If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404242112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.457739,"lon":-113.408238,"icon":""}]} |
Location: 00/12-21-040-24W4/0 | |
Location Alias: 00/12-21-40-24 W4M | |
Location Alias 2: 00/12-21-040-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 21 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 12-21-40-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0024991 | |
License Date: 1963-10-21 | |
License Status: Suspension | |
Spud Date: 1963-10-22 | |
Final Drill Date: 1963-11-07 | |
Well Total Depth: 1938.50 m | |
Surface Hole Latitude: 52.457739 | |
Surface Hole Longitude: -113.408238 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-10-21 | Obtained License |
1963-11-07 | Finished Drilling |
1963-11-07 | Well Mode changed to Drilled and Cased |
1963-11-09 | Drill Stem Test Performed |
1963-11-11 | Production Casing Operation Performed |
1963-11-13 | Perforation Treatment Performed - Bullet Perforation |
1963-11-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-11-14 | Well Began Production |
1963-11-14 | Well Fluid changed to Crude Oil |
1963-11-14 | Well Mode changed to Flowing |
1963-11-22 | Perforation Treatment Performed - Bullet Perforation |
1963-11-22 | Well Fluid changed to Crude Oil |
1963-11-22 | Well Mode changed to Flowing |
1963-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-11-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1972-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-05-11 | Perforation Treatment Performed - Cement Squeeze |
1972-05-11 | Well Fluid changed to Crude Oil |
1972-05-11 | Well Mode changed to Flowing |
1976-01-12 | Well Fluid changed to Crude Oil |
1976-01-12 | Well Mode changed to Pumping |
1985-04-27 | Perforation Treatment Performed - Cement Squeeze |
1985-04-30 | Well Log Performed |
1985-05-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-05-01 | Perforation Treatment Performed - Jet Perforation |
1996-04-30 | Well Fluid changed to Crude Oil |
1996-04-30 | Well Mode changed to Suspended |
1997-03-26 | Well Log Performed |
1997-03-27 | Well Log Performed |
1997-04-01 | Perforation Treatment Performed - Jet Perforation |
1997-04-01 | Well Log Performed |
1997-04-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-04-23 | Well Fluid changed to Crude Oil |
1997-04-23 | Well Mode changed to Pumping |
1999-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-10 | Perforation Treatment Performed - Jet Perforation |
1999-09-10 | Plug Back Performed |
1999-09-10 | Well Log Performed |
1999-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-10-01 | Well Fluid changed to Crude Oil |
1999-10-01 | Well Mode changed to Suspended |
1999-10-02 | Well Fluid changed to Crude Oil |
1999-10-02 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-11-13 | Bullet Perforation | 1917.20 | 1918.10 | 7 |
1985-05-01 | Acid Treatment | 1914.80 | 1915.30 | 0 |
1997-04-01 | Perforation | 1907.50 | 1910.50 | 16 |
1997-04-07 | Acid Treatment | 1907.50 | 1910.50 | 0 |
1999-09-10 | Packing Device Capped w/Cement | 1894.00 | 1902.00 | 0 |
1999-09-10 | Perforation | 1877.50 | 1881.00 | 14 |
1999-09-12 | Acid Treatment | 1877.50 | 1881.00 | 0 |
1963-11-14 | Acid Treatment | 1917.20 | 1918.10 | 0 |
1963-11-22 | Bullet Perforation | 1881.50 | 1882.40 | 7 |
1963-11-25 | Acid Wash | 1881.50 | 1882.40 | 0 |
1963-11-25 | Acid Treatment | 1881.50 | 1882.40 | 0 |
1972-05-11 | Acid Treatment | 1881.50 | 1882.40 | 0 |
1972-05-11 | Cement Squeeze | 1881.50 | 1882.40 | 0 |
1985-04-27 | Cement Squeeze | 1917.20 | 1918.10 | 0 |
1985-05-01 | Perforation | 1914.80 | 1915.30 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 3711 | 0.0 | 0.0 | 0.0 |
1968 | 4755 | 0.0 | 0.0 | 0.0 |
1969 | 3563 | 0.0 | 0.0 | 0.0 |
1970 | 2177 | 0.0 | 0.0 | 0.0 |
1971 | 24 | 0.0 | 0.0 | 0.0 |
1976 | 7778 | 0.0 | 0.0 | 0.0 |
1977 | 7899 | 0.0 | 0.0 | 0.0 |
1978 | 8337 | 0.0 | 0.0 | 0.0 |
1979 | 8607 | 0.0 | 0.0 | 0.0 |
1980 | 7879 | 0.0 | 0.0 | 0.0 |
1981 | 8659 | 0.0 | 0.0 | 0.0 |
1982 | 7134 | 0.0 | 0.0 | 0.0 |
1983 | 8627 | 0.0 | 0.0 | 0.0 |
1984 | 7975 | 0.0 | 0.0 | 0.0 |
1985 | 4938 | 0.0 | 0.0 | 0.0 |
1986 | 1560 | 0.0 | 0.0 | 0.0 |
1997 | 5314 | 0.0 | 0.0 | 0.0 |
1998 | 7997 | 0.0 | 0.0 | 0.0 |
1999 | 1560 | 0.0 | 0.0 | 0.0 |
For data sources see[5]