X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241608002

Well Details

Well ID: 0404241608002
Loading map...
Location: 00/08-16-040-24W4/2
Location Alias: 00/08-16-40-24 W4M
Location Alias 2: 00/08-16-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-16-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0007026
License Date: 1953-09-09
License Status: Suspension
Spud Date: 1953-09-17
Final Drill Date: 1953-10-10
Well Total Depth: 1946.10 m
Surface Hole Latitude: 52.439675
Surface Hole Longitude: -113.390463

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-09 Obtained License
1953-10-10 Finished Drilling
1953-10-10 Well Mode changed to Drilled and Cased
1953-10-12 Production Casing Operation Performed
1953-10-14 Perforation Treatment Performed - Jet Perforation
1953-10-19 Perforation Treatment Performed - Bullet Perforation
1953-10-23 Perforation Treatment Performed - Bullet Perforation
1953-10-30 Perforation Treatment Performed - Bullet Perforation
1953-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-10-31 Perforation Treatment Performed - Acid Wash - No Pressure
1956-07-05 Perforation Treatment Performed - Cement Squeeze
1956-07-08 Drill Stem Test Performed
1956-07-08 Perforation Treatment Performed - Bullet Perforation
1956-07-11 Perforation Treatment Performed - Bullet Perforation
1956-07-11 Perforation Treatment Performed - Jet Perforation
1956-07-13 Perforation Treatment Performed - Acid Wash - No Pressure
1956-07-15 Perforation Treatment Performed - Acid Wash - No Pressure
1962-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-28 Perforation Treatment Performed - Cement Squeeze
1982-07-30 Perforation Treatment Performed - Jet Perforation
1983-06-16 Perforation Treatment Performed - Cement Squeeze
1983-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-18 Perforation Treatment Performed - Jet Perforation
1994-05-18 Well Log Performed
1994-05-19 Perforation Treatment Performed - Cement Squeeze
1994-05-20 Perforation Treatment Performed - Jet Perforation
1994-05-20 Well Log Performed
1994-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-26 Perforation Treatment Performed - Jet Perforation
1994-05-26 Well Log Performed
1994-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-31 Perforation Treatment Performed - Jet Perforation
1994-05-31 Well Log Performed
1994-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-08 Well Log Performed
1994-06-14 Well Began Production
1994-06-14 Well Fluid changed to Crude Oil
1994-06-14 Well Mode changed to Pumping
1996-11-06 Well Log Performed
1996-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-08 Plug Back Performed
1996-11-08 Well Fluid changed to Crude Oil
1996-11-08 Well Mode changed to Abandoned and Whipstocked
1998-09-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-14 Perforation 1927.60 1928.50 13
1956-07-11 Perforation 1925.40 1926.00 10
1956-07-11 Bullet Perforation 1925.40 1926.00 10
1956-07-13 Acid Wash 1925.40 1926.00 0
1956-07-15 Acid Wash 1925.40 1926.00 0
1962-01-05 Acid Treatment 1925.40 1926.00 0
1982-07-28 Cement Squeeze 1925.40 1926.00 0
1982-07-30 Perforation 1923.60 1924.60 14
1983-06-16 Cement Squeeze 1923.60 1924.60 0
1983-06-18 Perforation 1921.20 1921.80 7
1983-06-18 Acid Treatment 1921.20 1921.80 0
1953-10-19 Bullet Perforation 1926.60 1927.60 13
1994-05-19 Cement Squeeze 1921.20 1921.80 0
1994-05-20 Perforation 1918.30 1919.50 17
1994-05-24 Acid Treatment 1918.30 1919.50 0
1994-05-26 Perforation 1915.20 1916.20 17
1994-05-27 Acid Treatment 1915.20 1916.20 0
1994-05-31 Perforation 1882.20 1884.10 17
1994-06-01 Acid Treatment 1882.20 1884.10 0
1996-11-08 Packing Device Capped w/Cement 1872.00 1880.00 0
1953-10-19 Bullet Perforation 1927.60 1928.50 13
1953-10-23 Bullet Perforation 1925.70 1926.60 13
1953-10-30 Bullet Perforation 1925.70 1928.50 13
1953-10-31 Acid Wash 1925.70 1928.50 0
1953-10-31 Acid Treatment 1925.70 1928.50 0
1956-07-05 Cement Squeeze 1925.70 1928.50 0
1956-07-08 Bullet Perforation 1925.40 1926.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2913 0.0 0.0 0.0
1995 8420 0.0 0.0 0.0
1996 7171 0.0 0.0 0.0

For data sources see[5]

References