X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241609002

Well Details

Well ID: 0404241609002
Loading map...
Location: 00/09-16-040-24W4/2
Location Alias: 00/09-16-40-24 W4M
Location Alias 2: 00/09-16-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 9-16-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006337
License Date: 1953-04-22
License Status: Suspension
Spud Date: 1953-04-24
Final Drill Date: 1953-05-24
Well Total Depth: 1949.20 m
Surface Hole Latitude: 52.443285
Surface Hole Longitude: -113.390449

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-22 Obtained License
1953-05-19 Drill Stem Test Performed
1953-05-22 Drill Stem Test Performed
1953-05-23 Drill Stem Test Performed
1953-05-24 Finished Drilling
1953-05-24 Well Mode changed to Drilled and Cased
1953-05-26 Production Casing Operation Performed
1953-05-28 Perforation Treatment Performed - Jet Perforation
1953-05-29 Drill Stem Test Performed
1956-05-05 Perforation Treatment Performed - Cement Squeeze
1956-05-09 Perforation Treatment Performed - Jet Perforation
1956-05-12 Perforation Treatment Performed - Bullet Perforation
1960-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1976-10-24 Well Log Performed
1979-11-19 Well Log Performed
1989-06-09 Well Log Performed
1989-06-14 Perforation Treatment Performed - Cement Squeeze
1989-06-16 Perforation Treatment Performed - Jet Perforation
1989-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-01 Perforation Treatment Performed - Cement Squeeze
1991-10-01 Plug Back Performed
1991-10-01 Well Began Production
1991-10-01 Well Fluid changed to Crude Oil
1991-10-01 Well Mode changed to Pumping
1991-10-02 Perforation Treatment Performed - Jet Perforation
1991-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-08 Perforation Treatment Performed - Jet Perforation
1991-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-04 Perforation Treatment Performed - Acid Wash - No Pressure
1994-08-05 Perforation Treatment Performed - Cement Squeeze
1994-08-05 Well Fluid changed to Crude Oil
1994-08-05 Well Mode changed to Suspended
1994-08-07 Well Log Performed
1994-08-08 Perforation Treatment Performed - Jet Perforation
1994-08-08 Well Log Performed
1994-08-09 Perforation Treatment Performed - Jet Perforation
1994-08-11 Perforation Treatment Performed - Acid Wash - No Pressure
1994-08-12 Perforation Treatment Performed - Cement Squeeze
2003-11-08 Perforation Treatment Performed - Jet Perforation
2003-11-08 Well Log Performed
2003-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-09-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-28 Perforation 1927.90 1928.50 13
1991-10-02 Perforation 1887.50 1889.50 16
1991-10-04 Acid Treatment 1887.50 1889.50 0
1991-10-08 Perforation 1889.50 1891.50 16
1991-10-10 Acid Treatment 1887.50 1891.50 0
1991-10-15 Acid Treatment 1887.50 1891.50 0
1994-08-04 Acid Wash 1887.50 1891.50 0
1994-08-05 Cement Squeeze 1887.50 1891.50 0
1994-08-08 Perforation 1915.50 1917.00 18
1994-08-09 Perforation 1879.00 1883.50 18
1994-08-11 Acid Wash 1879.00 1883.50 0
1956-05-05 Cement Squeeze 1927.90 1928.50 0
1994-08-12 Cement Squeeze 1879.00 1883.50 0
2003-11-08 Perforation 1908.00 1910.00 17
2003-11-12 Acid Treatment 1908.00 1910.00 0
1956-05-09 Perforation 1926.00 1926.60 20
1956-05-12 Bullet Perforation 1926.00 1926.60 20
1960-11-03 Acid Wash 1926.00 1926.60 0
1989-06-14 Cement Squeeze 1926.00 1928.50 0
1989-06-16 Perforation 1920.00 1921.00 13
1989-06-17 Acid Treatment 1920.00 1921.00 0
1991-10-01 Cement Squeeze 1920.00 1921.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1440 0.0 0.0 0.0
1992 48 0.0 0.0 0.0

For data sources see[5]

References