 0
2016-08-16 Multi-Stage Fracture 3679.00 3726.00 0
2016-08-16 Perforation 3623.00 3672.00 16
2016-08-16 Multi-Stage Fracture 3623.00 3672.00 0
2016-08-16 Perforation 3570.00 3617.00 16
2016-08-16 Multi-Stage Fracture 3570.00 3617.00 0
2016-08-16 Perforation 3516.00 3563.00 16
2016-08-16 Multi-Stage Fracture 3516.00 3563.00 0
2016-08-16 Perforation 3461.00 3509.00 16
2016-08-16 Multi-Stage Fracture 3461.00 3509.00 0
2016-08-16 Perforation 3407.00 3455.00 16
2016-08-11 Perforation 4605.00 4651.00 16
2016-08-16 Multi-Stage Fracture 3407.00 3455.00 0
2016-08-17 Perforation 3352.00 3400.00 16
2016-08-17 Multi-Stage Fracture 3352.00 3400.00 0
2016-08-17 Perforation 3298.00 3346.00 16
2016-08-17 Multi-Stage Fracture 3298.00 3346.00 0
2016-08-17 Perforation 3244.00 3290.00 16
2016-08-17 Multi-Stage Fracture 3244.00 3290.00 0
2016-08-17 Perforation 3190.00 3237.00 16
2016-08-17 Multi-Stage Fracture 3190.00 3237.00 0
2016-08-17 Perforation 3135.00 3182.00 16
2016-08-11 Multi-Stage Fracture 4605.00 4651.00 0
2016-08-17 Multi-Stage Fracture 3135.00 3182.00 0
2016-08-18 Perforation 3080.00 3128.00 16
2016-08-18 Multi-Stage Fracture 3080.00 3128.00 0
2016-08-18 Perforation 3026.00 3074.00 16
2016-08-18 Multi-Stage Fracture 3026.00 3074.00 0
2016-08-18 Perforation 2972.00 3019.00 16
2016-08-18 Multi-Stage Fracture 2972.00 3019.00 0
2016-08-18 Perforation 2917.00 2965.00 16
2016-08-18 Multi-Stage Fracture 2917.00 2965.00 0
2016-08-19 Perforation 2863.00 2910.00 16
2016-08-11 Perforation 4549.00 4597.00 16
2016-08-19 Multi-Stage Fracture 2863.00 2910.00 0
2016-08-19 Perforation 2814.00 2856.00 16
2016-08-19 Multi-Stage Fracture 2814.00 2856.00 0
2016-08-19 Perforation 2754.00 2808.00 16
2016-08-19 Multi-Stage Fracture 2754.00 2808.00 0
2016-08-19 Perforation 2702.00 2748.00 16
2016-08-19 Multi-Stage Fracture 2702.00 2748.00 0
2016-08-19 Perforation 2645.00 2694.00 16
2016-08-19 Multi-Stage Fracture 2645.00 2694.00 0
2016-08-20 Perforation 2591.00 2638.00 16
2016-08-11 Multi-Stage Fracture 4549.00 4597.00 0
2016-08-20 Multi-Stage Fracture 2591.00 2638.00 0
2016-08-12 Perforation 4495.00 4541.00 16

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-11 2016-08-20 2,345 0 N/A
2 2016-08-11 2016-08-12 2,345 0 N/A
3 2016-08-16 2016-08-19 2,345 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water - Produced Not Available 100 91.1035 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 5.5341 N/A
Crystalline silica. quartz 14808-60-7 100 5.5341 N/A
Iron Oxide 1309-37-1 100 5.5341 N/A
Titanium Oxide 13463-67-7 100 5.5342 N/A
HCL 7.5% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 0.9546 N/A
Water 7732-18-5 100 0.9546 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0372 N/A
Water 7732-18-5 100 0.0372 N/A
CAN-2301 Breaker (Oxidizer) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.0048 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0048 N/A
CAN-1000 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Refer to MSDS 8141 100 0.0058 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.059 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0098 N/A
Potassium Chloride 7447-40-7 100 0.0098 N/A
Water 7732-18-5 100 0.0098 N/A
CAN-2403 nanoFLO Canyon Technical Services Surfactant Ethanol 64-17-5 100 0.0097 N/A
Methanol 67-56-1 100 0.0097 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0097 N/A
Water 7732-18-5 100 0.0097 N/A
2 Water - Town Not Available 100 91.0367 N/A
3 Sand (40/70) Canyon Technical Services Aluminum Oxide 1344-28-1 100 6.0704 N/A
Crystalline silica. quartz 14808-60-7 100 6.0704 N/A
Iron Oxide 1309-37-1 100 6.0704 N/A
Titanium Oxide 13463-67-7 100 6.0704 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-10 2016-08-20 Surface Water - Runoff 39843

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1973 0.0 0.0 0.0
2017 8053 0.0 0.0 0.0
2018 8243 0.0 0.0 0.0
2019 8414 0.0 0.0 0.0
2020 2150 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-16 No Incident Encountered 0.00 0.00
2016-08-11 No Incident Encountered 0.00 0.00

For data sources see[9]

References