X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404243401000

Well Details

Well ID: 0404243401000
Loading map...
Location: 00/01-34-040-24W4/0
Location Alias: 00/01-34-40-24 W4M
Location Alias 2: 00/01-34-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 34
County/Municipality: Lacombe County
Well Name: ACL ET AL CLIVE 1-34-40-24
Operator Name: Paramount Resources Ltd.
License Number: 0090707
License Date: 1981-06-12
License Status: Re-Entered
Spud Date: 1981-06-13
Final Drill Date: 1981-06-27
Well Total Depth: 1890.00 m
Surface Hole Latitude: 52.480955
Surface Hole Longitude: -113.368656

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-12 Obtained License
1981-06-13 Lost Circulation Occurred
1981-06-18 Drill Stem Test Performed
1981-06-21 Drill Stem Test Performed
1981-06-27 Finished Drilling
1981-06-28 Drill Stem Test Performed
1981-06-29 Drill Stem Test Performed
1981-06-30 Production Casing Operation Performed
1981-06-30 Well Mode changed to Drilled and Cased
1997-07-20 Perforation Treatment Performed - Jet Perforation
1997-07-22 Perforation Treatment Performed - Jet Perforation
1997-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-26 Perforation Treatment Performed - Jet Perforation
1997-07-26 Plug Back Performed
1997-08-06 Perforation Treatment Performed - Fractured
1999-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-15 Plug Back Performed
1999-10-16 Well Log Performed
2000-01-20 Well Abandoned
2000-01-20 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-20 Perforation 1557.00 1558.00 20
1997-07-22 Perforation 1549.00 1550.00 23
1997-07-26 Packing Device Capped w/Cement 1539.00 1547.00 0
1997-07-26 Perforation 1352.50 1354.00 20
1997-07-26 Perforation 1350.50 1351.50 20
1997-08-06 Fracture 1350.50 1354.00 0
1999-10-15 Packing Device Capped w/Cement 1337.00 1345.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-06-13 Lost Circulation 18.00 185.00

For data sources see[5]

References