X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242106000

Well Details

Well ID: 0404242106000
Loading map...
Location: 00/06-21-040-24W4/0
Location Alias: 00/06-21-40-24 W4M
Location Alias 2: 00/06-21-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 6-21-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006271
License Date: 1953-04-01
License Status: Suspension
Spud Date: 1953-04-13
Final Drill Date: 1953-05-15
Well Total Depth: 1935.50 m
Surface Hole Latitude: 52.454133
Surface Hole Longitude: -113.402312

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-01 Obtained License
1953-05-11 Drill Stem Test Performed
1953-05-15 Finished Drilling
1953-05-15 Well Mode changed to Drilled and Cased
1953-05-16 Production Casing Operation Performed
1953-05-19 Perforation Treatment Performed - Bullet Perforation
1953-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-05-22 Well Began Production
1953-05-22 Well Fluid changed to Crude Oil
1953-05-22 Well Mode changed to Flowing
1953-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1953-05-26 Perforation Treatment Performed - Jet Perforation
1953-05-30 Perforation Treatment Performed - Acid Wash - No Pressure
1953-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-14 Well Fluid changed to Crude Oil
1982-05-14 Well Mode changed to Pumping
1985-03-20 Well Log Performed
1985-03-21 Perforation Treatment Performed - Cement Squeeze
1985-03-21 Well Log Performed
1985-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-22 Perforation Treatment Performed - Jet Perforation
1985-07-10 Perforation Treatment Performed - Cement Squeeze
1985-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-11 Perforation Treatment Performed - Jet Perforation
1985-07-13 Perforation Treatment Performed - Jet Perforation
1985-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-16 Well Fluid changed to Crude Oil
1985-07-16 Well Mode changed to Pumping
1985-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-28 Perforation Treatment Performed - Cement Squeeze
1985-08-28 Plug Back Performed
1985-08-28 Well Fluid changed to Crude Oil
1985-08-28 Well Mode changed to Pumping
1995-05-01 Well Fluid changed to Crude Oil
1995-05-01 Well Mode changed to Suspended
1996-12-15 Well Log Performed
1996-12-19 Well Log Performed
1996-12-20 Perforation Treatment Performed - Jet Perforation
1996-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-24 Well Log Performed
1997-04-25 Perforation Treatment Performed - Jet Perforation
1997-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-16 Well Fluid changed to Crude Oil
1997-05-16 Well Mode changed to Suspended
1997-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-03 Perforation Treatment Performed - Jet Perforation
2006-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-24 Plug Back Performed
2006-11-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-19 Bullet Perforation 1919.30 1920.20 20
1985-07-10 Cement Squeeze 1914.50 1915.50 0
1985-07-11 Perforation 1910.50 1911.00 13
1985-07-11 Acid Treatment 1910.50 1911.00 0
1985-07-13 Perforation 1881.20 1881.50 13
1985-07-16 Acid Treatment 1881.20 1881.50 0
1985-08-20 Acid Treatment 1881.20 1881.50 0
1985-08-28 Cement Squeeze 1881.20 1881.50 0
1996-12-20 Perforation 1875.50 1878.00 17
1996-12-22 Acid Treatment 1875.50 1878.00 0
1997-04-25 Perforation 1876.00 1880.00 13
1953-05-20 Acid Treatment 1919.30 1920.20 0
1997-04-29 Acid Treatment 1875.50 1880.00 0
1997-11-13 Acid Treatment 1875.50 1880.00 0
2003-02-28 Packing Device Capped w/Cement 1862.00 1870.00 0
2003-03-03 Perforation 1629.50 1632.50 17
2006-11-24 Packing Device Capped w/Cement 1612.00 1620.00 0
1953-05-26 Packing Device Capped w/Cement 1918.40 1918.40 0
1953-05-26 Perforation 1917.50 1918.40 13
1953-05-30 Acid Wash 1917.50 1918.40 0
1953-06-01 Acid Treatment 1917.50 1918.40 0
1985-03-21 Cement Squeeze 1917.50 1918.40 0
1985-03-22 Perforation 1914.50 1915.50 13
1985-03-22 Acid Treatment 1914.50 1915.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3697 0.0 0.0 0.0
1968 4697 0.0 0.0 0.0
1969 2540 0.0 0.0 0.0
1970 24 0.0 0.0 0.0
1982 4522 0.0 0.0 0.0
1983 6889 0.0 0.0 0.0
1985 2685 0.0 0.0 0.0
1986 5760 0.0 0.0 0.0
1987 5851 0.0 0.0 0.0
1988 8765 0.0 0.0 0.0
1989 1200 0.0 0.0 0.0

For data sources see[5]

References