X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241512000

Well Details

Well ID: 0404241512000
Loading map...
Location: 00/12-15-040-24W4/0
Location Alias: 00/12-15-40-24 W4M
Location Alias 2: 00/12-15-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-15-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006692
License Date: 1953-07-06
License Status: Suspension
Spud Date: 1953-07-10
Final Drill Date: 1953-08-05
Well Total Depth: 1935.80 m
Surface Hole Latitude: 52.443290
Surface Hole Longitude: -113.384231

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-06 Obtained License
1953-07-20 Lost Circulation Occurred
1953-08-01 Drill Stem Test Performed
1953-08-05 Drill Stem Test Performed
1953-08-05 Finished Drilling
1953-08-05 Well Mode changed to Drilled and Cased
1953-08-06 Production Casing Operation Performed
1953-08-09 Perforation Treatment Performed - Jet Perforation
1953-08-09 Well Began Production
1953-08-09 Well Fluid changed to Crude Oil
1953-08-09 Well Mode changed to Flowing
1954-04-28 Perforation Treatment Performed - Acid Wash - No Pressure
1955-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-03 Perforation Treatment Performed - Cement Squeeze
1962-05-07 Perforation Treatment Performed - Jet Perforation
1962-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-25 Well Fluid changed to Crude Oil
1977-09-25 Well Mode changed to Pumping
1980-05-06 Well Log Performed
1980-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-30 Perforation Treatment Performed - Jet Perforation
1980-11-26 Perforation Treatment Performed - Cement Squeeze
1980-11-28 Perforation Treatment Performed - Jet Perforation
1980-11-28 Well Fluid changed to Crude Oil
1980-11-28 Well Mode changed to Pumping
1980-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-11 Perforation Treatment Performed - Cement Squeeze
1981-12-11 Well Fluid changed to Crude Oil
1981-12-11 Well Mode changed to Pumping
1981-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-22 Well Log Performed
1992-06-23 Perforation Treatment Performed - Cement Squeeze
1992-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-29 Perforation Treatment Performed - Jet Perforation
1994-08-17 Perforation Treatment Performed - Jet Perforation
1994-08-17 Well Log Performed
1994-08-19 Well Log Performed
1996-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-13 Well Log Performed
1997-04-15 Well Log Performed
1997-04-16 Perforation Treatment Performed - Jet Perforation
1997-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-24 Well Fluid changed to Crude Oil
1997-04-24 Well Mode changed to Pumping
1997-05-29 Well Log Performed
1997-06-01 Well Fluid changed to Crude Oil
1997-06-01 Well Mode changed to Suspended
2015-12-02 Perforation Treatment Performed - Cement Plug
2015-12-02 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-09 Perforation 1918.10 1919.00 13
1980-11-28 Perforation 1885.50 1887.50 13
1980-11-29 Acid Treatment 1885.50 1887.50 0
1981-04-07 Acid Treatment 1885.50 1887.50 0
1981-12-11 Cement Squeeze 1885.50 1887.50 0
1981-12-15 Acid Treatment 1915.40 1916.30 0
1992-06-23 Cement Squeeze 1915.40 1916.30 0
1992-06-29 Perforation 1910.50 1912.30 17
1992-06-29 Acid Treatment 1910.50 1912.30 0
1994-08-17 Perforation 1908.00 1910.40 18
1996-10-29 Acid Treatment 1908.00 1912.30 0
1954-04-28 Acid Wash 1918.10 1919.00 0
1997-04-16 Perforation 1874.00 1879.00 16
1997-04-19 Acid Treatment 1874.00 1879.00 0
2015-12-02 Cement Plug 524.00 632.00 0
1955-05-11 Acid Treatment 1918.10 1919.00 0
1962-05-03 Cement Squeeze 1918.10 1919.00 0
1962-05-07 Perforation 1915.40 1916.30 13
1962-05-08 Acid Treatment 1915.40 1916.30 0
1980-08-30 Perforation 1910.50 1912.50 13
1980-08-30 Acid Treatment 1910.50 1912.50 13
1980-11-26 Cement Squeeze 1910.50 1912.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4844 0.0 0.0 0.0
1968 3994 0.0 0.0 0.0
1969 2936 0.0 0.0 0.0
1970 3218 0.0 0.0 0.0
1971 4891 0.0 0.0 0.0
1972 5814 0.0 0.0 0.0
1973 4013 0.0 0.0 0.0
1974 721 0.0 0.0 0.0
1975 5592 0.0 0.0 0.0
1976 8388 0.0 0.0 0.0
1977 4984 0.0 0.0 0.0
1978 7635 0.0 0.0 0.0
1979 5992 0.0 0.0 0.0
1980 6294 0.0 0.0 0.0
1981 383 0.0 0.0 0.0
1982 7945 0.0 0.0 0.0
1983 7180 0.0 0.0 0.0
1984 8419 0.0 0.0 0.0
1985 7500 0.0 0.0 0.0
1986 8264 0.0 0.0 0.0
1987 8476 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8372 0.0 0.0 0.0
1990 7855 0.0 0.0 0.0
1992 3943 0.0 0.0 0.0
1993 7549 0.0 0.0 0.0
1994 8413 0.0 0.0 0.0
1995 8347 0.0 0.0 0.0
1996 8425 0.0 0.0 0.0
1997 1917 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1953-07-20 Lost Circulation 1562.70 1562.70
2015-12-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References