If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404272207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.478336,"lon":-113.809236,"icon":""}]} |
Location: 00/07-22-040-27W4/0 | |
Location Alias: 00/07-22-40-27 W4M | |
Location Alias 2: 00/07-22-040-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 27 | |
Section: 22 | |
County/Municipality: Lacombe County | |
Well Name: VESTA JOFFRE 7-22-40-27 | |
Operator Name: Vesta Energy Ltd. | |
License Number: 0479840 | |
License Date: 2016-07-06 | |
License Status: Amended | |
Spud Date: 2016-07-16 | |
Final Drill Date: 2016-07-29 | |
Well Total Depth: 4787.00 m | |
Surface Hole Latitude: 52.478336 | |
Surface Hole Longitude: -113.809236 |
Date | Event |
---|---|
2016-06-18 | Conductor Casing Operation Performed |
2016-07-06 | Obtained License |
2016-07-18 | Surface Casing Operation Performed |
2016-07-20 | Direction Drilling Operation Performed - Deviate |
2016-07-23 | Direction Drilling Operation Performed - Horizontal |
2016-07-29 | Finished Drilling |
2016-07-29 | Well Log Performed |
2016-07-29 | Well Mode changed to Drilled and Cased |
2016-07-31 | Production Casing Operation Performed |
2016-07-31 | Rig Released |
2016-08-11 | Perforation Treatment Performed - Jet Perforation |
2016-08-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-12 | Perforation Treatment Performed - Jet Perforation |
2016-08-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-13 | Perforation Treatment Performed - Jet Perforation |
2016-08-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-14 | Perforation Treatment Performed - Jet Perforation |
2016-08-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-15 | Perforation Treatment Performed - Jet Perforation |
2016-08-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-16 | Perforation Treatment Performed - Jet Perforation |
2016-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-17 | Perforation Treatment Performed - Jet Perforation |
2016-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-18 | Perforation Treatment Performed - Jet Perforation |
2016-08-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-19 | Perforation Treatment Performed - Jet Perforation |
2016-08-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-08-20 | Perforation Treatment Performed - Jet Perforation |
2016-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-09-01 | Well Fluid changed to Crude Oil |
2016-09-01 | Well Mode changed to Drilling and Completing |
2016-10-01 | Well Began Production |
2016-10-01 | Well Fluid changed to Crude Oil |
2016-10-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2016-07-20 | 2038.90 | Deviate (5 - 79 degrees) |
2016-07-23 | 2538.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-08-11 | Perforation | 4712.00 | 4760.00 | 16 |
2016-08-12 | Multi-Stage Fracture | 4495.00 | 4541.00 | 0 |
2016-08-12 | Perforation | 4440.00 | 4488.00 | 16 |
2016-08-12 | Multi-Stage Fracture | 4440.00 | 4488.00 | 0 |
2016-08-12 | Perforation | 4386.00 | 4434.00 | 16 |
2016-08-12 | Multi-Stage Fracture | 4386.00 | 4434.00 | 0 |
2016-08-12 | Perforation | 4333.00 | 4379.00 | 16 |
2016-08-12 | Multi-Stage Fracture | 4333.00 | 4379.00 | 0 |
2016-08-13 | Perforation | 4277.00 | 4325.00 | 16 |
2016-08-13 | Multi-Stage Fracture | 4277.00 | 4325.00 | 0 |
2016-08-13 | Perforation | 4223.00 | 4270.00 | 16 |
2016-08-11 | Multi-Stage Fracture | 4712.00 | 4760.00 | 0 |
2016-08-13 | Multi-Stage Fracture | 4223.00 | 4270.00 | 0 |
2016-08-13 | Perforation | 4168.00 | 4216.00 | 16 |
2016-08-13 | Multi-Stage Fracture | 4168.00 | 4216.00 | 0 |
2016-08-13 | Perforation | 4114.00 | 4162.00 | 16 |
2016-08-13 | Multi-Stage Fracture | 4114.00 | 4162.00 | 0 |
2016-08-14 | Perforation | 4060.00 | 4107.00 | 16 |
2016-08-14 | Multi-Stage Fracture | 4060.00 | 4107.00 | 0 |
2016-08-14 | Perforation | 4005.00 | 4053.00 | 16 |
2016-08-14 | Multi-Stage Fracture | 4005.00 | 4053.00 | 0 |
2016-08-14 | Perforation | 3951.00 | 3997.50 | 16 |
2016-08-11 | Perforation | 4658.00 | 4706.00 | 16 |
2016-08-14 | Multi-Stage Fracture | 3951.00 | 3997.50 | 0 |
2016-08-15 | Perforation | 3896.00 | 3944.00 | 16 |
2016-08-15 | Multi-Stage Fracture | 3896.00 | 3944.00 | 0 |
2016-08-15 | Perforation | 3842.00 | 3890.00 | 16 |
2016-08-15 | Multi-Stage Fracture | 3842.00 | 3890.00 | 0 |
2016-08-15 | Perforation | 3788.00 | 3835.00 | 16 |
2016-08-15 | Multi-Stage Fracture | 3788.00 | 3835.00 | 0 |
2016-08-16 | Perforation | 3733.00 | 3781.00 | 16 |
2016-08-16 | Multi-Stage Fracture | 3733.00 | 3781.00 | 0 |
2016-08-16 | Perforation | 3679.00 | 3726.00 | 16 |
2016-08-11 | Multi-Stage Fracture | 4658.00 | 4706.00 | 0 |
2016-08-16 | Multi-Stage Fracture | 3679.00 | 3726.00 | 0 |
2016-08-16 | Perforation | 3623.00 | 3672.00 | 16 |
