If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404241002002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.421421,"lon":-113.372435,"icon":""}]} |
Location: 00/02-10-040-24W4/2 | |
Location Alias: 00/02-10-40-24 W4M | |
Location Alias 2: 00/02-10-040-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 10 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 2-10-40-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0030866 | |
License Date: 1966-08-24 | |
License Status: Suspension | |
Spud Date: 1966-09-02 | |
Final Drill Date: 1966-09-25 | |
Well Total Depth: 1942.20 m | |
Surface Hole Latitude: 52.421421 | |
Surface Hole Longitude: -113.372435 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-08-24 | Obtained License |
1966-09-22 | Lost Circulation Occurred |
1966-09-25 | Finished Drilling |
1966-09-25 | Lost Circulation Occurred |
1966-09-25 | Well Mode changed to Drilled and Cased |
1966-09-27 | Drill Stem Test Performed |
1966-09-28 | Drill Stem Test Performed |
1966-09-29 | Production Casing Operation Performed |
1966-10-07 | Perforation Treatment Performed - Jet Perforation |
1966-10-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
1966-10-09 | Well Began Production |
1966-10-09 | Well Fluid changed to Crude Oil |
1966-10-09 | Well Mode changed to Flowing |
1966-10-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1966-10-11 | Perforation Treatment Performed - Jet Perforation |
1979-07-19 | Well Fluid changed to Crude Oil |
1979-07-19 | Well Mode changed to Pumping |
1988-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-05-19 | Perforation Treatment Performed - Cement Squeeze |
1994-05-19 | Well Fluid changed to Crude Oil |
1994-05-19 | Well Mode changed to Pumping |
1994-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-05-20 | Perforation Treatment Performed - Cement Squeeze |
1994-05-25 | Well Log Performed |
1994-05-26 | Perforation Treatment Performed - Jet Perforation |
1994-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-05-30 | Well Log Performed |
1994-05-31 | Well Log Performed |
1994-06-01 | Perforation Treatment Performed - Cement Squeeze |
1994-06-01 | Perforation Treatment Performed - Jet Perforation |
1994-06-01 | Plug Back Performed |
1994-06-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-06-03 | Well Log Performed |
1994-06-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-27 | Plug Back Performed |
2005-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-29 | Perforation Treatment Performed - Jet Perforation |
2005-10-29 | Plug Back Performed |
2005-10-29 | Well Fluid changed to Crude Oil |
2005-10-29 | Well Log Performed |
2005-10-29 | Well Mode changed to Abandoned Zone |
2005-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-11-01 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-10-07 | Perforation | 1917.20 | 1918.70 | 7 |
1994-05-27 | Acid Treatment | 1906.70 | 1909.10 | 0 |
1994-06-01 | Cement Squeeze | 1906.70 | 1909.10 | 0 |
1994-06-01 | Perforation | 1876.20 | 1878.60 | 17 |
1994-06-02 | Acid Treatment | 1876.20 | 1878.60 | 0 |
1994-06-07 | Acid Treatment | 1876.20 | 1878.60 | 0 |
2005-10-27 | Packing Device Capped w/Cement | 1887.00 | 1895.00 | 0 |
2005-10-29 | Packing Device Capped w/Cement | 1865.20 | 1873.20 | 0 |
2005-10-29 | Perforation | 1422.00 | 1424.00 | 17 |
2005-11-01 | Packing Device Capped w/Cement | 1407.50 | 1415.50 | 0 |
1966-10-08 | Acid Wash | 1917.20 | 1918.70 | 0 |
1966-10-11 | Perforation | 1880.00 | 1881.50 | 7 |
1966-10-11 | Acid Wash | 1880.00 | 1881.50 | 0 |
1988-07-09 | Acid Treatment | 1917.20 | 1918.70 | 0 |
1994-05-19 | Cement Squeeze | 1917.20 | 1918.70 | 0 |
1994-05-20 | Acid Treatment | 1880.00 | 1881.50 | 0 |
1994-05-20 | Cement Squeeze | 1880.00 | 1881.50 | 0 |
1994-05-26 | Perforation | 1906.70 | 1909.10 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 4656 | 0.0 | 0.0 | 0.0 |
1968 | 4959 | 0.0 | 0.0 | 0.0 |
1969 | 4178 | 0.0 | 0.0 | 0.0 |
1970 | 4127 | 0.0 | 0.0 | 0.0 |
1971 | 6039 | 0.0 | 0.0 | 0.0 |
1972 | 8032 | 0.0 | 0.0 | 0.0 |
1973 | 8372 | 0.0 | 0.0 | 0.0 |
1974 | 3208 | 0.0 | 0.0 | 0.0 |
1975 | 7305 | 0.0 | 0.0 | 0.0 |
1976 | 8372 | 0.0 | 0.0 | 0.0 |
1977 | 8365 | 0.0 | 0.0 | 0.0 |
1978 | 8301 | 0.0 | 0.0 | 0.0 |
1979 | 5287 | 0.0 | 0.0 | 0.0 |
1980 | 8363 | 0.0 | 0.0 | 0.0 |
1981 | 7971 | 0.0 | 0.0 | 0.0 |
1982 | 7872 | 0.0 | 0.0 | 0.0 |
1983 | 8695 | 0.0 | 0.0 | 0.0 |
1984 | 8351 | 0.0 | 0.0 | 0.0 |
1985 | 8669 | 0.0 | 0.0 | 0.0 |
1986 | 8451 | 0.0 | 0.0 | 0.0 |
1987 | 8416 | 0.0 | 0.0 | 0.0 |
1988 | 8650 | 0.0 | 0.0 | 0.0 |
1989 | 6559 | 0.0 | 0.0 | 0.0 |
1990 | 8401 | 0.0 | 0.0 | 0.0 |
1991 | 8181 | 0.0 | 0.0 | 0.0 |
1992 | 8319 | 0.0 | 0.0 | 0.0 |
1993 | 8349 | 0.0 | 0.0 | 0.0 |
1994 | 7924 | 0.0 | 0.0 | 0.0 |
1995 | 8236 | 0.0 | 0.0 | 0.0 |
1996 | 8663 | 0.0 | 0.0 | 0.0 |
1997 | 8320 | 0.0 | 0.0 | 0.0 |
1998 | 8735 | 0.0 | 0.0 | 0.0 |
1999 | 8370 | 0.0 | 0.0 | 0.0 |
2000 | 7927 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1966-09-22 | Lost Circulation | 15.20 | 15.20 |
1966-09-25 | Lost Circulation | 192.30 | 201.20 |
1966-09-25 | Lost Circulation | 1891.90 | 1891.90 |
For data sources see[6]