X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241014002

Well Details

Well ID: 0404241014002
Loading map...
Location: 00/14-10-040-24W4/2
Location Alias: 00/14-10-40-24 W4M
Location Alias 2: 00/14-10-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 14-10-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0024817
License Date: 1963-09-13
License Status: Suspension
Spud Date: 1963-09-28
Final Drill Date: 1963-09-29
Well Total Depth: 1944.60 m
Surface Hole Latitude: 52.432434
Surface Hole Longitude: -113.378219

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-09-13 Obtained License
1963-09-29 Finished Drilling
1963-09-29 Well Mode changed to Drilled and Cased
1963-09-30 Perforation Treatment Performed - Jet Perforation
1963-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-05 Perforation Treatment Performed - Cement Squeeze
1963-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-07 Perforation Treatment Performed - Jet Perforation
1963-11-03 Well Began Production
1963-11-03 Well Fluid changed to Crude Oil
1963-11-03 Well Mode changed to Pumping
1970-02-10 Perforation Treatment Performed - Jet Perforation
1975-06-19 Well Fluid changed to Crude Oil
1975-06-19 Well Mode changed to Flowing
1996-04-30 Well Fluid changed to Crude Oil
1996-04-30 Well Mode changed to Suspended
2005-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-15 Plug Back Performed
2005-11-15 Well Fluid changed to Crude Oil
2005-11-15 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-30 Perforation 1930.00 1930.60 13
1963-10-01 Acid Treatment 1930.00 1930.60 0
1963-10-04 Acid Treatment 1930.00 1930.60 0
1963-10-05 Cement Squeeze 1930.00 1930.60 0
1963-10-07 Perforation 1928.20 1928.20 3
1963-10-07 Acid Treatment 1928.20 1928.20 0
1970-02-10 Perforation 1891.00 1891.10 13
2005-11-15 Packing Device Capped w/Cement 1912.00 1920.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5352 0.0 0.0 0.0
1968 1878 0.0 0.0 0.0

For data sources see[5]

References