X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242112002

Well Details

Well ID: 0404242112002
Loading map...
Location: 00/12-21-040-24W4/2
Location Alias: 00/12-21-40-24 W4M
Location Alias 2: 00/12-21-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-21-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0024991
License Date: 1963-10-21
License Status: Suspension
Spud Date: 1963-10-22
Final Drill Date: 1963-11-07
Well Total Depth: 1938.50 m
Surface Hole Latitude: 52.457739
Surface Hole Longitude: -113.408238

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-21 Obtained License
1963-11-07 Finished Drilling
1963-11-07 Well Mode changed to Drilled and Cased
1963-11-09 Drill Stem Test Performed
1963-11-11 Production Casing Operation Performed
1963-11-13 Perforation Treatment Performed - Bullet Perforation
1963-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-22 Perforation Treatment Performed - Bullet Perforation
1963-11-22 Well Began Production
1963-11-22 Well Fluid changed to Crude Oil
1963-11-22 Well Mode changed to Flowing
1963-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-25 Perforation Treatment Performed - Acid Wash - No Pressure
1965-03-09 Well Fluid changed to Crude Oil
1965-03-09 Well Mode changed to Suspended
1972-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-11 Perforation Treatment Performed - Cement Squeeze
1972-05-11 Well Fluid changed to Crude Oil
1972-05-11 Well Mode changed to Abandoned Zone
1985-04-27 Perforation Treatment Performed - Cement Squeeze
1985-04-30 Well Log Performed
1985-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-01 Perforation Treatment Performed - Jet Perforation
1997-03-26 Well Log Performed
1997-03-27 Well Log Performed
1997-04-01 Perforation Treatment Performed - Jet Perforation
1997-04-01 Well Log Performed
1997-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-10 Perforation Treatment Performed - Jet Perforation
1999-09-10 Plug Back Performed
1999-09-10 Well Log Performed
1999-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-21 Well Fluid changed to Crude Oil
1999-09-21 Well Mode changed to Pumping
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-11-13 Bullet Perforation 1917.20 1918.10 7
1985-05-01 Acid Treatment 1914.80 1915.30 0
1997-04-01 Perforation 1907.50 1910.50 16
1997-04-07 Acid Treatment 1907.50 1910.50 0
1999-09-10 Packing Device Capped w/Cement 1894.00 1902.00 0
1999-09-10 Perforation 1877.50 1881.00 14
1999-09-12 Acid Treatment 1877.50 1881.00 0
1963-11-14 Acid Treatment 1917.20 1918.10 0
1963-11-22 Bullet Perforation 1881.50 1882.40 7
1963-11-25 Acid Wash 1881.50 1882.40 0
1963-11-25 Acid Treatment 1881.50 1882.40 0
1972-05-11 Acid Treatment 1881.50 1882.40 0
1972-05-11 Cement Squeeze 1881.50 1882.40 0
1985-04-27 Cement Squeeze 1917.20 1918.10 0
1985-05-01 Perforation 1914.80 1915.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1999 2031 0.0 0.0 0.0
2000 48 0.0 0.0 0.0

For data sources see[5]

References