X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404272007030

Well Details

Well ID: 0404272007030
Loading map...
Location: 03/07-20-040-27W4/0
Location Alias: 03/07-20-40-27 W4M
Location Alias 2: 03/07-20-040-27 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 27
Section: 20
County/Municipality: Lacombe County
Well Name: VESTA JOFFRE 7-20-40-27
Operator Name: Vesta Energy Ltd.
License Number: 0470009
License Date: 2014-09-17
License Status: Amended
Spud Date: 2015-04-09
Final Drill Date: 2015-04-25
Well Total Depth: 4850.00 m
Surface Hole Latitude: 52.456505
Surface Hole Longitude: -113.817426

For data sources see[1][2]

Well History

Date Event
2014-09-17 Obtained License
2015-04-07 Conductor Casing Operation Performed
2015-04-11 Surface Casing Operation Performed
2015-04-15 Direction Drilling Operation Performed - Deviate
2015-04-15 Well Log Performed
2015-04-17 Direction Drilling Operation Performed - Horizontal
2015-04-18 Well Log Performed
2015-04-25 Finished Drilling
2015-04-25 Well Log Performed
2015-04-25 Well Mode changed to Drilled and Cased
2015-04-28 Production Casing Operation Performed
2015-04-29 Rig Released
2015-06-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-05 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-28 Well Began Production
2015-06-28 Well Fluid changed to Crude Oil
2015-06-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-04-15 2002.30 Deviate (5 - 79 degrees)
2015-04-17 2514.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-02 Multi-Stage Fracture 4788.00 4815.00 0
2015-06-07 Multi-Stage Fracture 4194.00 4248.00 0
2015-06-07 Multi-Stage Fracture 4131.00 4185.00 0
2015-06-07 Multi-Stage Fracture 4068.00 4122.00 0
2015-06-09 Multi-Stage Fracture 4005.00 4057.00 0
2015-06-09 Multi-Stage Fracture 3942.00 3995.00 0
2015-06-09 Multi-Stage Fracture 3879.00 3933.00 0
2015-06-10 Multi-Stage Fracture 3816.00 3870.00 0
2015-06-11 Multi-Stage Fracture 3762.00 3807.00 0
2015-06-12 Multi-Stage Fracture 3690.00 3751.00 0
2015-06-12 Multi-Stage Fracture 3627.00 3681.00 0
2015-06-04 Multi-Stage Fracture 4716.00 4766.00 0
2015-06-12 Multi-Stage Fracture 3563.00 3617.00 0
2015-06-13 Multi-Stage Fracture 3500.00 3553.00 0
2015-06-13 Multi-Stage Fracture 3437.00 3490.00 0
2015-06-13 Multi-Stage Fracture 3375.00 3429.00 0
2015-06-14 Multi-Stage Fracture 3312.00 3366.00 0
2015-06-14 Multi-Stage Fracture 3248.00 3302.00 0
2015-06-14 Multi-Stage Fracture 3185.00 3239.00 0
2015-06-15 Multi-Stage Fracture 3122.00 3176.00 0
2015-06-15 Multi-Stage Fracture 3059.00 3112.00 0
2015-06-15 Multi-Stage Fracture 2996.00 3050.00 0
2015-06-05 Multi-Stage Fracture 4654.00 4707.00 0
2015-06-15 Multi-Stage Fracture 2933.00 2987.00 0
2015-06-16 Multi-Stage Fracture 2915.00 2924.00 0
2015-06-16 Multi-Stage Fracture 2807.00 2861.00 0
2015-06-16 Multi-Stage Fracture 2744.00 2798.00 0
2015-06-17 Multi-Stage Fracture 2681.00 2733.00 0
2015-06-17 Multi-Stage Fracture 2618.00 2670.00 0
2015-06-17 Multi-Stage Fracture 2561.00 2607.00 0
2015-06-17 Multi-Stage Fracture 2505.00 2551.00 0
2015-06-05 Multi-Stage Fracture 4592.00 4643.00 0
2015-06-05 Multi-Stage Fracture 4507.00 4581.00 0
2015-06-06 Multi-Stage Fracture 4449.00 4500.00 0
2015-06-06 Multi-Stage Fracture 4382.00 4437.00 0
2015-06-06 Multi-Stage Fracture 4320.00 4372.00 0
2015-06-06 Multi-Stage Fracture 4256.00 4311.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-02 2015-06-05 2,360 0 N/A
2 2015-06-02 2015-06-17 2,360 46,394 N/A
3 2015-06-07 2015-06-13 2,360 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.4812 N/A
AI-7NR Trican Corrosion Inhibitor modified propargyl alcohol Trade Secret 100 0.0009 N/A
propargyl alcohol 107-19-7 100 0.0009 N/A
ASA-60W Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0042 N/A
dipropylene glycol 25265-71-8 100 0.0042 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0042 N/A
2 water Not Available 100 80.8034 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 12.5387 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
polyethylene glycol 25322-68-3 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0094 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0437 N/A
propylene glycol 57-55-6 100 0.0437 N/A
GFR-3D Trican Friction Reducer non-hazardous ingredients Not Available 100 0.012 N/A
sodium chloride 7647-14-5 100 0.012 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0464 N/A
3 Sand 40/70 Trican silica crystalline 14808-60-7 100 4.3641 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-06-03 2015-06-18 Surface Water - Runoff 48096

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4234 0.0 0.0 0.0
2016 8119 0.0 0.0 0.0
2017 8413 0.0 0.0 0.0
2018 8276 0.0 0.0 0.0
2019 8330 0.0 0.0 0.0
2020 2152 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-04-25 No Incident Encountered 0.00 0.00
2015-05-31 No Incident Encountered 0.00 0.00

For data sources see[9]

References