X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404243304002

Well Details

Well ID: 0404243304002
Loading map...
Location: 00/04-33-040-24W4/2
Location Alias: 00/04-33-40-24 W4M
Location Alias 2: 00/04-33-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 33
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 4-33-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0034160
License Date: 1968-05-24
License Status: Suspension
Spud Date: 1968-05-29
Final Drill Date: 1968-06-07
Well Total Depth: 1886.70 m
Surface Hole Latitude: 52.479591
Surface Hole Longitude: -113.409166

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-05-24 Obtained License
1968-06-07 Finished Drilling
1968-06-07 Well Mode changed to Drilled and Cased
1968-06-08 Drill Stem Test Performed
1968-06-09 Production Casing Operation Performed
1968-06-24 Perforation Treatment Performed - Acid Wash - No Pressure
1968-06-24 Perforation Treatment Performed - Jet Perforation
1992-03-24 Perforation Treatment Performed - Cement Squeeze
1992-03-25 Perforation Treatment Performed - Jet Perforation
1992-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-25 Well Log Performed
1993-03-26 Perforation Treatment Performed - Cement Squeeze
1993-03-27 Perforation Treatment Performed - Jet Perforation
1995-01-02 Well Log Performed
1995-12-29 Well Log Performed
1995-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-31 Perforation Treatment Performed - Cement Squeeze
1996-01-03 Perforation Treatment Performed - Jet Perforation
1997-08-08 Well Log Performed
1997-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-09 Perforation Treatment Performed - Jet Perforation
1997-08-09 Plug Back Performed
1997-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-14 Well Began Production
1997-10-14 Well Fluid changed to Crude Oil
1997-10-14 Well Mode changed to Pumping
2007-11-26 Well Log Performed
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-06-24 Perforation 1866.60 1866.90 13
1996-01-03 Perforation 1855.50 1857.50 17
1997-08-09 Packing Device Capped w/Cement 1844.00 1852.00 0
1997-08-09 Perforation 1824.50 1829.40 13
1997-08-11 Acid Treatment 1824.50 1829.40 0
1968-06-24 Acid Wash 1866.60 1866.90 0
1992-03-24 Cement Squeeze 1866.60 1866.90 0
1992-03-25 Perforation 1864.10 1865.10 18
1992-03-27 Acid Treatment 1864.10 1865.10 0
1993-03-26 Cement Squeeze 1864.10 1865.10 0
1993-03-27 Perforation 1861.00 1862.00 17
1995-12-31 Acid Treatment 1861.00 1862.00 0
1995-12-31 Cement Squeeze 1861.00 1862.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1816 0.0 0.0 0.0
1998 8593 0.0 0.0 0.0
1999 8019 0.0 0.0 0.0
2000 8773 0.0 0.0 0.0
2001 8281 0.0 0.0 0.0
2002 5567 0.0 0.0 0.0

For data sources see[5]

References