If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404241616002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.446582,"lon":-113.39096,"icon":""}]} |
Location: 00/16-16-040-24W4/2 | |
Location Alias: 00/16-16-40-24 W4M | |
Location Alias 2: 00/16-16-040-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 16 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 16-16-40-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0006533 | |
License Date: 1953-06-04 | |
License Status: Suspension | |
Spud Date: 1953-06-05 | |
Final Drill Date: 1953-07-01 | |
Well Total Depth: 1937.60 m | |
Surface Hole Latitude: 52.446582 | |
Surface Hole Longitude: -113.390960 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-06-04 | Obtained License |
1953-07-01 | Drill Stem Test Performed |
1953-07-01 | Finished Drilling |
1953-07-01 | Well Mode changed to Drilled and Cased |
1953-07-02 | Production Casing Operation Performed |
1953-07-06 | Perforation Treatment Performed - Jet Perforation |
1956-06-19 | Perforation Treatment Performed - Cement Squeeze |
1956-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-06-22 | Perforation Treatment Performed - Bullet Perforation |
1956-06-22 | Perforation Treatment Performed - Cement Squeeze |
1956-06-25 | Perforation Treatment Performed - Bullet Perforation |
1956-06-25 | Perforation Treatment Performed - Jet Perforation |
1956-06-27 | Perforation Treatment Performed - Bullet Perforation |
1956-06-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
1958-05-21 | Perforation Treatment Performed - Cement Squeeze |
1958-05-28 | Perforation Treatment Performed - Bullet Perforation |
1958-05-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-05-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
1964-06-28 | Perforation Treatment Performed - Bullet Perforation |
1964-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-06-29 | Perforation Treatment Performed - Cement Squeeze |
1964-07-02 | Perforation Treatment Performed - Jet Perforation |
1964-07-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-07-03 | Perforation Treatment Performed - Acid Wash - No Pressure |
1978-03-22 | Perforation Treatment Performed - Cement Squeeze |
1978-03-23 | Perforation Treatment Performed - Jet Perforation |
1978-03-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-03-30 | Well Began Production |
1978-03-30 | Well Fluid changed to Crude Oil |
1978-03-30 | Well Mode changed to Flowing |
1988-10-18 | Well Fluid changed to Crude Oil |
1988-10-18 | Well Mode changed to Pumping |
1991-10-24 | Perforation Treatment Performed - Cement Squeeze |
1991-10-25 | Perforation Treatment Performed - Jet Perforation |
1991-10-29 | Perforation Treatment Performed - Cement Squeeze |
1991-11-01 | Perforation Treatment Performed - Jet Perforation |
1991-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-03 | Perforation Treatment Performed - Cement Squeeze |
1994-08-17 | Perforation Treatment Performed - Jet Perforation |
1994-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-20 | Perforation Treatment Performed - Jet Perforation |
1994-08-24 | Perforation Treatment Performed - Cement Squeeze |
