X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241110002

Well Details

Well ID: 0404241110002
Loading map...
Location: 00/10-11-040-24W4/2
Location Alias: 00/10-11-40-24 W4M
Location Alias 2: 00/10-11-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 11
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 10-11-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0033827
License Date: 1968-03-05
License Status: Abandoned
Spud Date: 1968-04-20
Final Drill Date: 1968-04-30
Well Total Depth: 1951.60 m
Surface Hole Latitude: 52.428102
Surface Hole Longitude: -113.349244

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-03-05 Obtained License
1968-04-30 Finished Drilling
1968-04-30 Well Mode changed to Drilled and Cased
1968-05-02 Production Casing Operation Performed
1968-05-21 Perforation Treatment Performed - Jet Perforation
1969-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-05-01 Perforation Treatment Performed - Cement Squeeze
1969-05-03 Perforation Treatment Performed - Jet Perforation
1969-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-04 Well Began Production
1969-05-04 Well Fluid changed to Crude Oil
1969-05-04 Well Mode changed to Flowing
1970-09-01 Well Fluid changed to Crude Oil
1970-09-01 Well Mode changed to Pumping
1994-12-15 Perforation Treatment Performed - Cement Squeeze
1994-12-16 Well Log Performed
1994-12-18 Well Log Performed
1994-12-31 Perforation Treatment Performed - Jet Perforation
1995-01-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-09 Well Began Injection
1995-01-09 Well Fluid changed to Water
1995-01-09 Well Type changed to Injection
1995-09-14 Well Log Performed
1996-12-11 Well Fluid changed to Water
1996-12-11 Well Mode changed to Closed
1996-12-11 Well Type changed to Injection
1997-01-28 Well Log Performed
1997-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-31 Perforation Treatment Performed - Cement Plug
1997-01-31 Plug Back Performed
1997-02-22 Well Abandoned
1997-02-22 Well Fluid changed to Water
1997-02-22 Well Mode changed to Abandoned
1997-02-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-05-21 Perforation 1933.00 1933.70 3
1997-01-31 Packing Device Capped w/Cement 1530.00 1884.00 0
1997-01-31 Cement Plug 424.00 632.00 0
1969-05-01 Acid Treatment 1933.00 1933.70 0
1969-05-01 Cement Squeeze 1933.00 1933.70 0
1969-05-01 Packing Device Capped w/Cement 1918.40 1919.90 0
1969-05-03 Perforation 1893.40 1894.90 3
1969-05-04 Acid Treatment 1893.40 1894.90 0
1994-12-15 Cement Squeeze 1893.40 1894.90 0
1994-12-31 Perforation 1898.30 1903.80 13
1995-01-01 Acid Treatment 1898.30 1903.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 3232 0.0 0.0 0.0
1970 5415 0.0 0.0 0.0
1971 3362 0.0 0.0 0.0
1972 1868 0.0 0.0 0.0
1973 6052 0.0 0.0 0.0
1974 1137 0.0 0.0 0.0
1975 2986 0.0 0.0 0.0
1976 462 0.0 0.0 0.0
1977 5137 0.0 0.0 0.0
1978 7344 0.0 0.0 0.0
1979 4594 0.0 0.0 0.0
1980 7050 0.0 0.0 0.0
1981 1658 0.0 0.0 0.0
1982 3669 0.0 0.0 0.0
1983 4191 0.0 0.0 0.0
1984 4700 0.0 0.0 0.0
1985 5156 0.0 0.0 0.0
1986 4116 0.0 0.0 0.0
1987 6917 0.0 0.0 0.0
1988 4176 0.0 0.0 0.0
1989 669 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References