0404241502002

Well Details

Well ID: 0404241502002
Loading map...
Location: 00/02-15-040-24W4/2
Location Alias: 00/02-15-40-24 W4M
Location Alias 2: 00/02-15-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 2-15-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0028307
License Date: 1965-05-31
License Status: Suspension
Spud Date: 1965-07-06
Final Drill Date: 1965-07-22
Well Total Depth: 1944.60 m
Surface Hole Latitude: 52.436072
Surface Hole Longitude: -113.372408

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-05-31 Obtained License
1965-07-22 Finished Drilling
1965-07-22 Well Mode changed to Drilled and Cased
1965-07-24 Production Casing Operation Performed
1965-07-27 Well Log Performed
1965-08-21 Perforation Treatment Performed - Jet Perforation
1965-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-24 Perforation Treatment Performed - Bullet Perforation
1965-09-06 Well Began Production
1965-09-06 Well Fluid changed to Crude Oil
1965-09-06 Well Mode changed to Flowing
1965-10-19 Well Fluid changed to Crude Oil
1965-10-19 Well Mode changed to Pumping
1969-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-08 Well Fluid changed to Crude Oil
1982-05-08 Well Mode changed to Pumping
1984-12-07 Well Log Performed
1985-06-14 Perforation Treatment Performed - Cement Squeeze
1985-06-14 Plug Back Performed
1985-06-14 Well Fluid changed to Crude Oil
1985-06-14 Well Mode changed to Abandoned Zone
1985-06-15 Perforation Treatment Performed - Jet Perforation
1985-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-19 Perforation Treatment Performed - Cement Squeeze
1985-06-20 Well Log Performed
1985-06-21 Perforation Treatment Performed - Jet Perforation
1985-06-22 Perforation Treatment Performed - Fractured
1990-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-24 Well Log Performed
1995-02-25 Perforation Treatment Performed - Jet Perforation
1995-02-25 Well Log Performed
1995-02-27 Well Began Injection
1995-02-27 Well Fluid changed to Water
1995-02-27 Well Type changed to Injection
1995-02-28 Well Log Performed
1996-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-25 Well Log Performed
1999-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-19 Perforation Treatment Performed - Cement Squeeze
2000-08-19 Plug Back Performed
2000-08-19 Well Log Performed
2000-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-20 Perforation Treatment Performed - Cement Squeeze
2000-08-20 Plug Back Performed
2000-08-20 Well Fluid changed to Water
2000-08-20 Well Mode changed to Abandoned Zone
2000-08-20 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-08-21 Perforation 1918.10 1919.00 7
1985-06-19 Cement Squeeze 1918.10 1919.00 0
1985-06-21 Perforation 1927.80 1933.80 13
1985-06-22 Fracture 1927.80 1933.80 0
1990-12-29 Acid Treatment 1927.80 1933.80 0
1991-01-19 Acid Treatment 1927.80 1933.80 0
1991-10-25 Acid Treatment 1927.80 1933.80 0
1992-12-29 Acid Treatment 1927.80 1933.80 0
1995-02-25 Perforation 1889.80 1897.70 18
1995-02-25 Perforation 1900.60 1905.00 18
1996-12-12 Acid Treatment 1889.80 1905.00 0
1965-08-23 Acid Treatment 1918.10 1919.00 0
1999-12-01 Acid Treatment 1889.80 1905.00 0
2000-08-19 Packing Device Capped w/Cement 1906.00 1914.00 0
2000-08-19 Cement Squeeze 1889.80 1905.00 0
2000-08-20 Cement Squeeze 1889.80 1905.00 0
2000-08-20 Packing Device Capped w/Cement 1865.00 1880.00 0
1965-08-24 Bullet Perforation 1885.80 1886.70 7
1965-08-24 Acid Treatment 1885.80 1886.70 0
1969-12-16 Acid Treatment 1885.80 1886.70 0
1982-05-08 Packing Device Capped w/Cement 1900.90 1911.00 0
1985-06-14 Cement Squeeze 1885.80 1886.70 0
1985-06-15 Perforation 1918.10 1919.00 7
1985-06-19 Acid Treatment 1918.10 1919.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4372 0.0 0.0 0.0
1968 7820 0.0 0.0 0.0
1969 5858 0.0 0.0 0.0
1970 6174 0.0 0.0 0.0
1971 24 0.0 0.0 0.0
1972 380 0.0 0.0 0.0
1973 387 0.0 0.0 0.0
1974 399 0.0 0.0 0.0
1975 24 0.0 0.0 0.0
1976 147 0.0 0.0 0.0
1982 3214 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References