X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242105002

Well Details

Well ID: 0404242105002
Loading map...
Location: 00/05-21-040-24W4/2
Location Alias: 00/05-21-40-24 W4M
Location Alias 2: 00/05-21-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 5-21-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0005300
License Date: 1952-09-13
License Status: Suspension
Spud Date: 1952-09-18
Final Drill Date: 1952-10-24
Well Total Depth: 1941.60 m
Surface Hole Latitude: 52.454130
Surface Hole Longitude: -113.408238

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-13 Obtained License
1952-10-15 Drill Stem Test Performed
1952-10-16 Drill Stem Test Performed
1952-10-17 Drill Stem Test Performed
1952-10-24 Finished Drilling
1952-10-24 Well Mode changed to Drilled and Cased
1952-10-25 Production Casing Operation Performed
1952-10-28 Perforation Treatment Performed - Selective Bullet Perforations
1952-10-30 Perforation Treatment Performed - Selective Bullet Perforations
1952-11-08 Well Began Production
1952-11-08 Well Fluid changed to Crude Oil
1952-11-08 Well Mode changed to Flowing
1953-10-20 Drill Stem Test Performed
1953-10-21 Drill Stem Test Performed
1953-10-22 Drill Stem Test Performed
1966-03-19 Well Fluid changed to Crude Oil
1966-03-19 Well Mode changed to Suspended
1967-06-07 Perforation Treatment Performed - Acid Wash - No Pressure
1967-06-07 Perforation Treatment Performed - Cement Squeeze
1967-06-07 Well Fluid changed to Crude Oil
1967-06-07 Well Mode changed to Abandoned Zone
1985-04-19 Perforation Treatment Performed - Cement Squeeze
1985-04-19 Well Log Performed
1985-04-20 Perforation Treatment Performed - Jet Perforation
1985-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-03 Perforation Treatment Performed - Cement Squeeze
1993-05-04 Perforation Treatment Performed - Jet Perforation
1997-08-30 Perforation Treatment Performed - Cement Squeeze
1997-08-30 Plug Back Performed
1997-08-30 Well Log Performed
1997-09-02 Perforation Treatment Performed - Jet Perforation
1997-09-02 Well Log Performed
1997-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-10 Well Fluid changed to Crude Oil
1997-09-10 Well Mode changed to Pumping
2005-08-10 Well Log Performed
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-28 Selective Bullet Perforations 1887.30 1888.80 0
1997-08-30 Cement Squeeze 1917.50 1918.50 0
1997-09-02 Perforation 1883.00 1887.00 17
1997-09-04 Acid Treatment 1883.00 1887.00 0
1952-10-30 Selective Bullet Perforations 1923.30 1925.10 0
1967-06-07 Acid Wash 1887.30 1888.80 0
1967-06-07 Cement Squeeze 1887.30 1888.80 0
1985-04-19 Cement Squeeze 1923.30 1925.10 0
1985-04-20 Perforation 1921.00 1921.50 13
1985-04-23 Acid Treatment 1921.00 1921.50 0
1993-05-03 Cement Squeeze 1921.00 1921.50 0
1993-05-04 Perforation 1917.50 1918.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1997 588 0.0 0.0 0.0

For data sources see[5]

References