X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242102000

Well Details

Well ID: 0404242102000
Loading map...
Location: 00/02-21-040-24W4/0
Location Alias: 00/02-21-40-24 W4M
Location Alias 2: 00/02-21-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 2-21-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0005891
License Date: 1952-12-31
License Status: Suspension
Spud Date: 1952-12-31
Final Drill Date: 1953-02-13
Well Total Depth: 1921.50 m
Surface Hole Latitude: 52.451241
Surface Hole Longitude: -113.397531

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-31 Obtained License
1953-01-30 Drill Stem Test Performed
1953-01-31 Drill Stem Test Performed
1953-02-01 Drill Stem Test Performed
1953-02-05 Drill Stem Test Performed
1953-02-06 Drill Stem Test Performed
1953-02-07 Drill Stem Test Performed
1953-02-08 Drill Stem Test Performed
1953-02-10 Production Casing Operation Performed
1953-02-13 Finished Drilling
1953-02-13 Perforation Treatment Performed - Open-Hole Completion
1953-02-13 Well Mode changed to Drilled and Cased
1953-02-15 Drill Stem Test Performed
1953-02-15 Perforation Treatment Performed - Jet Perforation
1953-02-16 Drill Stem Test Performed
1953-02-18 Drill Stem Test Performed
1953-03-06 Well Began Production
1953-03-06 Well Fluid changed to Crude Oil
1953-03-06 Well Mode changed to Flowing
1954-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-11 Perforation Treatment Performed - Acid Wash - No Pressure
1954-10-11 Perforation Treatment Performed - Cement Squeeze
1954-10-13 Drill Stem Test Performed
1954-10-13 Perforation Treatment Performed - Jet Perforation
1954-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-14 Perforation Treatment Performed - Acid Wash - No Pressure
1954-10-14 Perforation Treatment Performed - Cement Squeeze
1954-10-16 Drill Stem Test Performed
1954-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-18 Perforation Treatment Performed - Cement Squeeze
1954-10-20 Drill Stem Test Performed
1954-10-21 Drill Stem Test Performed
1954-10-21 Perforation Treatment Performed - Bullet Perforation
1954-10-21 Well Fluid changed to Crude Oil
1954-10-21 Well Mode changed to Abandoned Zone
1954-10-22 Perforation Treatment Performed - Cement Squeeze
1994-06-30 Well Log Performed
1994-07-05 Perforation Treatment Performed - Cement Squeeze
1994-07-05 Plug Back Performed
1994-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-06 Perforation Treatment Performed - Cement Squeeze
1994-07-07 Well Log Performed
1994-07-08 Perforation Treatment Performed - Jet Perforation
1994-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-15 Well Log Performed
1994-09-16 Perforation Treatment Performed - Jet Perforation
1994-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-26 Well Fluid changed to Crude Oil
1994-09-26 Well Mode changed to Pumping
2010-03-14 Well Log Performed
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended
2015-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-28 Perforation Treatment Performed - Cement Squeeze
2015-09-28 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-02-13 Open Hole/Barefoot Completion 1920.50 1921.50 0
1954-10-17 Acid Treatment 1886.40 1887.30 0
1954-10-18 Cement Squeeze 1886.40 1887.30 0
1954-10-21 Bullet Perforation 1903.20 1904.10 13
1954-10-22 Cement Squeeze 1903.20 1904.10 0
1994-07-05 Cement Squeeze 1920.50 1921.50 0
1994-07-06 Acid Treatment 1886.40 1887.30 0
1994-07-06 Cement Squeeze 1886.40 1887.30 0
1994-07-08 Perforation 1914.60 1916.50 17
1994-07-09 Acid Treatment 1914.60 1916.50 0
1994-09-16 Perforation 1879.30 1882.30 17
1953-02-15 Perforation 1886.40 1887.30 13
1994-09-20 Acid Treatment 1879.30 1882.30 0
2015-09-28 Cement Squeeze 1879.30 1882.30 0
2015-09-28 Packing Device Capped w/Cement 1835.00 1900.60 0
1954-10-11 Acid Wash 1886.40 1887.30 0
1954-10-11 Acid Treatment 1886.40 1887.30 0
1954-10-11 Cement Squeeze 1886.40 1887.30 0
1954-10-13 Perforation 1886.40 1887.30 13
1954-10-14 Acid Wash 1886.40 1887.30 0
1954-10-14 Acid Treatment 1886.40 1887.30 0
1954-10-14 Cement Squeeze 1886.40 1887.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1994 2240 0.0 0.0 0.0
1995 8097 0.0 0.0 0.0
1996 8045 0.0 0.0 0.0
1997 8231 0.0 0.0 0.0
1998 8457 0.0 0.0 0.0
1999 8073 0.0 0.0 0.0
2000 8703 0.0 0.0 0.0
2001 8455 0.0 0.0 0.0
2002 8387 0.0 0.0 0.0
2003 8591 0.0 0.0 0.0
2004 648 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References