X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241013000

Well Details

Well ID: 0404241013000
Loading map...
Location: 00/13-10-040-24W4/0
Location Alias: 00/13-10-40-24 W4M
Location Alias 2: 00/13-10-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 13-10-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0034224
License Date: 1968-06-05
License Status: Suspension
Spud Date: 1968-06-13
Final Drill Date: 1968-06-26
Well Total Depth: 1937.90 m
Surface Hole Latitude: 52.432910
Surface Hole Longitude: -113.384270

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-05 Obtained License
1968-06-26 Finished Drilling
1968-06-26 Lost Circulation Occurred
1968-06-26 Well Mode changed to Drilled and Cased
1968-06-27 Production Casing Operation Performed
1968-07-10 Perforation Treatment Performed - Acid Wash - No Pressure
1968-07-10 Perforation Treatment Performed - Selective Jet Perforations
1968-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-07-14 Well Began Production
1968-07-14 Well Fluid changed to Crude Oil
1968-07-14 Well Mode changed to Flowing
1968-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-06 Perforation Treatment Performed - Jet Perforation
1968-08-06 Well Fluid changed to Crude Oil
1968-08-06 Well Mode changed to Flowing
1976-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-16 Well Fluid changed to Crude Oil
1979-10-16 Well Mode changed to Pumping
1991-09-03 Well Log Performed
1991-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-04 Plug Back Performed
1991-09-04 Well Fluid changed to Crude Oil
1991-09-04 Well Log Performed
1991-09-04 Well Mode changed to Abandoned Zone
1991-09-09 Perforation Treatment Performed - Jet Perforation
1991-09-16 Perforation Treatment Performed - Cement Squeeze
1991-09-23 Perforation Treatment Performed - Jet Perforation
1992-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-07 Perforation Treatment Performed - Cement Squeeze
1996-06-11 Well Log Performed
1996-06-12 Well Fluid changed to Crude Oil
1996-06-12 Well Mode changed to Pumping
1996-06-13 Perforation Treatment Performed - Jet Perforation
1997-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-11 Well Log Performed
2005-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-13 Plug Back Performed
2005-10-14 Perforation Treatment Performed - Cement Plug
2005-10-14 Plug Back Performed
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended
2017-11-24 Perforation Treatment Performed - Cement Plug
2017-11-24 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-07-10 Selective Jet Perforations 1926.30 1926.30 0
1991-09-16 Cement Squeeze 1889.80 1894.30 0
1991-09-23 Perforation 1886.20 1888.20 18
1992-09-14 Acid Treatment 1886.20 1888.20 0
1992-10-07 Acid Treatment 1886.20 1888.20 0
1996-06-07 Cement Squeeze 1886.20 1894.20 0
1996-06-13 Perforation 1916.00 1918.50 17
1997-03-14 Acid Treatment 1916.00 1918.50 0
2005-10-13 Packing Device Capped w/Cement 1897.00 1905.00 0
2005-10-14 Cement Plug 904.00 1097.00 0
2017-11-24 Cement Plug 765.00 819.00 0
1968-07-10 Selective Jet Perforations 1927.60 1927.60 0
1968-07-10 Acid Wash 1926.30 1927.60 0
1968-07-13 Acid Treatment 1926.30 1927.60 0
1968-08-06 Perforation 1894.00 1894.30 3
1968-08-06 Acid Treatment 1894.00 1894.30 0
1976-01-13 Acid Treatment 1926.30 1927.60 0
1991-09-04 Packing Device Capped w/Cement 1916.80 1924.80 0
1991-09-09 Perforation 1889.80 1892.30 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1213 0.0 0.0 0.0
1969 2055 0.0 0.0 0.0
1970 2146 0.0 0.0 0.0
1971 3360 0.0 0.0 0.0
1976 24 0.0 0.0 0.0
1979 1731 0.0 0.0 0.0
1980 7539 0.0 0.0 0.0
1981 8639 0.0 0.0 0.0
1982 8234 0.0 0.0 0.0
1983 8667 0.0 0.0 0.0
1984 8302 0.0 0.0 0.0
1985 8514 0.0 0.0 0.0
1986 8055 0.0 0.0 0.0
1987 8079 0.0 0.0 0.0
1988 8651 0.0 0.0 0.0
1989 7196 0.0 0.0 0.0
1990 6343 0.0 0.0 0.0
1991 60 0.0 0.0 0.0
1996 4773 0.0 0.0 0.0
1997 7144 0.0 0.0 0.0
1998 8735 0.0 0.0 0.0
1999 7217 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1968-06-26 Lost Circulation 1601.40 1723.90
2005-10-14 No Incident Encountered 0.00 0.00
2017-11-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References