X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242101000

Well Details

Well ID: 0404242101000
Loading map...
Location: 00/01-21-040-24W4/0
Location Alias: 00/01-21-40-24 W4M
Location Alias 2: 00/01-21-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 21
County/Municipality: Lacombe County
Well Name: ALTAIR FRONTIER CLIVE 1-21-40-24
Operator Name: The Paddon Hughes Development Co. Ltd.
License Number: 0024534
License Date: 1963-07-18
License Status: RecCertified
Spud Date: 1963-08-03
Final Drill Date: 1963-08-19
Well Total Depth: 1912.00 m
Surface Hole Latitude: 52.449808
Surface Hole Longitude: -113.391592

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-07-18 Obtained License
1963-08-19 Finished Drilling
1963-08-19 Well Mode changed to Drilled and Cased
1963-08-20 Production Casing Operation Performed
1963-08-29 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-01 Well Began Production
1963-09-01 Well Fluid changed to Crude Oil
1963-09-01 Well Mode changed to Flowing
1963-09-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-01 Well Fluid changed to Crude Oil
1963-10-01 Well Mode changed to Flowing
1963-12-05 Perforation Treatment Performed - Cement Squeeze
1963-12-05 Well Fluid changed to Crude Oil
1963-12-05 Well Mode changed to Flowing
1967-09-04 Perforation Treatment Performed - Cement Squeeze
1967-09-05 Perforation Treatment Performed - Cement Squeeze
1967-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-09-08 Perforation Treatment Performed - Jet Perforation
1967-09-10 Perforation Treatment Performed - Cement Squeeze
1967-10-10 Well Fluid changed to Crude Oil
1967-10-10 Well Mode changed to Suspended
1969-06-19 Perforation Treatment Performed - Cement Plug
1969-06-20 Well Abandoned
1969-06-20 Well Fluid changed to Crude Oil
1969-06-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-08-29 Hydra Jet Perforation 1876.00 1876.00 0
1967-09-08 Acid Treatment 1910.50 1910.80 0
1967-09-10 Cement Squeeze 1910.50 1910.80 0
1969-06-19 Cement Plug 1085.70 1124.70 0
1963-08-29 Hydra Jet Perforation 1909.90 1909.90 0
1963-08-29 Acid Treatment 1876.00 1909.90 0
1963-09-02 Hydra Jet Perforation 1876.00 1876.00 0
1963-09-02 Acid Treatment 1876.00 1876.00 0
1963-12-05 Cement Squeeze 1876.00 1876.00 0
1967-09-04 Cement Squeeze 1909.90 1909.90 0
1967-09-05 Cement Squeeze 1909.90 1909.90 0
1967-09-08 Perforation 1910.50 1910.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0

For data sources see[5]

References