X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241204000

Well Details

Well ID: 0404241204000
Loading map...
Location: 00/04-12-040-24W4/0
Location Alias: 00/04-12-40-24 W4M
Location Alias 2: 00/04-12-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 12
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 4-12-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0031747
License Date: 1967-02-10
License Status: Suspension
Spud Date: 1967-02-12
Final Drill Date: 1967-02-26
Well Total Depth: 1949.80 m
Surface Hole Latitude: 52.420885
Surface Hole Longitude: -113.337059

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-10 Obtained License
1967-02-26 Finished Drilling
1967-02-26 Well Mode changed to Drilled and Cased
1967-02-27 Drill Stem Test Performed
1967-02-28 Production Casing Operation Performed
1967-03-10 Perforation Treatment Performed - Jet Perforation
1967-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-03-15 Perforation Treatment Performed - Cement Squeeze
1967-03-16 Perforation Treatment Performed - Cement Squeeze
1967-03-18 Perforation Treatment Performed - Acid Wash - No Pressure
1967-03-18 Perforation Treatment Performed - Jet Perforation
1967-03-20 Perforation Treatment Performed - Cement Squeeze
1967-03-21 Perforation Treatment Performed - Cement Squeeze
1967-03-22 Perforation Treatment Performed - Acid Wash - No Pressure
1967-03-22 Perforation Treatment Performed - Jet Perforation
1967-03-25 Perforation Treatment Performed - Cement Squeeze
1967-03-27 Perforation Treatment Performed - Abrasa-Jet Perforation
1967-03-29 Perforation Treatment Performed - Acid Wash - No Pressure
1967-03-30 Perforation Treatment Performed - Acid Wash - No Pressure
1967-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-02 Well Began Production
1967-04-02 Well Fluid changed to Crude Oil
1967-04-02 Well Mode changed to Flowing
1967-09-29 Well Fluid changed to Crude Oil
1967-09-29 Well Mode changed to Pumping
1978-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-02 Perforation Treatment Performed - Jet Perforation
1978-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-31 Perforation Treatment Performed - Jet Perforation
2003-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-03 Well Log Performed
2011-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-04 Plug Back Performed
2011-11-04 Well Fluid changed to Crude Oil
2011-11-04 Well Log Performed
2011-11-04 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-03-10 Perforation 1926.90 1928.50 3
1967-03-22 Acid Wash 1888.80 1891.00 0
1967-03-25 Cement Squeeze 1888.80 1891.00 0
1967-03-27 Hydra Jet Perforation 1889.50 1889.50 0
1967-03-29 Acid Wash 1889.50 1889.50 0
1967-03-30 Acid Wash 1889.50 1889.50 0
1967-03-31 Acid Treatment 1889.50 1889.50 0
1978-05-24 Acid Treatment 1889.50 1889.50 13
1978-11-02 Perforation 1889.20 1890.40 13
1978-11-03 Acid Treatment 1889.20 1890.40 0
1981-07-21 Acid Treatment 1889.20 1890.40 0
1967-03-12 Acid Treatment 1926.90 1928.50 0
2003-03-31 Perforation 1886.60 1889.60 17
2003-03-31 Perforation 1879.40 1884.40 17
2003-04-02 Acid Treatment 1879.40 1884.40 0
2003-04-02 Acid Treatment 1886.60 1890.90 0
2011-11-04 Packing Device Capped w/Cement 1862.00 1870.00 0
1967-03-15 Cement Squeeze 1926.90 1928.50 0
1967-03-16 Cement Squeeze 1926.90 1928.50 0
1967-03-18 Perforation 1927.60 1928.50 7
1967-03-18 Acid Wash 1927.60 1928.50 0
1967-03-20 Cement Squeeze 1927.60 1928.50 0
1967-03-21 Cement Squeeze 1927.60 1928.50 0
1967-03-22 Perforation 1888.80 1891.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 5140 0.0 0.0 0.0
1968 8160 0.0 0.0 0.0
1969 7363 0.0 0.0 0.0
1970 6072 0.0 0.0 0.0
1976 492 0.0 0.0 0.0
1977 2662 0.0 0.0 0.0
1978 3906 0.0 0.0 0.0
1979 8159 0.0 0.0 0.0
1980 8256 0.0 0.0 0.0
1981 4439 0.0 0.0 0.0
1982 7506 0.0 0.0 0.0
1983 8711 0.0 0.0 0.0
1984 6813 0.0 0.0 0.0
1985 8009 0.0 0.0 0.0
1986 8543 0.0 0.0 0.0
1987 8452 0.0 0.0 0.0
1988 8747 0.0 0.0 0.0
1989 6908 0.0 0.0 0.0
1991 264 0.0 0.0 0.0
1992 7910 0.0 0.0 0.0
1993 8317 0.0 0.0 0.0
1994 8736 0.0 0.0 0.0
1995 8110 0.0 0.0 0.0
1996 7622 0.0 0.0 0.0
1997 8040 0.0 0.0 0.0
1998 8702 0.0 0.0 0.0
1999 8465 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8517 0.0 0.0 0.0
2002 8454 0.0 0.0 0.0
2003 8393 0.0 0.0 0.0
2004 6167 0.0 0.0 0.0
2005 7415 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8756 0.0 0.0 0.0
2008 7903 0.0 0.0 0.0
2009 4751 0.0 0.0 0.0

For data sources see[5]

References