X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242110002

Well Details

Well ID: 0404242110002
Loading map...
Location: 00/10-21-040-24W4/2
Location Alias: 00/10-21-40-24 W4M
Location Alias 2: 00/10-21-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 10-21-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0028357
License Date: 1965-06-09
License Status: RecCertified
Spud Date: 1965-06-12
Final Drill Date: 1965-06-24
Well Total Depth: 1924.80 m
Surface Hole Latitude: 52.457551
Surface Hole Longitude: -113.396923

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-06-09 Obtained License
1965-06-24 Finished Drilling
1965-06-24 Well Mode changed to Drilled and Cased
1965-06-25 Drill Stem Test Performed
1965-06-26 Production Casing Operation Performed
1965-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-06-27 Perforation Treatment Performed - Jet Perforation
1965-07-13 Well Began Production
1965-07-13 Well Fluid changed to Crude Oil
1965-07-13 Well Mode changed to Flowing
1965-11-02 Well Fluid changed to Crude Oil
1965-11-02 Well Mode changed to Pumping
1968-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-10 Perforation Treatment Performed - Cement Squeeze
1972-05-10 Well Fluid changed to Crude Oil
1972-05-10 Well Mode changed to Flowing
1997-04-23 Perforation Treatment Performed - Jet Perforation
1997-04-23 Well Log Performed
1997-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-07-15 Well Log Performed
1999-07-16 Well Log Performed
1999-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-19 Plug Back Performed
1999-07-20 Perforation Treatment Performed - Cement Plug
1999-07-20 Plug Back Performed
1999-07-21 Perforation Treatment Performed - Jet Perforation
1999-07-21 Perforation Treatment Performed - Remedial Casing
1999-07-22 Perforation Treatment Performed - Cement Plug
1999-07-22 Well Abandoned
1999-07-22 Well Fluid changed to Crude Oil
1999-07-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-06-27 Perforation 1898.00 1898.90 7
1999-07-20 Cement Plug 300.00 1200.00 0
1999-07-21 Perforation 300.00 300.10 13
1999-07-21 Remedial Casing Cementing 300.00 300.10 0
1999-07-22 Cement Plug 116.00 300.10 0
1965-06-27 Perforation 1864.80 1865.40 7
1965-06-27 Acid Treatment 1864.80 1865.40 0
1965-06-27 Acid Treatment 1898.00 1898.90 0
1968-03-13 Acid Treatment 1898.00 1898.90 0
1972-05-10 Cement Squeeze 1898.00 1898.90 0
1997-04-23 Perforation 1865.40 1869.60 20
1997-04-24 Acid Treatment 1864.80 1869.60 0
1999-07-19 Packing Device Capped w/Cement 1847.00 1855.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1403 0.0 0.0 0.0
1968 2194 0.0 0.0 0.0
1970 1804 0.0 0.0 0.0
1971 3820 0.0 0.0 0.0
1972 2364 0.0 0.0 0.0
1975 1988 0.0 0.0 0.0
1976 3168 0.0 0.0 0.0
1978 1594 0.0 0.0 0.0
1979 8495 0.0 0.0 0.0
1980 8411 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8535 0.0 0.0 0.0
1983 8639 0.0 0.0 0.0
1984 8320 0.0 0.0 0.0
1985 6446 0.0 0.0 0.0
1986 6716 0.0 0.0 0.0
1987 8465 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8419 0.0 0.0 0.0
1990 8461 0.0 0.0 0.0
1991 8303 0.0 0.0 0.0
1992 8533 0.0 0.0 0.0
1993 8365 0.0 0.0 0.0
1994 7592 0.0 0.0 0.0
1997 4958 0.0 0.0 0.0
1998 8335 0.0 0.0 0.0
1999 4238 0.0 0.0 0.0

For data sources see[5]

References