Well Details

Well ID: 0404241505000
Loading map...
Location: 00/05-15-040-24W4/0
Location Alias: 00/05-15-40-24 W4M
Location Alias 2: 00/05-15-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 5-15-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006920
License Date: 1953-08-12
License Status: Suspension
Spud Date: 1953-08-13
Final Drill Date: 1953-09-09
Well Total Depth: 1947.70 m
Surface Hole Latitude: 52.439546
Surface Hole Longitude: -113.384448

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-12 Obtained License
1953-09-04 Drill Stem Test Performed
1953-09-06 Drill Stem Test Performed
1953-09-08 Drill Stem Test Performed
1953-09-09 Drill Stem Test Performed
1953-09-09 Finished Drilling
1953-09-09 Production Casing Operation Performed
1953-09-09 Well Mode changed to Drilled and Cased
1953-09-13 Perforation Treatment Performed - Jet Perforation
1953-09-14 Well Began Production
1953-09-14 Well Fluid changed to Crude Oil
1953-09-14 Well Mode changed to Flowing
1957-07-24 Perforation Treatment Performed - Acid Wash - No Pressure
1957-10-06 Perforation Treatment Performed - Cement Squeeze
1957-10-10 Perforation Treatment Performed - Bullet Perforation
1957-10-13 Perforation Treatment Performed - Acid Wash - No Pressure
1975-05-30 Well Fluid changed to Crude Oil
1975-05-30 Well Mode changed to Pumping
1977-08-18 Well Log Performed
1978-02-16 Perforation Treatment Performed - Cement Squeeze
1978-02-22 Perforation Treatment Performed - Jet Perforation
1978-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-08 Perforation Treatment Performed - Cement Squeeze
1982-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-11 Perforation Treatment Performed - Jet Perforation
1994-04-22 Well Log Performed
1994-04-25 Perforation Treatment Performed - Cement Squeeze
1994-04-25 Plug Back Performed
1994-04-26 Perforation Treatment Performed - Jet Perforation
1994-04-26 Well Log Performed
1994-04-27 Perforation Treatment Performed - Acid Wash - No Pressure
1994-04-29 Perforation Treatment Performed - Jet Perforation
1994-04-29 Well Log Performed
1994-05-04 Perforation Treatment Performed - Cement Squeeze
1994-05-04 Plug Back Performed
1996-03-10 Well Log Performed
1996-03-12 Perforation Treatment Performed - Cement Squeeze
1996-03-12 Plug Back Performed
1996-03-13 Perforation Treatment Performed - Jet Perforation
1996-03-15 Perforation Treatment Performed - Jet Perforation
1996-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Pumping
2007-10-29 Well Log Performed
2007-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-04 Plug Back Performed
2007-11-04 Well Fluid changed to Crude Oil
2007-11-04 Well Log Performed
2007-11-04 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-13 Perforation 1929.40 1930.30 13
1982-09-11 Perforation 1923.30 1924.20 13
1982-09-11 Acid Treatment 1923.30 1924.20 0
1994-04-25 Cement Squeeze 1923.30 1924.20 0
1994-04-26 Perforation 1919.50 1922.00 17
1994-04-27 Acid Wash 1919.50 1922.00 0
1994-04-29 Perforation 1912.20 1915.90 17
1994-05-04 Cement Squeeze 1912.20 1915.90 0
1996-03-12 Cement Squeeze 1919.50 1922.00 0
1996-03-13 Perforation 1914.00 1916.00 17
1996-03-15 Perforation 1878.00 1879.50 17
1957-07-24 Acid Wash 1929.40 1930.30 0
1996-03-18 Acid Treatment 1878.00 1879.50 0
2007-11-04 Packing Device Capped w/Cement 1896.50 1904.50 0
1957-10-06 Cement Squeeze 1929.40 1930.30 0
1957-10-10 Bullet Perforation 1927.60 1928.20 20
1957-10-13 Acid Wash 1927.60 1928.20 0
1978-02-16 Cement Squeeze 1927.60 1928.20 0
1978-02-22 Perforation 1925.70 1926.60 13
1978-02-23 Acid Treatment 1925.70 1926.60 0
1982-09-08 Cement Squeeze 1925.70 1926.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3405 0.0 0.0 0.0
1968 4794 0.0 0.0 0.0
1969 3666 0.0 0.0 0.0
1970 3369 0.0 0.0 0.0
1972 1966 0.0 0.0 0.0
1973 8244 0.0 0.0 0.0
1974 6686 0.0 0.0 0.0
1975 8046 0.0 0.0 0.0
1976 8574 0.0 0.0 0.0
1977 5206 0.0 0.0 0.0
1978 6470 0.0 0.0 0.0
1979 6569 0.0 0.0 0.0
1980 8283 0.0 0.0 0.0
1981 8515 0.0 0.0 0.0
1982 6823 0.0 0.0 0.0
1983 7333 0.0 0.0 0.0
1984 2460 0.0 0.0 0.0
1994 5271 0.0 0.0 0.0
1995 8231 0.0 0.0 0.0
1996 8289 0.0 0.0 0.0
1997 8291 0.0 0.0 0.0
1998 8739 0.0 0.0 0.0
1999 7855 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8548 0.0 0.0 0.0
2002 3947 0.0 0.0 0.0

For data sources see[5]