X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404251412002

Well Details

Well ID: 0404251412002
Loading map...
Location: 00/12-14-040-25W4/2
Location Alias: 00/12-14-40-25 W4M
Location Alias 2: 00/12-14-040-25 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 25
Section: 14
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 12-14-40-25
Operator Name: Ember Resources Inc.
License Number: 0326876
License Date: 2005-02-23
License Status: Issued
Spud Date: 2005-05-26
Final Drill Date: 2005-05-27
Well Total Depth: 915.00 m
Surface Hole Latitude: 52.441773
Surface Hole Longitude: -113.503273

For data sources see[1][2]

Well History

Date Event
2005-02-23 Obtained License
2005-05-26 Surface Casing Operation Performed
2005-05-27 Finished Drilling
2005-05-27 Production Casing Operation Performed
2005-05-27 Well Log Performed
2005-05-27 Well Mode changed to Drilled and Cased
2005-05-28 Rig Released
2005-06-12 Perforation Treatment Performed - Jet Perforation
2005-06-21 Perforation Treatment Performed - Fractured
2005-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-23 Perforation Treatment Performed - Jet Perforation
2005-06-23 Plug Back Performed
2005-06-25 Perforation Treatment Performed - Fractured
2005-08-01 Well Began Production
2005-08-01 Well Fluid changed to Gas
2005-08-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-12 Perforation 660.00 664.00 17
2005-06-23 Perforation 537.50 537.80 14
2005-06-23 Perforation 509.00 509.50 14
2005-06-23 Perforation 491.00 491.30 14
2005-06-23 Perforation 448.00 448.30 14
2005-06-23 Perforation 443.80 444.00 14
2005-06-23 Perforation 436.30 436.60 14
2005-06-23 Perforation 347.60 347.90 14
2005-06-23 Perforation 346.00 346.50 14
2005-06-25 Fracture 579.80 580.00 0
2005-06-25 Fracture 570.30 570.50 0
2005-06-21 Fracture 660.00 664.00 0
2005-06-25 Fracture 571.50 572.00 0
2005-06-25 Fracture 560.00 560.50 0
2005-06-25 Fracture 551.30 551.80 0
2005-06-25 Fracture 544.30 544.80 0
2005-06-25 Fracture 537.50 537.80 0
2005-06-25 Fracture 509.00 509.50 0
2005-06-25 Fracture 491.00 491.30 0
2005-06-25 Fracture 448.00 448.30 0
2005-06-25 Fracture 443.80 444.00 0
2005-06-25 Fracture 436.30 436.60 0
2005-06-23 Packing Device Capped w/Cement 648.00 656.00 0
2005-06-25 Fracture 347.60 347.90 0
2005-06-25 Fracture 346.00 346.50 0
2005-06-23 Perforation 579.80 580.00 14
2005-06-23 Perforation 570.30 570.50 14
2005-06-23 Perforation 571.50 572.00 14
2005-06-23 Perforation 560.00 560.50 14
2005-06-23 Perforation 551.30 551.80 14
2005-06-23 Perforation 544.30 544.80 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3168 0.0 0.0 0.0
2006 8544 0.0 0.0 0.0
2007 7959 0.0 0.0 0.0
2008 8257 0.0 0.0 0.0
2009 8389 0.0 0.0 0.0
2010 8343 0.0 0.0 0.0
2011 8261 0.0 0.0 0.0
2012 7952 0.0 0.0 0.0
2013 8705 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8744 0.0 0.0 0.0
2017 8234 0.0 0.0 0.0
2018 8716 0.0 0.0 0.0
2019 8184 0.0 0.0 0.0
2020 2103 0.0 0.0 0.0

For data sources see[5]

References