X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241002000

Well Details

Well ID: 0404241002000
Loading map...
Location: 00/02-10-040-24W4/0
Location Alias: 00/02-10-40-24 W4M
Location Alias 2: 00/02-10-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 2-10-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030866
License Date: 1966-08-24
License Status: Suspension
Spud Date: 1966-09-02
Final Drill Date: 1966-09-25
Well Total Depth: 1942.20 m
Surface Hole Latitude: 52.421421
Surface Hole Longitude: -113.372435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-24 Obtained License
1966-09-22 Lost Circulation Occurred
1966-09-25 Finished Drilling
1966-09-25 Lost Circulation Occurred
1966-09-25 Well Mode changed to Drilled and Cased
1966-09-27 Drill Stem Test Performed
1966-09-28 Drill Stem Test Performed
1966-09-29 Production Casing Operation Performed
1966-10-07 Perforation Treatment Performed - Jet Perforation
1966-10-08 Perforation Treatment Performed - Acid Wash - No Pressure
1966-10-09 Well Began Production
1966-10-09 Well Fluid changed to Crude Oil
1966-10-09 Well Mode changed to Flowing
1966-10-11 Perforation Treatment Performed - Acid Wash - No Pressure
1966-10-11 Perforation Treatment Performed - Jet Perforation
1979-05-30 Well Fluid changed to Crude Oil
1979-05-30 Well Mode changed to Pumping
1988-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-19 Perforation Treatment Performed - Cement Squeeze
1994-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-20 Perforation Treatment Performed - Cement Squeeze
1994-05-25 Well Log Performed
1994-05-26 Perforation Treatment Performed - Jet Perforation
1994-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-30 Well Log Performed
1994-05-31 Well Log Performed
1994-06-01 Perforation Treatment Performed - Cement Squeeze
1994-06-01 Perforation Treatment Performed - Jet Perforation
1994-06-01 Plug Back Performed
1994-06-01 Well Fluid changed to Crude Oil
1994-06-01 Well Mode changed to Abandoned Zone
1994-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-03 Well Log Performed
1994-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-27 Plug Back Performed
2005-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-29 Perforation Treatment Performed - Jet Perforation
2005-10-29 Plug Back Performed
2005-10-29 Well Log Performed
2005-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-01 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-07 Perforation 1917.20 1918.70 7
1994-05-27 Acid Treatment 1906.70 1909.10 0
1994-06-01 Cement Squeeze 1906.70 1909.10 0
1994-06-01 Perforation 1876.20 1878.60 17
1994-06-02 Acid Treatment 1876.20 1878.60 0
1994-06-07 Acid Treatment 1876.20 1878.60 0
2005-10-27 Packing Device Capped w/Cement 1887.00 1895.00 0
2005-10-29 Packing Device Capped w/Cement 1865.20 1873.20 0
2005-10-29 Perforation 1422.00 1424.00 17
2005-11-01 Packing Device Capped w/Cement 1407.50 1415.50 0
1966-10-08 Acid Wash 1917.20 1918.70 0
1966-10-11 Perforation 1880.00 1881.50 7
1966-10-11 Acid Wash 1880.00 1881.50 0
1988-07-09 Acid Treatment 1917.20 1918.70 0
1994-05-19 Cement Squeeze 1917.20 1918.70 0
1994-05-20 Acid Treatment 1880.00 1881.50 0
1994-05-20 Cement Squeeze 1880.00 1881.50 0
1994-05-26 Perforation 1906.70 1909.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 5535 0.0 0.0 0.0
1968 5387 0.0 0.0 0.0
1969 2476 0.0 0.0 0.0
1970 3067 0.0 0.0 0.0
1971 5062 0.0 0.0 0.0
1972 7716 0.0 0.0 0.0
1973 1368 0.0 0.0 0.0
1974 138 0.0 0.0 0.0
1979 3922 0.0 0.0 0.0
1980 8447 0.0 0.0 0.0
1981 8562 0.0 0.0 0.0
1982 7896 0.0 0.0 0.0
1983 8671 0.0 0.0 0.0
1984 8351 0.0 0.0 0.0
1985 8377 0.0 0.0 0.0
1986 8380 0.0 0.0 0.0
1987 8464 0.0 0.0 0.0
1988 7469 0.0 0.0 0.0
1989 4964 0.0 0.0 0.0
1990 2012 0.0 0.0 0.0
1991 8127 0.0 0.0 0.0
1992 8451 0.0 0.0 0.0
1993 8325 0.0 0.0 0.0
1994 3119 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-09-22 Lost Circulation 15.20 15.20
1966-09-25 Lost Circulation 192.30 201.20
1966-09-25 Lost Circulation 1891.90 1891.90

For data sources see[6]

References