X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241005000

Well Details

Well ID: 0404241005000
Loading map...
Location: 00/05-10-040-24W4/0
Location Alias: 00/05-10-40-24 W4M
Location Alias 2: 00/05-10-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 5-10-40-24
Operator Name: Ember Resources Inc.
License Number: 0313568
License Date: 2004-08-18
License Status: Amended
Spud Date: 2004-09-20
Final Drill Date: 2004-09-22
Well Total Depth: 616.50 m
Surface Hole Latitude: 52.424745
Surface Hole Longitude: -113.383744

For data sources see[1][2]

Well History

Date Event
2004-08-18 Obtained License
2004-09-20 Lost Circulation Occurred
2004-09-20 Surface Casing Operation Performed
2004-09-22 Finished Drilling
2004-09-22 Production Casing Operation Performed
2004-09-22 Rig Released
2004-09-22 Well Mode changed to Drilled and Cased
2004-10-04 Well Log Performed
2004-10-13 Perforation Treatment Performed - Jet Perforation
2004-10-14 Well Log Performed
2004-10-20 Perforation Treatment Performed - Fractured
2004-10-21 Well Began Production
2004-10-21 Well Fluid changed to Coalbed Methane-Coals Only
2004-10-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-13 Perforation 569.00 570.00 17
2004-10-13 Perforation 521.50 522.50 17
2004-10-13 Perforation 498.00 500.00 17
2004-10-13 Perforation 488.00 489.00 17
2004-10-13 Perforation 483.50 484.50 17
2004-10-13 Perforation 480.30 481.30 17
2004-10-13 Perforation 478.50 479.20 17
2004-10-13 Perforation 464.60 465.20 17
2004-10-13 Perforation 461.00 462.00 17
2004-10-13 Perforation 458.00 459.00 17
2004-10-13 Perforation 453.00 454.00 17
2004-10-13 Perforation 564.00 565.00 17
2004-10-13 Perforation 445.50 446.50 17
2004-10-13 Perforation 441.00 442.00 17
2004-10-13 Perforation 435.60 436.30 17
2004-10-13 Perforation 433.00 434.00 17
2004-10-13 Perforation 421.00 422.00 17
2004-10-13 Perforation 390.00 391.00 17
2004-10-13 Perforation 378.60 379.40 17
2004-10-13 Perforation 373.00 374.00 17
2004-10-20 Fracture 373.00 570.00 0
2004-10-13 Perforation 558.50 560.50 17
2004-10-13 Perforation 555.50 556.50 17
2004-10-13 Perforation 549.00 550.00 17
2004-10-13 Perforation 542.50 543.50 17
2004-10-13 Perforation 536.50 537.50 17
2004-10-13 Perforation 531.50 532.50 17
2004-10-13 Perforation 523.00 524.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1699 0.0 0.0 0.0
2005 8590 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8730 0.0 0.0 0.0
2008 8674 0.0 0.0 0.0
2009 8719 0.0 0.0 0.0
2010 8618 0.0 0.0 0.0
2011 8178 0.0 0.0 0.0
2012 8370 0.0 0.0 0.0
2013 8481 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8720 0.0 0.0 0.0
2017 8344 0.0 0.0 0.0
2018 8557 0.0 0.0 0.0
2019 8609 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-09-20 Lost Circulation 8.00 118.00

For data sources see[6]

References