If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404241504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.436065,"lon":-113.38426,"icon":""}]} |
Location: 00/04-15-040-24W4/0 | |
Location Alias: 00/04-15-40-24 W4M | |
Location Alias 2: 00/04-15-040-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 15 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 3-15-40-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0007224 | |
License Date: 1953-10-23 | |
License Status: Suspension | |
Spud Date: 1953-11-07 | |
Final Drill Date: 1953-12-04 | |
Well Total Depth: 1953.20 m | |
Surface Hole Latitude: 52.436065 | |
Surface Hole Longitude: -113.384260 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-10-23 | Obtained License |
1953-12-03 | Drill Stem Test Performed |
1953-12-04 | Finished Drilling |
1953-12-04 | Well Mode changed to Drilled and Cased |
1953-12-05 | Production Casing Operation Performed |
1953-12-07 | Perforation Treatment Performed - Jet Perforation |
1953-12-16 | Well Began Production |
1953-12-16 | Well Fluid changed to Crude Oil |
1953-12-16 | Well Mode changed to Flowing |
1964-03-06 | Perforation Treatment Performed - Bullet Perforation |
1964-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-03-07 | Perforation Treatment Performed - Acid Wash - No Pressure |
1964-03-11 | Well Fluid changed to Crude Oil |
1964-03-11 | Well Mode changed to Flowing |
1967-10-17 | Well Fluid changed to Crude Oil |
1967-10-17 | Well Mode changed to Pumping |
1978-09-01 | Well Fluid changed to Crude Oil |
1978-09-01 | Well Mode changed to Suspended |
1989-09-01 | Well Fluid changed to Crude Oil |
1989-09-01 | Well Mode changed to Pumping |
1989-09-13 | Perforation Treatment Performed - Cement Squeeze |
1989-09-13 | Plug Back Performed |
1989-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-15 | Perforation Treatment Performed - Jet Perforation |
1989-09-15 | Well Fluid changed to Crude Oil |
1989-09-15 | Well Mode changed to Pumping |
1991-12-04 | Perforation Treatment Performed - Cement Squeeze |
1991-12-04 | Plug Back Performed |
1991-12-04 | Well Fluid changed to Crude Oil |
1991-12-04 | Well Mode changed to Abandoned Zone |
1991-12-05 | Perforation Treatment Performed - Jet Perforation |
1991-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-06-18 | Perforation Treatment Performed - Cement Squeeze |
1994-06-18 | Plug Back Performed |
1994-06-22 | Well Log Performed |
1994-06-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-06-23 | Perforation Treatment Performed - Jet Perforation |
1994-06-23 | Well Fluid changed to Crude Oil |
1994-06-23 | Well Mode changed to Pumping |
1996-10-06 | Well Log Performed |
1996-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-07 | Plug Back Performed |
1996-10-07 | Well Fluid changed to Crude Oil |
1996-10-07 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-12-07 | Perforation | 1935.20 | 1936.10 | 13 |
1991-12-07 | Acid Treatment | 1892.80 | 1894.30 | 0 |
1994-06-18 | Acid Treatment | 1892.80 | 1894.30 | 0 |
1994-06-18 | Cement Squeeze | 1892.80 | 1894.30 | 0 |
1994-06-23 | Perforation | 1925.00 | 1926.80 | 18 |
1994-06-23 | Acid Treatment | 1925.00 | 1926.80 | 0 |
1996-10-07 | Packing Device Capped w/Cement | 1904.00 | 1912.00 | 0 |
1964-03-06 | Bullet Perforation | 1898.60 | 1899.50 | 7 |
1964-03-07 | Acid Wash | 1898.60 | 1899.50 | 0 |
1964-03-07 | Acid Treatment | 1898.60 | 1899.50 | 0 |
1989-09-13 | Cement Squeeze | 1898.60 | 1936.10 | 0 |
1989-09-15 | Perforation | 1931.00 | 1932.00 | 13 |
1989-09-15 | Acid Treatment | 1931.00 | 1932.00 | 0 |
1991-12-04 | Cement Squeeze | 1931.00 | 1932.00 | 0 |
1991-12-05 | Perforation | 1892.80 | 1894.30 | 18 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 3027 | 0.0 | 0.0 | 0.0 |
1968 | 3597 | 0.0 | 0.0 | 0.0 |
1969 | 3015 | 0.0 | 0.0 | 0.0 |
1970 | 2823 | 0.0 | 0.0 | 0.0 |
1972 | 2451 | 0.0 | 0.0 | 0.0 |
1973 | 8393 | 0.0 | 0.0 | 0.0 |
1974 | 2284 | 0.0 | 0.0 | 0.0 |
1975 | 1461 | 0.0 | 0.0 | 0.0 |
1976 | 8342 | 0.0 | 0.0 | 0.0 |
1977 | 7871 | 0.0 | 0.0 | 0.0 |
1978 | 3719 | 0.0 | 0.0 | 0.0 |
1989 | 2423 | 0.0 | 0.0 | 0.0 |
1990 | 2779 | 0.0 | 0.0 | 0.0 |
1994 | 4275 | 0.0 | 0.0 | 0.0 |
1995 | 8165 | 0.0 | 0.0 | 0.0 |
1996 | 6437 | 0.0 | 0.0 | 0.0 |
For data sources see[5]