X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241009002

Well Details

Well ID: 0404241009002
Loading map...
Location: 00/09-10-040-24W4/2
Location Alias: 00/09-10-40-24 W4M
Location Alias 2: 00/09-10-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 9-10-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0027186
License Date: 1964-11-18
License Status: Suspension
Spud Date: 1964-11-25
Final Drill Date: 1964-12-10
Well Total Depth: 1924.80 m
Surface Hole Latitude: 52.428658
Surface Hole Longitude: -113.366485

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-11-18 Obtained License
1964-12-08 Drill Stem Test Performed
1964-12-09 Drill Stem Test Performed
1964-12-10 Finished Drilling
1964-12-10 Well Mode changed to Drilled and Cased
1964-12-11 Drill Stem Test Performed
1964-12-14 Drill Stem Test Performed
1964-12-17 Production Casing Operation Performed
1964-12-27 Perforation Treatment Performed - Jet Perforation
1964-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-31 Perforation Treatment Performed - Jet Perforation
1965-01-20 Well Began Production
1965-01-20 Well Fluid changed to Crude Oil
1965-01-20 Well Mode changed to Flowing
1965-03-22 Well Fluid changed to Crude Oil
1965-03-22 Well Mode changed to Pumping
1965-11-25 Lost Circulation Occurred
1967-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-31 Perforation Treatment Performed - Cement Squeeze
1967-01-31 Well Fluid changed to Crude Oil
1967-01-31 Well Mode changed to Abandoned Zone
1967-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-01 Perforation Treatment Performed - Jet Perforation
1967-02-16 Perforation Treatment Performed - Cement Squeeze
1967-02-19 Perforation Treatment Performed - Jet Perforation
1967-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-08 Perforation Treatment Performed - Cement Squeeze
1977-10-12 Perforation Treatment Performed - Cement Squeeze
1991-08-10 Perforation Treatment Performed - Jet Perforation
1991-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-08 Well Log Performed
1994-03-09 Perforation Treatment Performed - Jet Perforation
1996-05-24 Well Log Performed
1996-05-28 Perforation Treatment Performed - Jet Perforation
1997-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-24 Perforation Treatment Performed - Jet Perforation
2005-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-27 Plug Back Performed
2005-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-02 Perforation Treatment Performed - Casing Patch (Over Perfs)
2008-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-21 Plug Back Performed
2008-07-23 Perforation Treatment Performed - Jet Perforation
2008-07-23 Well Log Performed
2008-07-24 Perforation Treatment Performed - Cement Squeeze
2017-11-21 Perforation Treatment Performed - Cement Plug
2017-11-21 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-12-27 Perforation 1919.60 1919.90 13
1967-02-20 Acid Treatment 1878.50 1879.40 0
1977-10-08 Acid Treatment 1878.50 1879.40 0
1977-10-08 Cement Squeeze 1878.50 1879.40 0
1977-10-12 Cement Squeeze 1878.50 1879.40 0
1991-08-10 Perforation 1915.30 1917.80 18
1991-08-14 Acid Treatment 1915.30 1917.80 0
1994-03-09 Perforation 1911.50 1913.50 17
1996-05-28 Perforation 1870.50 1874.00 13
1997-07-04 Acid Treatment 1870.50 1874.00 0
2005-09-24 Perforation 1904.40 1905.00 17
1964-12-31 Perforation 1891.60 1891.90 13
2005-09-24 Perforation 1906.20 1907.50 17
2005-09-24 Perforation 1882.50 1884.30 17
2005-09-27 Packing Device Capped w/Cement 1892.00 1900.00 0
2005-09-29 Acid Treatment 1882.50 1884.30 0
2005-10-02 Casing Patch 1870.50 1874.00 0
2008-07-21 Packing Device Capped w/Cement 1857.00 1865.00 0
2008-07-23 Perforation 1171.00 1172.00 17
2008-07-24 Cement Squeeze 1171.00 1172.00 0
2017-11-21 Cement Plug 75.00 150.00 0
1964-12-31 Acid Treatment 1891.60 1891.90 0
1967-01-31 Acid Treatment 1891.60 1891.90 0
1967-01-31 Cement Squeeze 1891.60 1891.90 0
1967-02-01 Perforation 1882.40 1883.70 7
1967-02-01 Acid Treatment 1882.40 1883.70 0
1967-02-16 Cement Squeeze 1882.40 1883.70 0
1967-02-19 Perforation 1878.50 1879.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1141 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-11-25 Lost Circulation 201.20 201.20
2017-11-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References