X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242812002

Well Details

Well ID: 0404242812002
Loading map...
Location: 00/12-28-040-24W4/2
Location Alias: 00/12-28-40-24 W4M
Location Alias 2: 00/12-28-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 28
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-28-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0025288
License Date: 1963-12-09
License Status: Suspension
Spud Date: 1963-12-22
Final Drill Date: 1964-01-06
Well Total Depth: 1894.30 m
Surface Hole Latitude: 52.472354
Surface Hole Longitude: -113.408224

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-12-09 Obtained License
1964-01-06 Finished Drilling
1964-01-06 Well Mode changed to Drilled and Cased
1964-01-07 Drill Stem Test Performed
1964-01-08 Production Casing Operation Performed
1964-01-15 Perforation Treatment Performed - Jet Perforation
1964-01-16 Perforation Treatment Performed - Acid Wash - No Pressure
1993-06-24 Well Log Performed
1993-06-26 Perforation Treatment Performed - Jet Perforation
1993-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-29 Well Log Performed
1993-06-30 Perforation Treatment Performed - Cement Squeeze
1993-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-01 Perforation Treatment Performed - Jet Perforation
1996-07-17 Well Log Performed
1996-07-19 Well Log Performed
1996-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-20 Perforation Treatment Performed - Jet Perforation
1996-07-20 Plug Back Performed
1996-07-22 Well Began Production
1996-07-22 Well Fluid changed to Crude Oil
1996-07-22 Well Mode changed to Pumping
2005-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-13 Plug Back Performed
2005-10-13 Well Fluid changed to Crude Oil
2005-10-13 Well Log Performed
2005-10-13 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-01-15 Perforation 1874.80 1875.40 7
1996-07-20 Acid Treatment 1834.00 1836.50 0
2005-10-13 Packing Device Capped w/Cement 1819.90 1827.90 0
1964-01-16 Acid Wash 1874.80 1875.40 0
1993-06-26 Perforation 1869.50 1870.50 20
1993-06-29 Acid Treatment 1869.50 1870.50 0
1993-06-30 Cement Squeeze 1869.50 1870.50 0
1993-07-01 Perforation 1868.00 1868.80 20
1993-07-01 Acid Treatment 1868.00 1868.80 0
1996-07-20 Packing Device Capped w/Cement 1857.00 1865.00 0
1996-07-20 Perforation 1834.00 1836.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1484 0.0 0.0 0.0
1997 5256 0.0 0.0 0.0
1998 8659 0.0 0.0 0.0
1999 8470 0.0 0.0 0.0
2000 8735 0.0 0.0 0.0
2001 8533 0.0 0.0 0.0
2002 8359 0.0 0.0 0.0
2003 2431 0.0 0.0 0.0

For data sources see[5]

References