1994-08-26 | Perforation Treatment Performed - Jet Perforation |
1994-08-26 | Well Log Performed |
1996-09-30 | Well Fluid changed to Crude Oil |
1996-09-30 | Well Mode changed to Suspended |
1998-09-28 | Well Fluid changed to Crude Oil |
1998-09-28 | Well Mode changed to Pumping |
2003-06-08 | Perforation Treatment Performed - Cement Squeeze |
2003-06-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-06-09 | Perforation Treatment Performed - Jet Perforation |
2011-12-31 | Well Fluid changed to Crude Oil |
2011-12-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-07-06 | Perforation | 1917.20 | 1917.80 | 13 |
1958-05-21 | Cement Squeeze | 1915.10 | 1915.70 | 0 |
1958-05-28 | Bullet Perforation | 1913.20 | 1913.80 | 20 |
1958-05-30 | Acid Wash | 1913.20 | 1913.80 | 0 |
1958-05-30 | Acid Treatment | 1913.20 | 1913.80 | 0 |
1964-06-28 | Bullet Perforation | 1914.40 | 1915.70 | 13 |
1964-06-29 | Acid Treatment | 1913.20 | 1915.70 | 0 |
1964-06-29 | Cement Squeeze | 1913.20 | 1915.70 | 0 |
1964-07-02 | Perforation | 1912.30 | 1912.90 | 7 |
1964-07-03 | Acid Wash | 1912.30 | 1912.90 | 0 |
1964-07-03 | Acid Treatment | 1912.30 | 1912.90 | 0 |
1956-06-19 | Cement Squeeze | 1917.20 | 1917.80 | 0 |
1978-03-22 | Cement Squeeze | 1912.30 | 1912.90 | 0 |
1978-03-23 | Perforation | 1879.40 | 1881.20 | 13 |
1978-03-24 | Acid Treatment | 1879.40 | 1881.20 | 0 |
1991-10-24 | Cement Squeeze | 1879.40 | 1881.20 | 0 |
1991-10-25 | Perforation | 1875.10 | 1876.60 | 16 |
1991-10-29 | Cement Squeeze | 1875.10 | 1876.60 | 0 |
1991-11-01 | Perforation | 1873.00 | 1874.20 | 16 |
1991-11-07 | Acid Treatment | 1873.00 | 1874.20 | 0 |
1994-08-03 | Cement Squeeze | 1873.00 | 1874.20 | 0 |
1994-08-17 | Perforation | 1908.60 | 1909.80 | 18 |
1956-06-22 | Bullet Perforation | 1917.20 | 1917.80 | 13 |
1994-08-18 | Acid Treatment | 1908.60 | 1909.80 | 0 |
1994-08-20 | Perforation | 1868.90 | 1870.20 | 18 |
1994-08-24 | Cement Squeeze | 1868.90 | 1870.20 | 0 |
1994-08-26 | Perforation | 1871.20 | 1872.10 | 17 |
2003-06-08 | Cement Squeeze | 1871.20 | 1872.10 | 0 |
2003-06-09 | Perforation | 1866.00 | 1869.50 | 17 |
2003-06-09 | Acid Treatment | 1866.00 | 1869.50 | 0 |
1956-06-22 | Acid Treatment | 1917.20 | 1917.80 | 0 |
1956-06-22 | Cement Squeeze | 1917.20 | 1917.80 | 0 |
1956-06-25 | Perforation | 1915.10 | 1915.70 | 13 |
1956-06-25 | Bullet Perforation | 1915.10 | 1915.70 | 13 |
1956-06-27 | Bullet Perforation | 1915.10 | 1915.70 | 20 |
1956-06-29 | Acid Wash | 1915.10 | 1915.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 4159 | 0.0 | 0.0 | 0.0 |
1979 | 1156 | 0.0 | 0.0 | 0.0 |
1980 | 7810 | 0.0 | 0.0 | 0.0 |
1981 | 8683 | 0.0 | 0.0 | 0.0 |
1982 | 8080 | 0.0 | 0.0 | 0.0 |
1983 | 8059 | 0.0 | 0.0 | 0.0 |
1984 | 7711 | 0.0 | 0.0 | 0.0 |
1985 | 7254 | 0.0 | 0.0 | 0.0 |
1986 | 1440 | 0.0 | 0.0 | 0.0 |
1987 | 118 | 0.0 | 0.0 | 0.0 |
1991 | 1027 | 0.0 | 0.0 | 0.0 |
1992 | 7431 | 0.0 | 0.0 | 0.0 |
1993 | 8190 | 0.0 | 0.0 | 0.0 |
1994 | 6703 | 0.0 | 0.0 | 0.0 |
1995 | 576 | 0.0 | 0.0 | 0.0 |
1998 | 504 | 0.0 | 0.0 | 0.0 |
1999 | 1344 | 0.0 | 0.0 | 0.0 |
For data sources see[5]