2016-08-16 | Multi-Stage Fracture | 3623.00 | 3672.00 | 0 |
2016-08-16 | Perforation | 3570.00 | 3617.00 | 16 |
2016-08-16 | Multi-Stage Fracture | 3570.00 | 3617.00 | 0 |
2016-08-16 | Perforation | 3516.00 | 3563.00 | 16 |
2016-08-16 | Multi-Stage Fracture | 3516.00 | 3563.00 | 0 |
2016-08-16 | Perforation | 3461.00 | 3509.00 | 16 |
2016-08-16 | Multi-Stage Fracture | 3461.00 | 3509.00 | 0 |
2016-08-16 | Perforation | 3407.00 | 3455.00 | 16 |
2016-08-11 | Perforation | 4605.00 | 4651.00 | 16 |
2016-08-16 | Multi-Stage Fracture | 3407.00 | 3455.00 | 0 |
2016-08-17 | Perforation | 3352.00 | 3400.00 | 16 |
2016-08-17 | Multi-Stage Fracture | 3352.00 | 3400.00 | 0 |
2016-08-17 | Perforation | 3298.00 | 3346.00 | 16 |
2016-08-17 | Multi-Stage Fracture | 3298.00 | 3346.00 | 0 |
2016-08-17 | Perforation | 3244.00 | 3290.00 | 16 |
2016-08-17 | Multi-Stage Fracture | 3244.00 | 3290.00 | 0 |
2016-08-17 | Perforation | 3190.00 | 3237.00 | 16 |
2016-08-17 | Multi-Stage Fracture | 3190.00 | 3237.00 | 0 |
2016-08-17 | Perforation | 3135.00 | 3182.00 | 16 |
2016-08-11 | Multi-Stage Fracture | 4605.00 | 4651.00 | 0 |
2016-08-17 | Multi-Stage Fracture | 3135.00 | 3182.00 | 0 |
2016-08-18 | Perforation | 3080.00 | 3128.00 | 16 |
2016-08-18 | Multi-Stage Fracture | 3080.00 | 3128.00 | 0 |
2016-08-18 | Perforation | 3026.00 | 3074.00 | 16 |
2016-08-18 | Multi-Stage Fracture | 3026.00 | 3074.00 | 0 |
2016-08-18 | Perforation | 2972.00 | 3019.00 | 16 |
2016-08-18 | Multi-Stage Fracture | 2972.00 | 3019.00 | 0 |
2016-08-18 | Perforation | 2917.00 | 2965.00 | 16 |
2016-08-18 | Multi-Stage Fracture | 2917.00 | 2965.00 | 0 |
2016-08-19 | Perforation | 2863.00 | 2910.00 | 16 |
2016-08-11 | Perforation | 4549.00 | 4597.00 | 16 |
2016-08-19 | Multi-Stage Fracture | 2863.00 | 2910.00 | 0 |
2016-08-19 | Perforation | 2814.00 | 2856.00 | 16 |
2016-08-19 | Multi-Stage Fracture | 2814.00 | 2856.00 | 0 |
2016-08-19 | Perforation | 2754.00 | 2808.00 | 16 |
2016-08-19 | Multi-Stage Fracture | 2754.00 | 2808.00 | 0 |
2016-08-19 | Perforation | 2702.00 | 2748.00 | 16 |
2016-08-19 | Multi-Stage Fracture | 2702.00 | 2748.00 | 0 |
2016-08-19 | Perforation | 2645.00 | 2694.00 | 16 |
2016-08-19 | Multi-Stage Fracture | 2645.00 | 2694.00 | 0 |
2016-08-20 | Perforation | 2591.00 | 2638.00 | 16 |
2016-08-11 | Multi-Stage Fracture | 4549.00 | 4597.00 | 0 |
2016-08-20 | Multi-Stage Fracture | 2591.00 | 2638.00 | 0 |
2016-08-12 | Perforation | 4495.00 | 4541.00 | 16 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-08-11 | 2016-08-20 | 2,345 | 0 | N/A |
2 | 2016-08-11 | 2016-08-12 | 2,345 | 0 | N/A |
3 | 2016-08-16 | 2016-08-19 | 2,345 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water - Produced | Not Available | 100 | 91.1035 | N/A | |||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.5341 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.5341 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.5341 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.5342 | N/A | ||||
HCL 7.5% | Canyon Technical Services | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.9546 | N/A | |
Water | 7732-18-5 | 100 | 0.9546 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0372 | N/A | |
Water | 7732-18-5 | 100 | 0.0372 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0048 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0048 | N/A | ||||
CAN-1000 Corrosion Inhibitor | Canyon Technical Services | Corrosion Inhibitor | Refer to MSDS | 8141 | 100 | 0.0058 | N/A | |
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.059 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0098 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0098 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0098 | N/A | ||||
CAN-2403 nanoFLO | Canyon Technical Services | Surfactant | Ethanol | 64-17-5 | 100 | 0.0097 | N/A | |
Methanol | 67-56-1 | 100 | 0.0097 | N/A | ||||
Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0097 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0097 | N/A | ||||
2 | Water - Town | Not Available | 100 | 91.0367 | N/A | |||
3 | Sand (40/70) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 6.0704 | N/A | |
Crystalline silica. quartz | 14808-60-7 | 100 | 6.0704 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 6.0704 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 6.0704 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-08-10 | 2016-08-20 | Surface Water - Runoff | 39843 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 1973 | 0.0 | 0.0 | 0.0 |
2017 | 8053 | 0.0 | 0.0 | 0.0 |
2018 | 8243 | 0.0 | 0.0 | 0.0 |
2019 | 8414 | 0.0 | 0.0 | 0.0 |
2020 | 2150 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-07-16 | No Incident Encountered | 0.00 | 0.00 |
2016-08-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]