X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404262706000

Well Details

Well ID: 0404262706000
Loading map...
Location: 00/06-27-040-26W4/0
Location Alias: 00/06-27-40-26 W4M
Location Alias 2: 00/06-27-040-26 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 26
Section: 27
County/Municipality: Lacombe County
Well Name: ADDISON LACOMBE 6-27-40-26
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0065626
License Date: 1977-09-09
License Status: Re-Entered
Spud Date: 1977-09-20
Final Drill Date: 1977-10-04
Well Total Depth: 1732.20 m
Surface Hole Latitude: 52.467016
Surface Hole Longitude: -113.668889

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-09 Obtained License
1977-09-27 Drill Stem Test Performed
1977-10-02 Drill Stem Test Performed
1977-10-04 Finished Drilling
1977-10-04 Well Mode changed to Drilled and Cased
1977-10-05 Production Casing Operation Performed
1977-11-07 Perforation Treatment Performed - Jet Perforation
1977-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-10 Perforation Treatment Performed - Jet Perforation
1977-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-14 Perforation Treatment Performed - Jet Perforation
1978-12-23 Well Began Production
1978-12-23 Well Fluid changed to Gas
1978-12-23 Well Mode changed to Flowing
1987-04-30 Well Fluid changed to Gas
1987-04-30 Well Mode changed to Suspended
1993-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-26 Plug Back Performed
1993-09-27 Well Abandoned
1993-09-27 Well Fluid changed to Gas
1993-09-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-07 Perforation 1705.70 1708.70 7
1977-11-09 Acid Treatment 1705.70 1708.70 0
1977-11-10 Perforation 1685.80 1687.70 10
1977-11-13 Packing Device Capped w/Cement 1681.00 1681.00 0
1977-11-14 Perforation 1505.40 1506.60 10
1993-09-26 Packing Device Capped w/Cement 1487.00 1495.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 181 0.0 0.0 0.0
1979 5913 0.0 0.0 0.0
1980 5223 0.0 0.0 0.0
1981 4846 0.0 0.0 0.0
1982 4824 0.0 0.0 0.0
1983 4786 0.0 0.0 0.0
1984 5048 0.0 0.0 0.0
1985 3684 0.0 0.0 0.0
1986 3219 0.0 0.0 0.0
1987 1509 0.0 0.0 0.0

For data sources see[5]

References