X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241112000

Well Details

Well ID: 0404241112000
Loading map...
Location: 00/12-11-040-24W4/0
Location Alias: 00/12-11-40-24 W4M
Location Alias 2: 00/12-11-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 11
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-10-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0028246
License Date: 1965-05-20
License Status: Suspension
Spud Date: 1965-06-08
Final Drill Date: 1965-06-26
Well Total Depth: 1943.10 m
Surface Hole Latitude: 52.428208
Surface Hole Longitude: -113.360249

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-05-20 Obtained License
1965-06-26 Finished Drilling
1965-06-26 Well Mode changed to Drilled and Cased
1965-06-27 Production Casing Operation Performed
1965-07-14 Perforation Treatment Performed - Jet Perforation
1965-07-15 Perforation Treatment Performed - Acid Wash - No Pressure
1965-08-08 Perforation Treatment Performed - Jet Perforation
1965-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-13 Perforation Treatment Performed - Jet Perforation
1965-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-20 Well Began Production
1965-08-20 Well Fluid changed to Crude Oil
1965-08-20 Well Mode changed to Flowing
1975-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-19 Well Log Performed
1978-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-20 Perforation Treatment Performed - Jet Perforation
1978-10-17 Perforation Treatment Performed - Jet Perforation
1978-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-05 Perforation Treatment Performed - Cement Squeeze
1979-04-09 Perforation Treatment Performed - Jet Perforation
1979-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-14 Perforation Treatment Performed - Cement Squeeze
1979-06-15 Perforation Treatment Performed - Cement Squeeze
1979-06-15 Well Fluid changed to Crude Oil
1979-06-15 Well Mode changed to Pumping
1992-05-05 Well Log Performed
1992-05-06 Perforation Treatment Performed - Cement Squeeze
1992-05-07 Perforation Treatment Performed - Jet Perforation
1992-05-07 Well Log Performed
1994-03-17 Perforation Treatment Performed - Jet Perforation
1994-03-19 Well Fluid changed to Crude Oil
1994-03-19 Well Mode changed to Pumping
1996-10-18 Well Log Performed
1996-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-20 Plug Back Performed
1996-10-20 Well Fluid changed to Crude Oil
1996-10-20 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-14 Perforation 1891.00 1892.20 7
1975-11-25 Acid Treatment 1922.10 1925.10 0
1978-07-10 Acid Treatment 1891.00 1892.20 0
1978-07-11 Acid Treatment 1891.00 1892.20 0
1978-07-20 Perforation 1922.10 1923.00 13
1978-10-17 Perforation 1886.10 1887.90 13
1978-10-18 Acid Treatment 1886.10 1887.90 0
1979-04-05 Cement Squeeze 1886.10 1887.90 0
1979-04-05 Cement Squeeze 1891.00 1892.20 0
1979-04-09 Perforation 1883.00 1884.30 13
1979-04-10 Acid Treatment 1883.00 1884.30 0
1965-07-15 Acid Wash 1891.00 1892.20 0
1979-06-14 Cement Squeeze 1883.00 1884.30 0
1979-06-15 Cement Squeeze 1883.00 1884.30 0
1992-05-06 Cement Squeeze 1922.10 1925.10 0
1992-05-07 Perforation 1916.00 1918.40 13
1994-03-17 Perforation 1878.50 1881.00 13
1996-10-20 Packing Device Capped w/Cement 1910.00 1910.00 0
1996-10-20 Packing Device Capped w/Cement 1870.00 1870.00 0
1965-08-08 Perforation 1922.10 1925.10 3
1965-08-09 Acid Treatment 1922.10 1925.10 0
1965-08-12 Acid Treatment 1922.10 1925.10 3
1965-08-13 Perforation 1922.40 1925.10 0
1965-08-16 Acid Treatment 1922.10 1925.10 0
1965-08-17 Acid Treatment 1922.10 1925.10 0
1975-11-21 Acid Treatment 1891.00 1892.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3435 0.0 0.0 0.0
1968 3878 0.0 0.0 0.0
1969 4887 0.0 0.0 0.0
1970 5536 0.0 0.0 0.0
1971 5504 0.0 0.0 0.0
1972 7520 0.0 0.0 0.0
1973 4605 0.0 0.0 0.0
1975 892 0.0 0.0 0.0
1976 8304 0.0 0.0 0.0
1977 4392 0.0 0.0 0.0
1978 1463 0.0 0.0 0.0
1979 4342 0.0 0.0 0.0
1980 8135 0.0 0.0 0.0
1981 8691 0.0 0.0 0.0
1982 8356 0.0 0.0 0.0
1983 8743 0.0 0.0 0.0
1984 8423 0.0 0.0 0.0
1985 8742 0.0 0.0 0.0
1986 7871 0.0 0.0 0.0
1987 8500 0.0 0.0 0.0
1988 8501 0.0 0.0 0.0
1989 8407 0.0 0.0 0.0
1990 8135 0.0 0.0 0.0
1991 7464 0.0 0.0 0.0
1992 5018 0.0 0.0 0.0
1993 7852 0.0 0.0 0.0
1994 7728 0.0 0.0 0.0
1995 8256 0.0 0.0 0.0
1996 6213 0.0 0.0 0.0

For data sources see[5]

References