X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241503023

Well Details

Well ID: 0404241503023
Loading map...
Location: 02/03-15-040-24W4/3
Location Alias: 02/03-15-40-24 W4M
Location Alias 2: 02/03-15-040-24 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 3-15-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0007224
License Date: 1953-10-23
License Status: Suspension
Spud Date: 1953-11-07
Final Drill Date: 1996-10-16
Well Total Depth: 2200.00 m
Surface Hole Latitude: 52.436065
Surface Hole Longitude: -113.384260

For data sources see[1][2]

Well History

Date Event
1953-10-23 Obtained License
1996-10-09 Direction Drilling Operation Performed - Deviate
1996-10-13 Direction Drilling Operation Performed - Horizontal
1996-10-13 Well Log Performed
1996-10-15 Liner Casing Operation Performed
1996-10-16 Finished Drilling
1996-10-16 Perforation Treatment Performed - Open-Hole Completion
1996-10-16 Rig Released
1996-10-16 Well Mode changed to Drilled and Cased
1996-10-22 Well Began Production
1996-10-22 Well Fluid changed to Crude Oil
1996-10-22 Well Mode changed to Flowing
1996-10-24 Perforation Treatment Performed - Open-Hole Completion
2003-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-13 Plug Back Performed
2003-04-13 Well Fluid changed to Crude Oil
2003-04-13 Well Mode changed to Abandoned Zone
2003-04-14 Perforation Treatment Performed - Jet Perforation
2003-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-04-17 Perforation Treatment Performed - Jet Perforation
2003-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-06-04 Perforation Treatment Performed - Cement Plug
2015-06-04 Perforation Treatment Performed - Cement Squeeze
2015-06-04 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-10-09 1798.60 Deviate (5 - 79 degrees)
1996-10-13 1970.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-16 Open Hole/Barefoot Completion 2005.70 2009.80 0
2015-06-04 Cement Squeeze 1906.00 1909.00 0
2015-06-04 Cement Plug 1701.70 1910.50 0
1996-10-24 Open Hole/Barefoot Completion 2005.70 2200.00 0
2003-04-13 Packing Device Capped w/Cement 1988.00 2000.00 0
2003-04-14 Perforation 1915.00 1918.00 17
2003-04-14 Perforation 1912.00 1914.00 17
2003-04-15 Acid Treatment 1915.00 1918.00 0
2003-04-15 Acid Treatment 1912.00 1914.00 0
2003-04-17 Perforation 1906.00 1909.00 17
2003-04-23 Acid Treatment 1906.00 1909.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1583 0.0 0.0 0.0
1997 7911 0.0 0.0 0.0
1998 8507 0.0 0.0 0.0
1999 8438 0.0 0.0 0.0
2000 4372 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-04-22 No Incident Encountered 0.00 0.00
2015-06-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References