X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404243006004

Well Details

Well ID: 0404243006004
Loading map...
Location: 00/06-30-040-24W4/4
Location Alias: 00/06-30-40-24 W4M
Location Alias 2: 00/06-30-040-24 W4/04
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 30
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 6-30-40-24
Operator Name: Ember Resources Inc.
License Number: 0048177
License Date: 1973-11-30
License Status: Abandoned
Spud Date: 2003-01-30
Final Drill Date: 2003-02-04
Well Total Depth: 1645.90 m
Surface Hole Latitude: 52.467399
Surface Hole Longitude: -113.451413

For data sources see[1][2]

Well History

Date Event
1973-11-30 Obtained License
2003-02-04 Finished Drilling
2003-02-04 Well Mode changed to Drilled and Cased
2003-02-05 Perforation Treatment Performed - Cement Squeeze
2003-02-05 Perforation Treatment Performed - Jet Perforation
2003-02-05 Plug Back Performed
2003-02-12 Perforation Treatment Performed - Jet Perforation
2003-02-17 Perforation Treatment Performed - Fractured
2003-02-19 Rig Released
2003-04-24 Well Began Production
2003-04-24 Well Fluid changed to Gas
2003-04-24 Well Mode changed to Flowing
2008-11-01 Well Fluid changed to Gas
2008-11-01 Well Mode changed to Suspended
2017-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-13 Plug Back Performed
2017-08-13 Well Fluid changed to Gas
2017-08-13 Well Mode changed to Abandoned Zone
2018-01-25 Well Abandoned
2018-01-25 Well Fluid changed to Gas
2018-01-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-05 Perforation 801.30 802.50 13
2003-02-05 Cement Squeeze 801.30 802.50 0
2003-02-12 Perforation 1411.20 1414.80 13
2003-02-17 Fracture 1411.20 1414.80 0
2017-08-13 Packing Device Capped w/Cement 1393.80 1401.80 0
2017-08-13 Packing Device Capped w/Cement 782.80 790.80 0
2017-08-13 Packing Device Capped w/Cement 228.80 236.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5024 0.0 0.0 0.0
2004 8621 0.0 0.0 0.0
2005 3466 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References