X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241607000

Well Details

Well ID: 0404241607000
Loading map...
Location: 00/07-16-040-24W4/0
Location Alias: 00/07-16-40-24 W4M
Location Alias 2: 00/07-16-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 7-16-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0025097
License Date: 1963-11-08
License Status: Suspension
Spud Date: 1963-11-17
Final Drill Date: 1963-12-07
Well Total Depth: 1935.50 m
Surface Hole Latitude: 52.440488
Surface Hole Longitude: -113.395035

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-11-08 Obtained License
1963-12-07 Finished Drilling
1963-12-07 Well Mode changed to Drilled and Cased
1963-12-09 Production Casing Operation Performed
1963-12-21 Perforation Treatment Performed - Jet Perforation
1963-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-22 Perforation Treatment Performed - Acid Wash - No Pressure
1963-12-24 Well Began Production
1963-12-24 Well Fluid changed to Crude Oil
1963-12-24 Well Mode changed to Flowing
1964-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-18 Perforation Treatment Performed - Acid Wash - No Pressure
1964-04-18 Perforation Treatment Performed - Bullet Perforation
1964-04-21 Well Fluid changed to Crude Oil
1964-04-21 Well Mode changed to Flowing
1979-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-24 Well Fluid changed to Crude Oil
1980-04-24 Well Mode changed to Pumping
1985-08-06 Well Log Performed
1985-08-09 Perforation Treatment Performed - Acid Wash - No Pressure
1985-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-09 Perforation Treatment Performed - Cement Squeeze
1985-08-09 Plug Back Performed
1985-08-09 Well Fluid changed to Crude Oil
1985-08-09 Well Mode changed to Abandoned Zone
1985-08-10 Perforation Treatment Performed - Jet Perforation
1985-08-11 Well Log Performed
1985-08-13 Perforation Treatment Performed - Acid Wash - No Pressure
1985-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-14 Well Log Performed
1994-07-21 Well Log Performed
2005-10-25 Well Log Performed
2005-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-26 Plug Back Performed
2005-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-28 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-12-21 Perforation 1923.30 1923.60 7
1985-08-09 Cement Squeeze 1891.60 1891.60 0
1985-08-10 Perforation 1888.20 1889.00 13
1985-08-13 Acid Wash 1888.20 1889.00 0
1985-08-14 Acid Treatment 1888.20 1889.00 0
2005-10-26 Packing Device Capped w/Cement 1893.00 1900.00 0
2005-10-28 Packing Device Capped w/Cement 1866.00 1874.00 0
1963-12-22 Acid Wash 1923.30 1923.60 0
1963-12-22 Acid Treatment 1923.30 1923.60 0
1964-04-18 Bullet Perforation 1891.60 1891.90 7
1964-04-18 Acid Wash 1891.60 1891.90 0
1964-04-18 Acid Treatment 1891.60 1891.90 0
1979-11-02 Acid Treatment 1923.30 1923.60 0
1985-08-09 Packing Device Capped w/Cement 1891.60 1900.00 0
1985-08-09 Acid Wash 1891.60 1891.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4740 0.0 0.0 0.0
1968 3116 0.0 0.0 0.0
1969 780 0.0 0.0 0.0
1970 832 0.0 0.0 0.0
1975 152 0.0 0.0 0.0
1977 282 0.0 0.0 0.0
1978 4520 0.0 0.0 0.0
1979 4156 0.0 0.0 0.0
1980 4968 0.0 0.0 0.0
1981 8657 0.0 0.0 0.0
1982 8365 0.0 0.0 0.0
1983 8611 0.0 0.0 0.0
1984 8371 0.0 0.0 0.0
1985 4554 0.0 0.0 0.0

For data sources see[5]

References