X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404271606002

Well Details

Well ID: 0404271606002
Loading map...
Location: 00/06-16-040-27W4/2
Location Alias: 00/06-16-40-27 W4M
Location Alias 2: 00/06-16-040-27 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 27
Section: 16
County/Municipality: Lacombe County
Well Name: VESTA JOFFRE 6-16-40-27
Operator Name: Vesta Energy Ltd.
License Number: 0478619
License Date: 2015-12-22
License Status: Amended
Spud Date: 2016-01-03
Final Drill Date: 2016-01-24
Well Total Depth: 4657.00 m
Surface Hole Latitude: 52.439309
Surface Hole Longitude: -113.865342

For data sources see[1][2]

Well History

Date Event
2015-12-22 Obtained License
2015-12-29 Conductor Casing Operation Performed
2016-01-05 Surface Casing Operation Performed
2016-01-06 Direction Drilling Operation Performed - Deviate
2016-01-13 Direction Drilling Operation Performed - Horizontal
2016-01-24 Finished Drilling
2016-01-24 Well Log Performed
2016-01-24 Well Mode changed to Drilled and Cased
2016-01-26 Production Casing Operation Performed
2016-01-26 Rig Released
2016-06-17 Perforation Treatment Performed - Jet Perforation
2016-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-18 Perforation Treatment Performed - Jet Perforation
2016-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-19 Perforation Treatment Performed - Jet Perforation
2016-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-20 Perforation Treatment Performed - Jet Perforation
2016-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-21 Perforation Treatment Performed - Jet Perforation
2016-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-22 Perforation Treatment Performed - Jet Perforation
2016-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-23 Perforation Treatment Performed - Jet Perforation
2016-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-24 Perforation Treatment Performed - Jet Perforation
2016-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-25 Perforation Treatment Performed - Jet Perforation
2016-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-26 Perforation Treatment Performed - Jet Perforation
2016-06-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-27 Perforation Treatment Performed - Jet Perforation
2016-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-14 Well Fluid changed to Crude Oil
2016-07-14 Well Mode changed to Drilling and Completing
2016-09-01 Well Began Production
2016-09-01 Well Fluid changed to Crude Oil
2016-09-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-01-06 1185.34 Deviate (5 - 79 degrees)
2016-01-13 2116.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-06-17 Perforation 4389.00 4438.00 16
2016-06-18 Multi-Stage Fracture 4172.00 4219.00 0
2016-06-18 Perforation 4117.00 4165.00 16
2016-06-18 Multi-Stage Fracture 4117.00 4165.00 0
2016-06-19 Perforation 4063.00 4110.00 16
2016-06-19 Multi-Stage Fracture 4063.00 4110.00 0
2016-06-19 Perforation 4008.00 4056.00 16
2016-06-19 Multi-Stage Fracture 4008.00 4056.00 0
2016-06-19 Perforation 3960.00 4001.00 16
2016-06-19 Multi-Stage Fracture 3960.00 4001.00 0
2016-06-20 Perforation 3900.00 3953.00 16
2016-06-17 Multi-Stage Fracture 4389.00 4438.00 0
2016-06-20 Multi-Stage Fracture 3900.00 3953.00 0
2016-06-20 Perforation 3845.00 3893.00 16
2016-06-20 Multi-Stage Fracture 3845.00 3893.00 0
2016-06-20 Perforation 3791.00 3838.00 16
2016-06-20 Multi-Stage Fracture 3791.00 3838.00 0
2016-06-21 Perforation 3738.00 3784.00 16
2016-06-21 Multi-Stage Fracture 3738.00 3784.00 0
2016-06-21 Perforation 3682.00 3730.00 16
2016-06-21 Multi-Stage Fracture 3682.00 3730.00 0
2016-06-22 Perforation 3628.00 3675.00 16
2016-06-17 Perforation 4335.00 4382.00 16
2016-06-22 Multi-Stage Fracture 3628.00 3675.00 0
2016-06-22 Perforation 3573.00 3621.00 16
2016-06-22 Multi-Stage Fracture 3573.00 3621.00 0
2016-06-23 Perforation 3519.00 3566.00 16
2016-06-23 Multi-Stage Fracture 3519.00 3566.00 0
2016-06-23 Perforation 3464.00 3511.00 16
2016-06-23 Multi-Stage Fracture 3464.00 3511.00 0
2016-06-23 Perforation 3412.00 3458.00 16
2016-06-23 Multi-Stage Fracture 3412.00 3458.00 0
2016-06-24 Perforation 3356.00 3403.00 16
2016-06-17 Multi-Stage Fracture 4335.00 4382.00 0
2016-06-24 Multi-Stage Fracture 3356.00 3403.00 0
2016-06-24 Perforation 3301.00 3349.00 16
2016-06-24 Multi-Stage Fracture 3301.00 3349.00 0
2016-06-24 Perforation 3247.00 3294.00 16
2016-06-24 Multi-Stage Fracture 3247.00 3294.00 0
2016-06-25 Perforation 3199.00 3240.00 16
2016-06-25 Multi-Stage Fracture 3199.00 3240.00 0
2016-06-25 Perforation 3139.00 3193.00 16
2016-06-25 Multi-Stage Fracture 3139.00 3193.00 0
2016-06-25 Perforation 3084.00 3131.00 16
2016-06-18 Perforation 4280.00 4328.00 16
2016-06-25 Multi-Stage Fracture 3084.00 3131.00 0
2016-06-26 Perforation 3029.00 3077.00 16
2016-06-26 Multi-Stage Fracture 3029.00 3077.00 0
2016-06-26 Perforation 2975.00 3023.00 16
2016-06-26 Multi-Stage Fracture 2975.00 3023.00 0
2016-06-26 Perforation 2921.00 2968.00 16
2016-06-26 Multi-Stage Fracture 2921.00 2968.00 0
2016-06-26 Perforation 2866.00 2915.00 16
2016-06-26 Multi-Stage Fracture 2866.00 2915.00 0
2016-06-26 Perforation 2812.00 2859.00 16
2016-06-18 Multi-Stage Fracture 4280.00 4328.00 0
2016-06-26 Multi-Stage Fracture 2812.00 2859.00 0
2016-06-27 Perforation 2757.00 2805.00 16
2016-06-27 Multi-Stage Fracture 2757.00 2805.00 0
2016-06-27 Perforation 2703.00 2751.00 16
2016-06-27 Multi-Stage Fracture 2703.00 2751.00 0
2016-06-27 Perforation 2649.00 2696.00 16
2016-06-27 Multi-Stage Fracture 2649.00 2696.00 0
2016-06-27 Perforation 2594.00 2642.00 16
2016-06-27 Multi-Stage Fracture 2594.00 2642.00 0
2016-06-18 Perforation 4226.00 4273.00 16
2016-06-18 Multi-Stage Fracture 4226.00 4273.00 0
2016-06-18 Perforation 4172.00 4219.00 16

