X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241611000

Well Details

Well ID: 0404241611000
Loading map...
Location: 00/11-16-040-24W4/0
Location Alias: 00/11-16-40-24 W4M
Location Alias 2: 00/11-16-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 11-16-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0004339
License Date: 1952-03-10
License Status: Abandoned
Spud Date: 1952-04-21
Final Drill Date: 1952-06-03
Well Total Depth: 1901.30 m
Surface Hole Latitude: 52.443268
Surface Hole Longitude: -113.403089

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-10 Obtained License
1952-05-07 Drill Stem Test Performed
1952-05-08 Drill Stem Test Performed
1952-05-11 Drill Stem Test Performed
1952-06-02 Drill Stem Test Performed
1952-06-03 Drill Stem Test Performed
1952-06-03 Finished Drilling
1952-06-03 Well Mode changed to Drilled and Cased
1952-06-05 Perforation Treatment Performed - Open-Hole Completion
1952-06-05 Production Casing Operation Performed
1952-06-14 Well Began Production
1952-06-14 Well Fluid changed to Crude Oil
1952-06-14 Well Mode changed to Flowing
1971-02-13 Perforation Treatment Performed - Cement Squeeze
1971-02-23 Perforation Treatment Performed - Cement Squeeze
1971-03-04 Perforation Treatment Performed - Cement Squeeze
1971-03-10 Well Fluid changed to Crude Oil
1971-03-10 Well Mode changed to Pumping
1976-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-01 Well Fluid changed to Crude Oil
1996-05-01 Well Mode changed to Suspended
2001-07-13 Well Log Performed
2001-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-14 Perforation Treatment Performed - Cement Squeeze
2001-07-14 Plug Back Performed
2001-07-17 Perforation Treatment Performed - Cement Plug
2001-07-25 Well Abandoned
2001-07-25 Well Fluid changed to Crude Oil
2001-07-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-05 Open Hole/Barefoot Completion 1898.90 1901.30 0
1971-02-13 Cement Squeeze 625.40 627.60 0
1971-02-23 Cement Squeeze 1129.60 1224.70 0
1971-03-04 Cement Squeeze 1154.60 1230.80 0
1976-11-04 Acid Treatment 1898.90 1901.30 0
1977-05-26 Acid Treatment 1898.90 1901.30 0
2001-07-14 Cement Squeeze 1898.90 1901.30 0
2001-07-14 Packing Device Capped w/Cement 1814.70 1883.00 0
2001-07-17 Cement Plug 478.00 994.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4546 0.0 0.0 0.0
1968 4341 0.0 0.0 0.0
1969 2907 0.0 0.0 0.0
1970 2486 0.0 0.0 0.0
1971 5883 0.0 0.0 0.0
1972 7390 0.0 0.0 0.0
1973 8495 0.0 0.0 0.0
1974 5277 0.0 0.0 0.0
1975 8262 0.0 0.0 0.0
1976 7430 0.0 0.0 0.0
1977 6422 0.0 0.0 0.0
1978 8231 0.0 0.0 0.0
1979 8460 0.0 0.0 0.0
1980 8471 0.0 0.0 0.0
1981 8556 0.0 0.0 0.0
1982 6618 0.0 0.0 0.0

For data sources see[5]

References