X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241616002

Well Details

Well ID: 0404241616002
Loading map...
Location: 00/16-16-040-24W4/2
Location Alias: 00/16-16-40-24 W4M
Location Alias 2: 00/16-16-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 16-16-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006533
License Date: 1953-06-04
License Status: Suspension
Spud Date: 1953-06-05
Final Drill Date: 1953-07-01
Well Total Depth: 1937.60 m
Surface Hole Latitude: 52.446582
Surface Hole Longitude: -113.390960

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-04 Obtained License
1953-07-01 Drill Stem Test Performed
1953-07-01 Finished Drilling
1953-07-01 Well Mode changed to Drilled and Cased
1953-07-02 Production Casing Operation Performed
1953-07-06 Perforation Treatment Performed - Jet Perforation
1956-06-19 Perforation Treatment Performed - Cement Squeeze
1956-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-06-22 Perforation Treatment Performed - Bullet Perforation
1956-06-22 Perforation Treatment Performed - Cement Squeeze
1956-06-25 Perforation Treatment Performed - Bullet Perforation
1956-06-25 Perforation Treatment Performed - Jet Perforation
1956-06-27 Perforation Treatment Performed - Bullet Perforation
1956-06-29 Perforation Treatment Performed - Acid Wash - No Pressure
1958-05-21 Perforation Treatment Performed - Cement Squeeze
1958-05-28 Perforation Treatment Performed - Bullet Perforation
1958-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-30 Perforation Treatment Performed - Acid Wash - No Pressure
1964-06-28 Perforation Treatment Performed - Bullet Perforation
1964-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-29 Perforation Treatment Performed - Cement Squeeze
1964-07-02 Perforation Treatment Performed - Jet Perforation
1964-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-03 Perforation Treatment Performed - Acid Wash - No Pressure
1978-03-22 Perforation Treatment Performed - Cement Squeeze
1978-03-23 Perforation Treatment Performed - Jet Perforation
1978-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-30 Well Began Production
1978-03-30 Well Fluid changed to Crude Oil
1978-03-30 Well Mode changed to Flowing
1988-10-18 Well Fluid changed to Crude Oil
1988-10-18 Well Mode changed to Pumping
1991-10-24 Perforation Treatment Performed - Cement Squeeze
1991-10-25 Perforation Treatment Performed - Jet Perforation
1991-10-29 Perforation Treatment Performed - Cement Squeeze
1991-11-01 Perforation Treatment Performed - Jet Perforation
1991-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-03 Perforation Treatment Performed - Cement Squeeze
1994-08-17 Perforation Treatment Performed - Jet Perforation
1994-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-20 Perforation Treatment Performed - Jet Perforation
1994-08-24 Perforation Treatment Performed - Cement Squeeze
1994-08-26 Perforation Treatment Performed - Jet Perforation
1994-08-26 Well Log Performed
1996-09-30 Well Fluid changed to Crude Oil
1996-09-30 Well Mode changed to Suspended
1998-09-28 Well Fluid changed to Crude Oil
1998-09-28 Well Mode changed to Pumping
2003-06-08 Perforation Treatment Performed - Cement Squeeze
2003-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-09 Perforation Treatment Performed - Jet Perforation
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-07-06 Perforation 1917.20 1917.80 13
1958-05-21 Cement Squeeze 1915.10 1915.70 0
1958-05-28 Bullet Perforation 1913.20 1913.80 20
1958-05-30 Acid Wash 1913.20 1913.80 0
1958-05-30 Acid Treatment 1913.20 1913.80 0
1964-06-28 Bullet Perforation 1914.40 1915.70 13
1964-06-29 Acid Treatment 1913.20 1915.70 0
1964-06-29 Cement Squeeze 1913.20 1915.70 0
1964-07-02 Perforation 1912.30 1912.90 7
1964-07-03 Acid Wash 1912.30 1912.90 0
1964-07-03 Acid Treatment 1912.30 1912.90 0
1956-06-19 Cement Squeeze 1917.20 1917.80 0
1978-03-22 Cement Squeeze 1912.30 1912.90 0
1978-03-23 Perforation 1879.40 1881.20 13
1978-03-24 Acid Treatment 1879.40 1881.20 0
1991-10-24 Cement Squeeze 1879.40 1881.20 0
1991-10-25 Perforation 1875.10 1876.60 16
1991-10-29 Cement Squeeze 1875.10 1876.60 0
1991-11-01 Perforation 1873.00 1874.20 16
1991-11-07 Acid Treatment 1873.00 1874.20 0
1994-08-03 Cement Squeeze 1873.00 1874.20 0
1994-08-17 Perforation 1908.60 1909.80 18
1956-06-22 Bullet Perforation 1917.20 1917.80 13
1994-08-18 Acid Treatment 1908.60 1909.80 0
1994-08-20 Perforation 1868.90 1870.20 18
1994-08-24 Cement Squeeze 1868.90 1870.20 0
1994-08-26 Perforation 1871.20 1872.10 17
2003-06-08 Cement Squeeze 1871.20 1872.10 0
2003-06-09 Perforation 1866.00 1869.50 17
2003-06-09 Acid Treatment 1866.00 1869.50 0
1956-06-22 Acid Treatment 1917.20 1917.80 0
1956-06-22 Cement Squeeze 1917.20 1917.80 0
1956-06-25 Perforation 1915.10 1915.70 13
1956-06-25 Bullet Perforation 1915.10 1915.70 13
1956-06-27 Bullet Perforation 1915.10 1915.70 20
1956-06-29 Acid Wash 1915.10 1915.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 4159 0.0 0.0 0.0
1979 1156 0.0 0.0 0.0
1980 7810 0.0 0.0 0.0
1981 8683 0.0 0.0 0.0
1982 8080 0.0 0.0 0.0
1983 8059 0.0 0.0 0.0
1984 7711 0.0 0.0 0.0
1985 7254 0.0 0.0 0.0
1986 1440 0.0 0.0 0.0
1987 118 0.0 0.0 0.0
1991 1027 0.0 0.0 0.0
1992 7431 0.0 0.0 0.0
1993 8190 0.0 0.0 0.0
1994 6703 0.0 0.0 0.0
1995 576 0.0 0.0 0.0
1998 504 0.0 0.0 0.0
1999 1344 0.0 0.0 0.0

For data sources see[5]

References