X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242916033

Well Details

Well ID: 0404242916033
Loading map...
Location: 03/16-29-040-24W4/3
Location Alias: 03/16-29-40-24 W4M
Location Alias 2: 03/16-29-040-24 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 29
County/Municipality: Lacombe County
Well Name: EMBER 103 CLIVE 16-29-40-24
Operator Name: Ember Resources Inc.
License Number: 0217581
License Date: 1998-09-16
License Status: Suspension
Spud Date: 1998-10-01
Final Drill Date: 1998-10-14
Well Total Depth: 1646.00 m
Surface Hole Latitude: 52.476758
Surface Hole Longitude: -113.414949

For data sources see[1][2]

Well History

Date Event
1998-09-16 Obtained License
1998-10-03 Surface Casing Operation Performed
1998-10-05 Direction Drilling Operation Performed - Deviate
1998-10-13 Well Log Performed
1998-10-14 Finished Drilling
1998-10-14 Well Log Performed
1998-10-14 Well Mode changed to Drilled and Cased
1998-10-15 Production Casing Operation Performed
1998-10-16 Rig Released
1998-10-21 Perforation Treatment Performed - Jet Perforation
1998-10-21 Well Log Performed
1998-10-24 Perforation Treatment Performed - Jet Perforation
1998-10-24 Well Log Performed
1998-10-27 Perforation Treatment Performed - Jet Perforation
1998-10-27 Well Log Performed
1998-11-20 Well Began Production
1998-11-20 Well Fluid changed to Gas
1998-11-20 Well Mode changed to Flowing
2004-03-08 Well Log Performed
2004-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-09 Perforation Treatment Performed - Cement Squeeze
2004-03-09 Plug Back Performed
2004-03-14 Perforation Treatment Performed - Jet Perforation
2004-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-01-01 Well Fluid changed to Gas
2009-01-01 Well Mode changed to Suspended
2019-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-07 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-10-05 360.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-21 Perforation 1626.70 1628.70 17
1998-10-24 Perforation 1573.00 1576.00 17
1998-10-27 Perforation 1367.50 1372.00 17
2004-03-09 Packing Device Capped w/Cement 1612.00 1620.00 0
2004-03-09 Cement Squeeze 1367.50 1372.00 0
2004-03-14 Perforation 1569.00 1572.50 17
2004-03-14 Perforation 1572.50 1576.00 17
2004-03-15 Acid Treatment 1569.00 1576.00 0
2019-02-07 Packing Device Capped w/Cement 1550.30 1558.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 951 0.0 0.0 0.0
1999 6403 0.0 0.0 0.0
2000 8413 0.0 0.0 0.0
2001 1902 0.0 0.0 0.0
2002 1935 0.0 0.0 0.0
2003 3398 0.0 0.0 0.0
2004 2222 0.0 0.0 0.0
2005 329 0.0 0.0 0.0
2007 4108 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References