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-06-17 2016-06-27 2,416 0 N/A
2 2016-06-18 2016-06-27 2,416 0 N/A
3 2016-06-17 2016-06-17 2,416 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water - Produced Not Available 100 90.7502 N/A
Rapid-Stim Acid 7.5% Canyon Technical Services Acid No specific ingredients Not Available 100 0.8997 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0125 N/A
Water 7732-18-5 100 0.0125 N/A
CAN-2301 Breaker (Oxidizer) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.034 N/A
Non-hazardous base ingredient(s) Not Available 100 0.034 N/A
CAN-1000 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Refer to MSDS 8141 100 0.0059 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Boric Acid 10043-35-3 100 0.0342 N/A
Monoethanolamine 141-43-5 100 0.0342 N/A
Water 7732-18-5 100 0.0342 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.2524 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0127 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0217 N/A
Potassium Chloride 7447-40-7 100 0.0218 N/A
Water 7732-18-5 100 0.0217 N/A
CAN-2403 nanoFLO Canyon Technical Services Surfactant Ethanol 64-17-5 100 0.0217 N/A
Methanol 67-56-1 100 0.0217 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0217 N/A
Water 7732-18-5 100 0.0217 N/A
2 Sand (40/70) Canyon Technical Services Aluminum Oxide 1344-28-1 100 7.9551 N/A
Crystalline silica. quartz 14808-60-7 100 7.9551 N/A
Iron Oxide 1309-37-1 100 7.9551 N/A
Titanium Oxide 13463-67-7 100 7.9551 N/A
3 Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 7.9434 N/A
Crystalline silica. quartz 14808-60-7 100 7.9434 N/A
Iron Oxide 1309-37-1 100 7.9434 N/A
Titanium Oxide 13463-67-7 100 7.9433 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-06-15 2016-06-21 Surface Water - Runoff 26779
2016-06-21 2016-06-27 Surface Water - Runoff 8356

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2163 0.0 0.0 0.0
2017 7473 0.0 0.0 0.0
2018 7522 0.0 0.0 0.0
2019 7939 0.0 0.0 0.0
2020 2004 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-03 No Incident Encountered 0.00 0.00
2016-06-17 No Incident Encountered 0.00 0.00

For data sources see[9]

References