X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241013002

Well Details

Well ID: 0404241013002
Loading map...
Location: 00/13-10-040-24W4/2
Location Alias: 00/13-10-40-24 W4M
Location Alias 2: 00/13-10-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 13-10-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0034224
License Date: 1968-06-05
License Status: Suspension
Spud Date: 1968-06-13
Final Drill Date: 1968-06-26
Well Total Depth: 1937.90 m
Surface Hole Latitude: 52.432910
Surface Hole Longitude: -113.384270

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-05 Obtained License
1968-06-26 Finished Drilling
1968-06-26 Lost Circulation Occurred
1968-06-26 Well Mode changed to Drilled and Cased
1968-06-27 Production Casing Operation Performed
1968-07-10 Perforation Treatment Performed - Acid Wash - No Pressure
1968-07-10 Perforation Treatment Performed - Selective Jet Perforations
1968-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-06 Perforation Treatment Performed - Jet Perforation
1968-08-06 Well Began Production
1968-08-06 Well Fluid changed to Crude Oil
1968-08-06 Well Mode changed to Flowing
1976-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-03 Well Log Performed
1991-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-04 Plug Back Performed
1991-09-04 Well Fluid changed to Crude Oil
1991-09-04 Well Log Performed
1991-09-04 Well Mode changed to Flowing
1991-09-09 Perforation Treatment Performed - Jet Perforation
1991-09-16 Perforation Treatment Performed - Cement Squeeze
1991-09-23 Perforation Treatment Performed - Jet Perforation
1991-09-28 Well Fluid changed to Crude Oil
1991-09-28 Well Mode changed to Pumping
1992-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-07 Perforation Treatment Performed - Cement Squeeze
1996-06-07 Well Fluid changed to Crude Oil
1996-06-07 Well Mode changed to Suspended
1996-06-11 Well Log Performed
1996-06-12 Well Fluid changed to Crude Oil
1996-06-12 Well Mode changed to Suspended
1996-06-13 Perforation Treatment Performed - Jet Perforation
1997-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-11 Well Log Performed
2005-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-13 Plug Back Performed
2005-10-14 Perforation Treatment Performed - Cement Plug
2005-10-14 Plug Back Performed
2017-11-24 Perforation Treatment Performed - Cement Plug
2017-11-24 Plug Back Performed
2017-11-24 Well Fluid changed to Crude Oil
2017-11-24 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-07-10 Selective Jet Perforations 1926.30 1926.30 0
1991-09-16 Cement Squeeze 1889.80 1894.30 0
1991-09-23 Perforation 1886.20 1888.20 18
1992-09-14 Acid Treatment 1886.20 1888.20 0
1992-10-07 Acid Treatment 1886.20 1888.20 0
1996-06-07 Cement Squeeze 1886.20 1894.20 0
1996-06-13 Perforation 1916.00 1918.50 17
1997-03-14 Acid Treatment 1916.00 1918.50 0
2005-10-13 Packing Device Capped w/Cement 1897.00 1905.00 0
2005-10-14 Cement Plug 904.00 1097.00 0
2017-11-24 Cement Plug 765.00 819.00 0
1968-07-10 Selective Jet Perforations 1927.60 1927.60 0
1968-07-10 Acid Wash 1926.30 1927.60 0
1968-07-13 Acid Treatment 1926.30 1927.60 0
1968-08-06 Perforation 1894.00 1894.30 3
1968-08-06 Acid Treatment 1894.00 1894.30 0
1976-01-13 Acid Treatment 1926.30 1927.60 0
1991-09-04 Packing Device Capped w/Cement 1916.80 1924.80 0
1991-09-09 Perforation 1889.80 1892.30 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1303 0.0 0.0 0.0
1969 2500 0.0 0.0 0.0
1970 1033 0.0 0.0 0.0
1971 72 0.0 0.0 0.0
1972 102 0.0 0.0 0.0
1973 15 0.0 0.0 0.0
1974 8 0.0 0.0 0.0
1975 1423 0.0 0.0 0.0
1977 24 0.0 0.0 0.0
1978 644 0.0 0.0 0.0
1979 5086 0.0 0.0 0.0
1980 404 0.0 0.0 0.0
1991 1732 0.0 0.0 0.0
1992 7888 0.0 0.0 0.0
1993 8289 0.0 0.0 0.0
1994 8744 0.0 0.0 0.0
1995 8197 0.0 0.0 0.0
1996 2136 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1968-06-26 Lost Circulation 1601.40 1723.90
2005-10-14 No Incident Encountered 0.00 0.00
2017-11-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References